Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Finance SHOP NO 30 SANJOG PALACE MARKET KAITHAL 136027 | KAITHAL | KAITHAL | HARYANA | 136027 | -1.00% | ₹1.7 L | L1 | Admitted-Finance |
| 2 | L2₹1.7 LAdmitted-Finance | +2.00% | ₹1.7 L | L2 | Admitted-Finance |
Tender Value
₹1.7 L
EMD Value
₹3,380
Closing Date
13 Jun 2026, 3:00 pmClosed
DHARAM VIR
DIV Karnal
K-1 A/mtc of EPHS in various Sector UE Karnal
2026_HBC_527422_1
20262BF93595 8B1A 46DD B27B E262DCE37D57240HSV
Open Tender
Civil Works
30 days
Karnal
2 documents required · 2 mandatory
₹250
₹3,380
Yes
19 Jun 2026
8 Jun 2026
15 Jun 2026
8 Jun 2026
13 Jun 2026
8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [10.10.1]Providing and laying Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 1. 40 mm thick with 20 mm nominal size stone aggregate | 23.67 | Sqm | 268 | ₹6,343.56 |
| 2 | [11.11.1]12 mm cement plaster finished with a floating coat of neat cement of mix : 1. 1:3 (1 cement: 3 fine sand) | 186 | Sqm | 147 | ₹27,342 |
| 3 | [14.51.1]Hire charges for Hydraulic excavator/Loader like JCB/Pock lain, Hitachi etc with all accessories having bucket capacity 1. Hire Charges forJCB with bucket capacity of 0.4 cum | 3 | Per day | 6,493 | ₹19,479 |
| 4 | [6.14.2]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 2.17 | cum | 3,875 | ₹8,408.75 |
| 5 | [6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more | 110 | Kg. | 66 | ₹7,260 |
| 6 | [7.20.1]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) | 23.36 | cum | 4,287 | ₹1,00,144.32 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_606408.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid