| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.3 LAdmitted-Finance | -37.86% | ₹15.3 L | L1 | Admitted-Finance |
| 2 | L2₹17.7 L+₹2.5 L (16.1%)Admitted-Finance | -27.86% | ₹17.7 L+₹2.5 L (16.1%) | L2 | Admitted-Finance |
| 3 | L3₹18.3 L+₹3.1 L (20.0%)Admitted-Finance | -25.45% | ₹18.3 L+₹3.1 L (20.0%) | L3 | Admitted-Finance |
| 4 | L4₹18.9 L+₹3.7 L (23.9%)Admitted-Finance | -23.00% | ₹18.9 L+₹3.7 L (23.9%) | L4 | Admitted-Finance |
| 5 | L5₹20.2 L+₹4.9 L (32.0%)Admitted-Finance KURUNDWAD MAHARASHTRA | -18.00% | ₹20.2 L+₹4.9 L (32.0%) | L5 | Admitted-Finance |
Tender Value
₹24.6 L
EMD Value
₹25,000
Closing Date
14 Jul 2026, 5:00 pmClosed
Office of the EE DPDC NMC Nagpur
Office of the EE DPDC NMC Nagpur
PROVIDING and LAYING STORM WATER DRAIN LINE AT ABHYANKAR NAGAR IN PRABAHG NO. 13
2026_NMCN_1312051_1
2/38/EEDPDC/2026
Open Tender
Civil Works
Percentage
180 days
(Work ) Office of the EE DPDC NMC Nagpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹25,000
22 Sept 2026
7 Jul 2026
15 Jul 2026
7 Jul 2026
14 Jul 2026
7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Removing rich mix cement concrete including stacking the spoils as directed with all leads, lifts etc, complete. | 18.9 | CUM | 968 | ₹18,295.2 |
| 1.02 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as
directed all sorts of soils. | 575.04 | CUM | 123 | ₹70,729.33 |
| 1.03 | Providing and laying cement concrete pipe of IS 458:2003 NP-2 class of 450mm diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and
curing etc. complete. | 493 | RMT | 2,089 | ₹10,29,877 |
| 1.04 | Providing and laying concrete pipes of I.S.NP. class of 300mm diameter in proper line, level and slope including necessary collars, excavation, laying, fixing with collars in cement mortar 1:1 and refilling the trench complete. | 100 | RMT | 801 | ₹80,100 |
| 1.05 | Providing soling using 80 mm size granite / quartzite / gneiss / trap metal in 15 cm. layer including hand packing filling voids with sand / grit, ramming, watering complete. (Spec. No. : As directed by Engineer-in-charge /Page No. 154) | 5.32 | Cum | 2,862 | ₹15,238.43 |
| 1.06 | Providing and laying in situ / ready mix / ready mix M10 cement concrete of trap/ granite/ quartzite/ gneiss metal in foundation including necessary centering, formwork, bailing out water, compacting and curing etc. complete. (with fully automatic micro processor based PLC with SCADA enabled with reversible drum type mixer/ concrete batch mix plant (pan mixer) with natural /artifical sand) | 47.92 | Cum | 6,545 | ₹3,13,633.78 |
| 1.07 | Providing and laying in situ / ready mix M-20 controlled reinforced cement concrete of trap metal for raft slab including "V" haunches, formwork, scaffolding, compaction by vibrating, finishing curing etc. complete. concrete batch mix plant / pan mixer with fine agreegates of required specifications ( VSI sand finely washed etc ) etc. complete. (excluding reinforcement).
a) RCC Grade with reversible drum type mixer/ concrete batch mix plant (pan mixer) . | 5.32 | CUM | 6,993 | ₹37,233.53 |
| 1.08 | Providing and laying in situ / ready mix controlled grade of M20 of trap /granite /quartzite
/gneiss metal for RCC works in cut off walls / curtain walls including necessary scaffolding, centering, compacting by vibrator, finishing and curing etc. complete. (with fully automatic micro processor based PLC with SCADA enabled with reversible drum type mixer/ concrete batch mix plant (pan mixer) with fine agreegates of required specifications ( VSI sand finely washed etc ), excluding reinforcement) | 9.99 | Cum | 8,964 | ₹89,569.4 |
| 1.09 | Providing, cutting, bending, hooking, tying and laying in position TMT FE 500 steel bars for reinforcement for all RCC works as per detailed drawings etc. complete. | 1.23 | M.T. | 92,758 | ₹1,13,658.41 |
| 1.1 | Providing and fixing precast 125 mm thick slotted covers casted in M-30 with reinforcement of 10 mm dia bars both way @ 150 mm c/c tied with tack welding, with 2 hooks of 12 mm dia bars finishing in c.m.1:3 etc.complete. | 2 | Each | 1,537 | ₹3,074 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
DTP.pdf
Tender Documents • 2.22 MB
BOQ_2250306.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .