Loading…
Loading…
Tender Value
₹49.0 L
EMD Value
₹98,040
Closing Date
13 Jul 2026, 4:00 pm
Executive Engineer RNb Dalgate DIvision Sgr
Executive Engineer RNb Dalgate DIvision Sgr
Repair and Renovation andDevelopment of Bala Devi Temple premises Balhama Srinagar.
2026_PWDJK_314543_7
NIT No._25_/e-tendering /DAL/2026-27/_3218-26 Dt._03-07-2026
Open Tender
Civil Works
180 days
Balhama Srinagar.
as per Nit
2 documents required · 2 mandatory
₹1,100
Executive Engineer RNb Dalgate DIvision Sgr
₹98,040
4 Jul 2026
4 Jul 2026
14 Jul 2026
4 Jul 2026
13 Jul 2026
4 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil. | 24.72 | Cum | 570.59 | ₹14,104.98 |
| 2 | P/L stone soling (Hand packed) in trenches incl. ramming, dressing, watering etc. incl. all leads, lifts and carriage upto site of work complete. | 10.26 | Cum | 805.08 | ₹8,260.12 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 10.26 | Cum | 4,409.24 | ₹45,238.8 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 61.57 | Cum | 5,585.81 | ₹3,43,918.32 |
| 5 | Chequerred precast cement concrete tiles 22mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing, cleaning and curing complete,on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand) . Dark shade using ordinary cement. | 163.57 | Sqm | 823.01 | ₹1,34,619.75 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement: 1½ coarse sand: 3 graded stone aggregate 20 mm nominal size). | 17.32 | Cum | 6,600.34 | ₹1,14,317.89 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 13.77 | Cum | 8,323.6 | ₹1,14,615.97 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for. | - | - | - | - |
| 9 | a) Foundations, footings, bases of columns etc. for mass concrete. | 211.2 | Sqm | 242.67 | ₹51,251.9 |
| 10 | b) Suspended floors, roofs, landings, balconies and access platforms | 82.16 | Sqm | 608.64 | ₹50,005.86 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
BOQ_1018413.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid