Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.3 LAdmitted-Finance | ₹24.3 L | L1 | Admitted-Finance |
| 2 | L2₹24.7 L+₹44,253.60 (1.82%)Admitted-Finance | ₹24.7 L+₹44,253.60 (1.82%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | R.Mariappan L1 | G.venkatesan L2 |
|---|---|---|---|---|---|
| 1.00Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. | |||||
| 1.10 | All kinds of soil | 85.31 | sqm | 2,985.85 ₹3,523.85 | 2,943.2 ₹3,473.2 Lowest |
| 2.00Earth work in excavation by mechanical means (Hydraulic excavator)! manual means over areas (exceeding 30 em in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil Note: Rate which includes for quantities of works, executed: In or under water and/or liquid mud, including pumping out water as required. | |||||
| 2.10 | Upto 1.5m depth | 29.04 | cum | 7,986 ₹9,424 Lowest | 8,349 ₹9,852 |
| 2.20 | Above 1.5m to upto 3m depth | 24.7 | cum | 13,708.5 ₹16,176.5 Lowest | 14,202.5 ₹16,759.5 |
| 2.30 | Above 3.0m to upto 4.5m depth | 24.7 | cum | 18,525 ₹21,860 Lowest | 19,883.5 ₹23,462.5 |
| 3.00Earth work in excavation by mechanical means (Hydraulic excavator}! manual means over areas (axceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge. Ordinary rack Note: Rate which includes for quantities of works, executed: In or under water and/or liquid mud, including pumping out water as required. | |||||
| 3.10 | Upto 1.5m depth | 32.26 | cum | 25,001.5 ₹29,501.5 Lowest | 25,969.3 ₹30,644.3 |
| 3.20 | Above 1.5m to upto 3m depth | 24.7 | cum | 33,345 ₹39,347 Lowest | 34,086 ₹40,222 |
| 3.30 | Above 3.0m to upto 4.5m depth | 24.7 | cum | 41,990 ₹49,548 Lowest | 45,448 ₹53,629 |
Tender Value
₹22.2 L
EMD Value
₹44,300
Closing Date
29 Jul 2026, 9:00 amClosed
Administritative officer
IIA, KORAMANGALA, Bengaluru
Construction of New well at Kodaikanal Solar Observatory, IIA - Kodaikanal
2026_IIAP_916542_1
99/CIVIL/ NEW WELL /IIA/KSO KODAIKANAL/ 2026-27
Open Tender
Civil Works
Item Rate
120 days
KSO, Kodaikanal, TN
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹44,300
KSO Kodaikanal, TN
10 Sept 2026
8 Jul 2026
30 Jul 2026
9 Jul 2026
29 Jul 2026
17 Jul 2026
16 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. | |||||
| 1.1 | All kinds of soil | 85.31 | sqm | - | - |
| 2Earth work in excavation by mechanical means (Hydraulic excavator)! manual means over areas (exceeding 30 em in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil Note: Rate which includes for quantities of works, executed: In or under water and/or liquid mud, including pumping out water as required. | |||||
| 2.1 | Upto 1.5m depth | 29.04 | cum | - | - |
| 2.2 | Above 1.5m to upto 3m depth | 24.7 | cum | - | - |
| 2.3 | Above 3.0m to upto 4.5m depth | 24.7 | cum | - | - |
| 3Earth work in excavation by mechanical means (Hydraulic excavator}! manual means over areas (axceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge. Ordinary rack Note: Rate which includes for quantities of works, executed: In or under water and/or liquid mud, including pumping out water as required. | |||||
| 3.1 | Upto 1.5m depth | 32.26 | cum | - | - |
| 3.2 | Above 1.5m to upto 3m depth | 24.7 | cum | - | - |
| 3.3 | Above 3.0m to upto 4.5m depth | 24.7 | cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
Tendernotice_2.pdf
PDF • 0.40 MB
BOQ_963216.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .