| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.0 LAccepted-Finance | L1 | Accepted-Finance Admitted | |
| 2 | L2₹15.4 L+₹39,336.92 (2.61%)Accepted-Finance | L2 | Accepted-Finance Admitted |
Tender Value
₹15.4 L
EMD Value
₹16,000
Closing Date
22 Dec 2022, 3:00 pmClosed
The Block Development Officer V.P Kelamangalam
BDO Office Kelamangalam
Krishnagiri District Kelamangalam Block under AGAMT 2022_2023 Repair of weir wall and Desilting of Devagoundan Eri 1 No Repair of weir wall Desilting of Gundalur Eri 1No in Nagamangalam Panchayat Package No TN-KLM-008
2022_RDTN_272693_1
RocNo_5214_2022_R10_12_10_2022
Open Tender
Civil Works - Others
Item Rate
180 days
BDO Office Kelamangalam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹16,000
Yes
BDO Office Kelamangalam
6 Jan 2023
15 Dec 2022
22 Dec 2022
15 Dec 2022
22 Dec 2022
16 Dec 2022
20 Dec 2022
Amount
1.Repair of Weir Wall and Desiliting of Devegoundan eri and Strenthening of bund H/O Nagamangalam Rs.6.50000/- Lakhs
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth up to 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Volume of Earth Work in Existing Bund (including Consolidation using Power Roller)
Volume of Earth in New Bund (No Consolidation)
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., all complete.
Provision For Name Board Arrangements
Provision For Boundary Stones
Construction of Surplus Weir (Sub Estimate)
Earth work excavation for foundation in all soils and sub soil to full depth as may be directed except in hard rock inclusive of shoring and requiring the sides of foundation SS20A
For Foundation 0.00m - 0.30m depth
For Foundation 0.30m - 0.60m depth
For Foundation above 0.60m depth
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
2. Repair of Weir Wall and Desiliting of Gundalur eri and Strenthening of bund (SC -187,ST-64) H/O Nagamangalam Rs.8.91800/- Lakhs
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth up to 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Volume of Earth Work in Existing Bund (including Consolidation using Power Roller)
Volume of Earth in New Bund (No Consolidation)
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., all complete.
Provision For Name Board Arrangements
Construction of Surplus Weir (Sub Estimate)
Earth work excavation for foundation in all soils and sub soil to full depth as may be directed except in hard rock inclusive of shoring and requiring the sides of foundation SS20A
For Foundation 0.00m - 0.30m depth
For Foundation 0.30m - 0.60m depth
For Foundation above 0.60m depth
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
PAPPANAN CONTARCTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .