Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹20.1 LAdmitted-Fee/PreQual/Technical/Finance | -49.00% | ₹20.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹20.7 L+₹60,240.13 (3.00%)Admitted-Fee/PreQual/Technical/Finance HURUM GARHA DEWARIYA BARGAWA BHURKUNDA RAMGARH CANTT RAMGARH PIN 829106 JHARKHAND | RAMGARH | JHARKHAND | 829106 | -47.47% | ₹20.7 L+₹60,240.13 (3.00%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹22.4 L+₹2.3 L (11.6%)Admitted-Fee/PreQual/Technical/Finance AT GOPALPURA COLONY P O MUGMA DIST DHANBAD 828204 | DHANBAD | JHARKHAND | 828204 | -43.10% | ₹22.4 L+₹2.3 L (11.6%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹22.8 L+₹2.7 L (13.5%)Admitted-Fee/PreQual/Technical/Finance | -42.11% | ₹22.8 L+₹2.7 L (13.5%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹23.7 L+₹3.6 L (17.8%)Admitted-Fee/PreQual/Technical/Finance KARMATAND BENIADIH AKDONI KHURD DIST GIRIDIH JHARKHAND 815311 | GIRIDIH | GIRIDIH | JHARKHAND | 815311 | -39.91% | ₹23.7 L+₹3.6 L (17.8%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹39.4 L
EMD Value
₹49,300
Closing Date
10 Sept 2026, 3:00 pmClosed
SO(C), GIRIDIH AREA
OFFICE OF THE GM, GIRIDIH AREA
Repair of Guest house under Giridih Area
2026_CCL_364527_1
GM(G)/SO(C)/ E-tender/2026-27/35 Dt. 29.08.26
Open Tender
Civil Works - Others
Percentage
120 days
GIRIDIH
Please refer Tender documents.
3 documents required · 3 mandatory
₹49,300
11 Sept 2026
29 Aug 2026
11 Sept 2026
31 Aug 2026
10 Sept 2026
31 Aug 2026
31 Aug 2026 - 7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil | 110.04 | cum | 205.8 | ₹22,646.23 |
| 2 | Providing and laying in position cement concrete of specified grade excluding
the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20
mm nominal size) | 17.97 | cum | 6,773.95 | ₹1,21,727.88 |
| 3 | Brick work with common burnt clay F.P.S. (non modular) bricks of class
designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) | 54.36 | cum | 6,770.05 | ₹3,68,019.92 |
| 4 | Brick work with common burnt clay F.P.S. (non modular) bricks of class
designation 7.5 in superstructure above plinth level up to floor V level in all
shapes and sizes in : Cement mortar 1:6(1 cement: 6 coarse sand) | 81.82 | cum | 7,988.95 | ₹6,53,655.89 |
| 5 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks ofclass designation 7.5 in foundations and plinth in : cement mortar 1:4 (1 cement : 4 coarse sand) | 18 | sqm | 844.15 | ₹15,194.7 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate
20 mm nominal size) | 8.25 | cum | 8,343.45 | ₹68,833.46 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate
20 mm nominal size) | 4.52 | cum | 9,466 | ₹42,786.32 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars | 957.75 | kg | 105.6 | ₹1,01,138.4 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete | 54.48 | sqm | 277.9 | ₹15,139.99 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers | 19.97 | sqm | 513.35 | ₹10,251.6 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.74 MB
BOQ_377449.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .