Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.2 LAccepted-AOC AT BHELWATAND CHURI POST RAY P S KHALARI DISTT RANCHI JHARKHAND | RANCHI | JHARKHAND | 829205 | ₹16.2 L | L1 | Accepted-AOC Quoted rate is 9.00 percent Above |
| 2 | Rejected-Technical | - | - | Rejected-Technical unsuccessful not being lowest bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical unsuccessful not being lowest bidder |
Tender Value
₹14.9 L
EMD Value
₹18,700
Closing Date
5 Jun 2026, 11:00 amClosed
Staff Officer (Civil), PPR Area
GM OFFICE PPR AREA
Repair of main drain in Bishujhapa colony and Bazartand under GM Unit, PIparwar Area.
2026_CCL_360232_1
GM(PPR)/Civil/Etender26-27/327
Open Tender
Civil Works - Others
Percentage
60 days
Bishujhapa colony and Bazartand
AS PER NIT
3 documents required · 3 mandatory
₹18,700
9 Jul 2026
25 May 2026
6 Jun 2026
26 May 2026
5 Jun 2026
26 May 2026
26 May 2026 - 1 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by mechanical means (Hydraulic
excavator)/manualmeansoverareas(exceeding30cmindepth,1.5min
widthaswellas10sqmonplan)includinggettingoutanddisposalof
excavatedearthleadupto50mandforalllift,asdirectedbyEngineer-in-
charge. All kinds of soil | 1 | Cum | 128.05 | ₹127.92 |
| 1.02 | Supplying and filling in plinth with sand under floors, including watering,
ramming, consolidating and dressing complete. | 1 | Cum | 1,844 | ₹1,842.16 |
| 1.03 | Providingandlayinginpositioncementconcreteofspecifiedgrade
excluding the cost of centering and shuttering - All work up to plinth level :1:4:8(1Cement:4coarsesand(zone-Ill)derivedfromnaturalsources:8
graded stone aggregate 40 mm nominal size derived from natural sources) | 1 | Cum | 5,167.75 | ₹5,162.58 |
| 1.04 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1cement:1.5coarsesand(zone-III)derivedfromnaturalsources:
3 graded stone aggregate 20 mm nominal size de rived from natural sources) | - | Cum | 7,365.5 | - |
| 1.05 | SteelreinforcementforR.C.C.workincludingstraightening,cutting,bending,
placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | Kg | 75.85 | - |
| 1.06 | Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns | - | sqm | 262.55 | - |
| 1.07 | Carriage of material mechanical transpot including loading, unloading and stacking earth lead - 5KM | - | Cum | 210.1 | - |
| 1.08 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_373099.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.78 MB
BOQ_373099.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .