Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical VILL SOBLI P O DEVNAGAR TEHSIL RAMPUR DISTT SHIMLA H P | SHIMLA | SHIMLA | HIMACHAL PRADESH | Accepted-Technical Responsive |
| 2 | Accepted-Technical VILLAGE URU P O SHINGLA TEHSIL RAMPUR DISTT SHIMLA | Accepted-Technical Responsive |
Tender Value
₹22.8 L
EMD Value
₹45,500
Closing Date
5 Oct 2026, 9:00 amClosed
EE Rampur
EE B and R Division HPPWD Rampur
SH C.O B.wall at Km. 7.000 to 7.020 and P.L WBM G III and bituminous concrete in patches at various RDs 0.000 to 4.000
2026_PWD_144441_1
PW/RMP/TA/2026-8074 dated 19.09.2026
Open Tender
Civil Works - Roads
Percentage
EE B and R Division HPPWD Rampur
Please refer Tender documents.
11 documents required · 11 mandatory
₹500
Yes
₹45,500
Yes
7 Oct 2026
29 Sept 2026
5 Oct 2026
29 Sept 2026
5 Oct 2026
29 Sept 2026
29 Sept 2026 - 5 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in Hill area by manual/mechanical means:- Excavation in soil in hill areas all heights and depth in all kind of soil including saturated soil comprising of mixed soil, ordinary rock and hardd rock all work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution etc. and to protect stability of hill side. Rock shall be excavated with chiselling and wedging out rock( where blasting is prohibited) including cutting and trimming of side slopes and disposing of excavated earth with a lift upto all heights and all leads as directed by the Engineer-in-Charge, in conformately with the requirement of technical specification of rural roads clause 1603.1 all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases. | 33.4 | Per Cubic metre. | 350 | ₹11,690 |
| 2 | Earth work in excavation for structure in all depth as per drawing and technical specification Clause 305-1 including setting out, construction of shoring and bracin , removal of stumps and other deleterious material and disposal in all lead and lift including dressisng of sides and bottom and back filling in trenches with excavated suitable material . All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion damage to hill side water pollution etc. and to protect stability of hill side. Rock shall be excavated with chiselling and wedging out of rock( where blasting is prohibited) as directed by the Engineer-in-Charge.all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases. | 10.6 | Per Cubic meter | 559 | ₹5,925.4 |
| 3 | Providing and laying cement concrete 1:4:8 (1 cement : 4 sand :8 Graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth in breast and retaining walls etc. including carriage of material within all leads and lifts and as per HP.PWD. specifications of 1990 volume-I and as per direction of Engineer-in-charge. | 58.13 | Per cubic metre | 6,200 | ₹3,60,406 |
| 4 | Providing weep holes in brick/ stone / plain reinforced concrete abutment, wing wall, return walls with 100 mm dia PVC pipe extending through the full width of the structure with slope of 1V : 20H towards drawing face complete as per drawing and technical specifications clauses 614, 709 and 1204.3.7 including carriage of material within all leads and lifts and other incidentals. including hauling of material in all leads and lifts as per the entire satisfaction and direction of Engineer-in-Charge. | 38 | Each | 425 | ₹16,150 |
| 5 | Providing, laying , speading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thockness, hand packing, roling with smooth wheel roller 80-100KN in stages to proper grade and camber applying and brooming stonescreening/ binding materials to fill-up the interstices of course aggregate watering and compacting to the required density Grading -3 as per technical specification clause 405 including hauling of material in all leads and lifts as per the entire satisfaction and direction of the Engineer-in-Charge. | 146.83 | Per Cubic metre. | 3,809.8 | ₹5,59,392.93 |
| 6 | Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at rate of 0.70-1.0 Kg/sqm using mechanical means as per technical specification clause 502. including hauling of material in all leads and lifts as per the entire satisfaction and direction of the Engineer-in-Charge. | 1,957.76 | Per Square meter | 107.8 | ₹2,11,046.53 |
| 7 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per technical specification clause 503. including hauling of material in all leads and lifts as per the entire satisfaction and direction of the Engineer-in-Charge. | 1,957.76 | Per Square metre | 30.5 | ₹59,711.68 |
| 8 | Providing and laying 25mm thick bituminous concrete with 100-120 TPH batch type HMP proddudcing an average out put of 75mt/hr.using crushed aggregate of specified grading ,premixed with bituminous binder 5.4 to 5.6% of mix and filler transporting the Hot mix to work site laying with a hydostic paver finisher with sensor controll to the required grade,level and alignment,rolling with smooth wheeled vibratory and tendom roller to achieve the desired compection as per MORTH Specification No.508 complete in all respect including hauling of material in all leads and lifts as per the entire satisfaction and direction of Engineer-in-Charge. | 58.73 | Per Cubic metre | 17,963.8 | ₹10,55,013.97 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_214795.xls
BOQ • 7.71 MB
SBD.pdf
Tender Documents • 2.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .