Loading
Loading…
Loading…
Tender Value
Refer Docs
Closing Date
9 Nov 2022, 3:00 pmClosed
11979-VIJAYAWADA TML
This tender is being floated for factory drawing as per tender 22000044-HB-11305 terms and conditions.
GEM/2022/B/2678018
GEM/2022/B/2678018
Open Tender
Unknown (Unspecified Location)
₹0
Exempted
9 Nov 2022
22 Oct 2022
9 Nov 2022
9 Nov 2022
23 Oct 2022 - 6 Nov 2022
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | SAFETY AUDIT ASPER | SAFETY AUDIT ASPER — CARRYING OUT OF SAFETY AUDIT AS PER IS.14489.1998 - CODE OF PRACTICE ON OCCUPATIONAL SAFETY AND HEALTH AUDIT. THE GENERAL SAFETY AUDIT SHOULD ENCOMPASS ALL ASPECTS OF SAFETY NAMELY THE SAFETY MANAGEMENT SYSTEM, ELECTRICAL SAFETY, FIRE SAFETY, MECHANICAL SAFETY, MAINTENANCE, PHYSICAL & CHEMICAL. THE AUDIT IS TO BE CARRIED OUT AS PER IS 14489:1998 ON ""CODE OF PRACTICE ON OCCUPATIONAL SAFETY & HEALTH AUDIT"" AND SHOULD FULFILL ALL THE REQUIREMENTS FOR COMPLIANCE WITH THE FACTORIES ACT, 1948 AND RULES FOR RESPECTIVE STATES, THE ENVIRONMENTAL PROTECTION ACT & RULES, THE ELECTRICITY ACT & THE INDIAN ELECTRICITY RULES, THE EXPLOSIVES ACT & RULES, SMPV RULES, GAS CYLINDER RULES AND OTHER IMPORTANT INDIAN STATUTORY REQUIREMENTS AND STANDARDS AS LAID BY CCOE/PESO/OISD AND OTHER STATUTORY BODIES. THE OBJECTIVE OF SAFETY AUDIT IS TO: VERIFY COMPLIANCE WITH ESTABLISHED STANDARDS (REGULATIONS, INTERNAL POLICIES AND INDUSTRY WISE STANDARDS OF PRACTICE) IDENTIFY DEVIATION FROM DESIGNED AND PLANNED OPERATING AND MAINTENANCE PROCEDURE AND STANDARDS. IDENTIFY CONDITIONS OR OPERATING PROCEDURES THAT COULD LEAD TO AN ACCIDENT AND SIGNIFICANT LOSSES TO LIFE OR PROPERTY. | - | Lump Sum |
| 2 | PRE ENGG FOR FACTORY | PRE ENGG FOR FACTORY — 1)SITE VISIT, SURVEYING AND PREPARATION OF DRAWINGS AS PER UP FACTORY RULE 1950 SECTION 3 (I) FOR ALL SCHEDULE OF FACILITIES (TOTAL 39 NOS.) ON AUTO CAD AND PDF IN PROPER SCALE IN THREE SETS.2)DEVELOPING DETAIL DRAWINGS INCLUDING SECTION, ELEVATION OF ALL SHEDS, BUILDINGS, ROOMS, PREPARATION OF FORM-1, QUESTIONNAIRE.3)DEVELOPING PROCESS FLOW DIAGRAM AS PER UP FACTORY RULE 1950 SECTION 3 (I) SHOWING PLANT AND MACHINERY, SAFETY EQUIPMENTS POSITION IN THREE SETS.4)TRANSPORTATION, LODGING AND BOARDING CHARGES INCLUDED IN BASIC RATE. 5)SUBMISSION OF ABOVE TO FACTORY DEPARTMENT FOR APPROVAL. | - | Lump Sum |
| 3 | LIASONING FOR FACTORY | LIASONING FOR FACTORY — LIASONING FOR FACTORY APPROVAL INCLUDING PREPARATION OF DRAWINGS, FILLING IN ON LINE APPLICATION, ATTESTATION OF ALL DOCUMENTS AND APPROVAL FROM FACTORY DEPARTMENT. | - | Lump Sum |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
22000044-HB-11305.pdf
TENDER_DOCUMENT • 7.70 MB
114093.pdf
TENDER_DOCUMENT • 0.06 MB
Download all tender documents and submit your bid