Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-AOC AT PO LAIYO DIST RAMGARH JHARKHAND | LAIYO | RAMGARH | JHARKHAND | 825325 | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.0 L+₹19,385.04 (5.03%)Rejected-AOC KEDLA 03 NO MORE RAMGARH JHARKHAND 825325 | RAMGARH | RAMGARH | JHARKHAND | 825325 | L2 | Rejected-AOC L2 | |
| 3 | L3₹4.1 L+₹27,173.04 (7.05%)Rejected-AOC AT KUNDA P O JARANGDIH DIST BOKARO | KUNDA | BOKARO | L3 | Rejected-AOC L3 |
Tender Value
Refer Docs
EMD Value
₹4,900
Closing Date
30 Nov 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Manoj Kumar Mishra Project Engineer (Excv)
Jharkhand OCP, PO-Kedla, Dist- Ramgarh, Pin- 825325
Repairing of Operator cabin, Track Frame (LH and RH), Final drive drum of BD355 Dozer sl. no. 11589 and BD155 Dozer sl. no. 13720 of Jharkhand OCP.
2023_CCL_294331_1
PE(X)/JOCP/NIT/23-24/61 Dated- 22.11.2023
Open Tender
Excavation Department Work
Item Rate
5 days
Jharkhand OCP
As per tender document
2 documents required · 2 mandatory
₹4,900
9 Dec 2023
22 Nov 2023
1 Dec 2023
22 Nov 2023
30 Nov 2023
22 Nov 2023
22 Nov 2023 - 27 Nov 2023
Amount
Industrial gas set for heating of Frame, angles and plate.
Cutting electrode for removal of bulged material from different portion of track frame and Final drive drum.
Material filling in Track frame and final drive drum in gauged portion. [Lomet 205]
Portable machining charge of surface finish upto proper size and dimension.
Grinding stone for surface finish of welded portion – 4”
Safety glass (size 6.25 sq.ft.) – 04 nos.
Safety glass (size 12.5 sq. ft.) – 02 nos.
Cutting and fitting charge of glass.
Rubber bead and its lock key change.
Replacement of lock handle set.
Operator seat repairing.
Cabin ceiling (ply, rexin, foam, replacement etc.)
Welder - (04 person X 05 days)
Fitter - (04 person X 05 days)
Helper - (08 person X 05 days)
Total impact of GST for the purpose of CTC
Ayan Enterprises
M/s Kamrul Construction
stage.html
html • 0.04 MB
techsummary_304854.pdf
PDF • 0.26 MB
finsummary_304854.pdf
PDF • 0.26 MB
workorder.pdf
PDF • 0.31 MB
finance_304854.pdf
PDF • 0.26 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .