| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 CrAccepted-AOC AT ROAD BOKAKHAT ASSAM | ₹7.3 Cr | L1 | Accepted-AOC Work Order Issued |
| 2 | L2₹7.7 CrRejected-AOC 14 BILASIPARA P O P S BILASIPARA DIST DHUBRI ASSAM PIN 783348 | DHUBRI | ASSAM | 783348 | ₹7.7 Cr | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical BRIGHTWELL ROAD BARIK SHILLONG 793001 MEGHALAYA | - | - | Rejected-Technical Non-Responsive |
| Sl No | Description | Qty | Unit | M/S. M.P. AGARWALLA L1 | Shree Gautam Construction Co. Ltd. L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 7,46,042.76 | Sqm | 10 ₹74.6 L | 7 ₹52.2 L |
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 6,869.92 | Cum | 140 ₹9.6 L | 250 ₹17.2 L |
| 3.00 | Brick Flat soling
(With traditional brick size 0.23mx0.115mx0.075m) | 12,699.98 | Sqm | 700 ₹88.9 L | 600 ₹76.2 L |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 452.89 | Cum | 8,000 ₹36.2 L | 8,000 ₹36.2 L |
| 5.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,87,514.45 | Kg | 95 ₹1.8 Cr | 95 ₹1.8 Cr |
| 6.00 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete | 8,069.05 | Sqm | 350 ₹28.2 L | 600 ₹48.4 L |
| 7.00 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 8,770.7 | Sqm | 650 ₹57.0 L | 600 ₹52.6 L |
| 8.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2,131.05 | Cum | 8,500 ₹1.8 Cr | 9,500 ₹2.0 Cr |
| 9.00 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 45,256.83 | Kg | 96 ₹43.4 L | 150 ₹67.9 L |
| 10.00 | Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used.
With G.I. barbed wire. | 1,33,952.56 | Meter | 22 ₹29.5 L | 25 ₹33.5 L |
Tender Value
₹7.3 Cr
EMD Value
₹14.6 L
Closing Date
10 Jun 2025, 2:00 pmClosed
CE, PWD(Bldg), Assam, Chandmari, Ghy-3
O/O The CE, PWD(Bldg), Assam, Chandmari, Ghy-3
Construction of Barbed wire fencing of Barua Bamun Gaon Sugar Mill under Khumtai LAC in Golaghat District
2025_PWBNH_44350_1
T/TB-1/11/2024/39 Dated 14 /05/2025
Open Tender
Civil Works - Building
120 days
Golaghat
Please refer Tender documents.
5 documents required · 5 mandatory
₹14,610
Yes
₹14.6 L
Yes
O/O The CE, PWD(Bldg), Assam, Chandmari, Ghy-3
5 Feb 2026
17 May 2025
10 Jun 2025
17 May 2025
10 Jun 2025
22 May 2025
20 May 2025
Amount
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
Brick Flat soling (With traditional brick size 0.23mx0.115mx0.075m)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
Lintels, beams, plinth beams, girders, bressumers and cantilevers
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire.
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes
Shree Gautam Construction Co. Ltd. (BID ID -269554)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tenderdocument.pdf
Tender Documents • 0.26 MB
BOQ.xls
BOQ • 0.35 MB
Tenderdocument_2.pdf
Tender Documents • 2.47 MB
Download all tender documents and submit your bid