Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.7 LAccepted-AOC | L-1 | Accepted-AOC Supply Order Placed |
Tender Value
Refer Docs
EMD Value
₹8,500
Closing Date
22 Mar 2023, 2:00 pmClosed
Executive Engineer, W.S. Mech. Division, Rewari
Executive Engineer, W.S. Mech. Division, Rewari
Special Repair Rewinding of 1 No. HT Motor Crompton Greaves (Sr. No. 2161546 -7) at Pump House JF-1
2023_HRY_264477_6
587/6-A dated 09.03.2023
Open Tender
Pumps/Motors
Works
60 days
Executive Engineer, W.S. Mech. Division
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
₹8,500
Yes
11 May 2023
10 Mar 2023
22 Mar 2023
10 Mar 2023
22 Mar 2023
10 Mar 2023
Amount
Dismantling of complete motor and strips for rewinding / reinsulation work of complete motor 328/325mHP(CG Make)
Replacement of new strips / coils of super enameled glass copper strip in place of damaged strip/coil (total coils in one motor are 90 No.)
Re-insulation of strips/coils including all insulation material required (total coils in one motor are 90 Nos.)
Replacement of space heater
Cleaning by MTO & varnishing of rotor
Fiber cover of motor
Repairing of bearing seat of motor by re-metaling and turning / machining as per bearing size
Rotor / main shaft rebuilding / repairing by welding or brazing and turning, making of groove for lock on periphery
Replacement of ball bearing 6026 (FAG Make)`
Complete assembling of motor including essential item left out if any and testing /commissioning of 328 / 325 HP (CG make ) at Pump House.
Credit of old copper scrap (approx).
Terms & Conditions:- 1. The tender rate will be inclusive all taxes as applicable including GST. 2. The tender rate will be for F.O.R. destination and inclusive of all incidental charges, enroute & at destination. Nothing extra shall be paid separately. 3. WWC@1% will be deducted from the each bill of the agency. 4. The rate should be inclusive carriage, fitting and allied parts complete in all respect with left over items (if any) as per site requirement. 5. Goods which to be used / supplied should be as per sample and conforming to the site condition & also conforming to I.S. Specification. 6. Department will not be responsible for non submission of BOQ / Bid Document online by due date, due to any fault of internet/ E-tendering. 7. Completion period – completion period is 3 Months. 8. Warranty must be 18 Months or 2500 Operation hours, whichever is earlier from the date of acceptance. 9. Payment schedule, as per bidding documents. 10. Each page of bid book will be signed by the tenderer as a token of acceptance of terms and conditions. 11. Agencies carrying out the rewind / repair work of motor LT motor. 12. Actual weight of old scrap will be assessed by the committee of 2 SDO’s and will be retain by the agency. 13. During the past two years the bidder should have executed 25% quantity of items of same nature and shall furnish their performance certificate. 14. The bidder must create their contractor ID on HEW portal (http://works.haryana.gov.in) and accordingly upload the contractor profile summary in bidding documents, failing which the bid will be rejected.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .