| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹21.5 LAccepted-AOC | ₹21.5 L | l1 | Accepted-AOC aoc |
| 2 | l2₹24.9 LRejected-Finance | ₹24.9 L | l2 | Rejected-Finance rejted |
| 3 | l3₹25.1 LRejected-Finance | ₹25.1 L | l3 | Rejected-Finance rejted |
| 4 | l4₹26.0 LRejected-Finance 1 RAMGANJ CHOTTA IMAMBADA RANIBAZAR GONDA UTTAR PRADESH 271002 UDYAM UP 31 0005563 | GONDA | UTTAR PRADESH | 271002 | ₹26.0 L | l4 | Rejected-Finance rejted |
| 5 | l5₹30.5 LRejected-Finance | ₹30.5 L | l5 | Rejected-Finance rejted |
Tender Value
₹30.2 L
EMD Value
₹3.0 L
Closing Date
20 Mar 2026, 12:00 pmClosed
E.E., Construction Division, P.W.D., Jaunpur
E.E., Construction Division, P.W.D., Jaunpur
Construction of Bhasot Bankat Link road se Gulab Tripathi ke pamping set hote hue saroj basti tak Link Road in Distt Jaunpur
2026_CEUVZ_1125438_3
442/9A/2026 Dated 27.02.2026
Open Tender
Civil Works - Roads
120 days
Jaunpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹3.0 L
Yes
30 Apr 2026
14 Mar 2026
20 Mar 2026
14 Mar 2026
20 Mar 2026
14 Mar 2026
Construction of Embankment with Material Obtained from R.O.W. Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 Including All material T&P, Labour cess etc But Excluding cost of GST
Providing, laying and spreading Material on a prepared sub grade, adding cement @ 2% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base (CTSB) Including All material T&P, Labour cess etc But Excluding cost of GST
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on preared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achive the desired denisty, complete as per Technical Specification clause 401. Including All material T&P, Labour cess etc But Excluding cost of GST
Providing, laying and spreading Material on a prepared sub base, cement @ 4% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base (CTB) .Including All material T&P, Labour cess etc But Excluding cost of GST
Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. Including All material T&P, Labour cess etc But Excluding cost of GST and Bitumen
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type C as per Technical Specification Clause 508. Including All material T&P, Labour cess etc But Excluding cost of GST and Emulsion
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 Including All material T&P, Labour cess etc But Excluding cost of GST and Emulsion
Construction of subgrade & earthen shoulder with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 Including All material T&P, Labour cess etc But Excluding cost of GST
PART A Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17.02.2024
1st year- maintainance cost 0% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
2nd year- maintainance cost 0.75% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
3rd year- maintainance cost 1.50 % on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
4th year- maintainance cost 2.25% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
5th year- maintainance cost 3.00 % on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.88 MB
BOQ_2097957.xls
BOQ • 0.42 MB
T1For442.pdf
Tender Documents • 0.85 MB
Download all tender documents and submit your bid