Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.3 LAccepted-AOC 4 DALURBANDH PANDAVESWAR PANDAVESWAR BARDHAMAN WEST BENGAL 713346 UDYAM WB 03 0006114 | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | ₹5.3 L | 1 | Accepted-AOC Eligible L-1 Bidder |
| 2 | 2₹5.3 L+₹1,948.98 (0.37%)Rejected-Finance GOPALMATH DURGAPUR DIST PASCHIM BARDHAMAN PIN 713217 W B | DURGAPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713217 | ₹5.3 L+₹1,948.98 (0.37%) | 2 | Rejected-Finance Quoted Rate more than L-1 Bidder |
| 3 | 3₹5.4 L+₹3,213.85 (0.60%)Rejected-Finance VILL PO CHINCHURIA BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | ₹5.4 L+₹3,213.85 (0.60%) | 3 | Rejected-Finance Quoted Rate more than L-1 Bidder |
Tender Value
₹5.1 L
EMD Value
₹6,400
Closing Date
5 Mar 2024, 5:00 pmClosed
AE EnM
Sonepur Bazari Area
Diversion/erection/dismantling of F-10 to create space for mining operations and to feed power to different HEMMs in mines at sonepur bazari project.
2024_ECL_302413_1
GM/SBA/EnM/e-Tender/23-24/396
Open Tender
Electrical and Maintenance Works
Item Rate
21 days
Sonepur Bazari Area
Please refer tender documents.
6 documents required · 6 mandatory
₹6,400
23 Mar 2024
23 Feb 2024
7 Mar 2024
24 Feb 2024
5 Mar 2024
24 Feb 2024
24 Feb 2024 - 27 Feb 2024
Amount
Item Description/ Heading
Material Cost
Erection of 11/12/13/16 m long Steel Tubular pole with cement concrete.
Supply fabrication, hoisting and erection of phase and earth bracket and painting with red oxide primer.
Supply and erection of nuts, bolts flats and erection of clamps.
Supply of 11 KV disc insulator and hardware
Supply of 11 KV Pin insulator and hardware
Supply of 7/14 SWG GI wire for earth coontinuity and 6/8 SWG for making and erection of cradle guard.
Supply and erection of HT Stay Set complete with stay plate, stay insulator, stay wire of required dimension and specification.
Erection of earth pit with supply of all required material
Labour Cost:-
Erection of 11/12/13/16 m long Steel Tubular pole with cement concrete.
Fabrication, hoisting and erection of phase and earth bracket and painting with red oxide primer.
Erection of nuts, bolts flats and erection of clamps.
Installation of 11 KV disc insulator and hardware
Installation of 11 KV Pin insulator and hardware
Fixing of 7/14 SWG GI wire for earth coontinuity and 6/8 SWG for making and erection of cradle guard.
Fixing and erection of HT Stay Set complete with stay plate, stay insulator, stay wire of required dimension and specification.
Stringing of ACSR Dog/ Wolf Conductor.
Erection of earth pit with supply of all required material
Dismantling of 16 m /13 m long Steel Tubular Pole with cement concrete.
Dismantling of phase and earth bracket, angles, channels etc.
Dismantling of 11 KV disc/pin insulator and hardware.
Dismantling of ACSR Dog/ Wolf Conductor.
P. F. amount for labour cost
Total impact of GST for the purpose of CTC
EVERGREEN ENTERPRISE
JAY MAA DAL DALI KALI
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_313275.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .