Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.8 LAccepted-AOC | ₹19.8 L | L1 | Accepted-AOC Accepted. |
| 2 | L2₹19.9 L+₹1,993.67 (0.10%)Rejected-Finance B 126 SWARAN JAYANTI VISTAR SANIGAWAN KANPUR | ₹19.9 L+₹1,993.67 (0.10%) | L2 | Rejected-Finance NA |
| 3 | L3₹19.9 L+₹3,987.34 (0.20%)Rejected-Finance | ₹19.9 L+₹3,987.34 (0.20%) | L3 | Rejected-Finance NA |
Tender Value
Refer Docs
EMD Value
₹65,140
Closing Date
27 Feb 2026, 12:00 pmClosed
EE RED Pratapgarh
EE RED Pratapgarh
Work of Passenger Lift in Office of District Election Office and EVM ware House in Pratapgarh
2026_REDUP_1118813_1
61/Etender/25-26 dt 28-01-2026
Open Tender
Civil Works
Percentage
180 days
Pratapgarh
As per NIT
2 documents required · 2 mandatory
₹3,000
₹65,140
23 Jul 2026
21 Feb 2026
27 Feb 2026
21 Feb 2026
27 Feb 2026
21 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 118 % GST Extra | |||||
| 1.01 | Dismentling cement concrete or brick or granolite floors including base concrete and including stacking of dismental materials as directed by the engineer-in- charge with ina distence of 60 mt SI 697 | 16.9 | Sqm | 51 | ₹861.9 |
| - | Earth work in excavation in foundation in ordinary soil inclunding with all complete. Including royalty as per S.I. No. 251 | 33.8 | Cum | 160 | ₹5,408 |
| - | Providing and laying Cement concrete 1:4:8 (1 cement : 4coarse sand : 8 graded stone ballast 40 mm nominal size) including supply of all materials.labour and T&P etc. required for proper completion of the work and curing complete. also including cost of formwork in foundation S.I. No. 281 | 2.53 | Cum | 5,800 | ₹14,674 |
| - | R.C.C. work with cement approved coarse sand and 2 cm. (3/4") gauge approved stone ballast in the proportion of 1:1.5:3 (M-20) in raft foundation and footing excluding supply of reinforcement and its binding but B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T & P etc.required for proper completion of the work. Binding wire cost being included in the item M-20 S.I. NO. 287(A) | 12.22 | Cum | 7,800 | ₹95,316 |
| - | R.C.C. work with cement approved coarse sand and 2 cm. (3/4") gauge approved stone ballast in the proportion of 1:1.5:3 (M-20) in columns excluding supply of reinforcement and its binding but B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T & P etc.required for proper completion of the work. Binding wire cost being included in the item M-20 S.I. NO. 289 | 6.15 | Cum | 9,800 | ₹60,270 |
| - | R.C.C. work with cement approved coarse sand and 2 cm. (3/4") gauge approved stone ballast in the proportion of 1:1.5:3 (M-20) in lintels of doors and windows excluding supply of reinforcement and its binding but B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T & P etc.required for proper completion of the work. Binding wire cost being included in the item M-20 S.I. NO. 283 (A) | 0.35 | Cum | 8,100 | ₹2,835 |
| - | R.C.C. work with cement approved coarse sand and 2 cm. (3/4") gauge approved stone ballast in the proportion of 1:1.5:3 (M-20) in Beam excluding supply of reinforcement and its binding but B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T & P etc.required for proper completion of the work. Binding wire cost being included in the item M-20 S.I. NO. 285 | 4.24 | Cum | 9,200 | ₹39,008 |
| - | R.C.C. work with cement approved coarse sand and 2 cm. (3/4") gauge approved stone ballast in the proportion of 1:1.5:3 (M-20) in Sab excluding supply of reinforcement and its binding but B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T & P etc.required for proper completion of the work. Binding wire cost being included in the item S.I. NO. 284 | 3.51 | Cum | 8,650 | ₹30,361.5 |
| - | HYSD Steel or Iron in plain work such as RCC or R.B. work wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel & wastage and over lapping and hooks. SI.No 504 | 39.39 | Qtl | 6,150 | ₹2,42,248.5 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.23 MB
BOQ_2079804.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .