Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAdmitted-Finance KULLANDI STREET PALLIPATTI PO METTUR TK SALEM 636458 | SALEM | SALEM | TAMIL NADU | 636458 | ₹2.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.1 Cr+₹18.7 L (9.54%)Admitted-Finance | ₹2.1 Cr+₹18.7 L (9.54%) | L2 | Admitted-Finance |
| 3 | L3₹2.2 Cr+₹21.9 L (11.2%)Admitted-Finance 7 145 MALLIKUNDAM PO MECHARI VIA MALLIKUNDAM VIA METTUR TK SALEM DT | ₹2.2 Cr+₹21.9 L (11.2%) | L3 | Admitted-Finance |
| 4 | L4₹2.2 Cr+₹24.2 L (12.3%)Admitted-Finance MIG 354 4TH CROSS STREET MOGAPPAIR ERI SCHEME CHENNAI 37 | CHENNAI | ₹2.2 Cr+₹24.2 L (12.3%) | L4 | Admitted-Finance |
| 5 | L5₹2.4 Cr+₹47.5 L (24.3%)Admitted-Finance NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | ₹2.4 Cr+₹47.5 L (24.3%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | C.GOVINDAN L1 | BVD Power Private Limited L2 | M s Kumaresan and co L3 | ULTRAPOWER BUILDERS L4 | K DHINAKARAN L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing of scrub jungle including all cost of labour, lead, lift etc complete. | 9,170 | sqm | - | - | - | - | - |
| 2.00 | Conducting check survey,pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour, lead lift etc complete. | 10 | Loc | - | - | - | - | - |
| 3.00 | Earthwork excavation in hard stiff clay, black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil inlcuding all cost of lead lift etc complete. | 2,475 | cum | - | - | - | - | - |
| 4.00 | Earthwork excavation in soft disintegrated rock or kankar not requiring blasting. | 619 | cum | - | - | - | - | - |
| 5.00 | Earthwork excavation in MR and DMR not requiring blasting. | 413 | cum | - | - | - | - | - |
| 6.00 | Earthwork excavtion in hard rock measured in solid including blasting etc.,complete | 413 | cum | - | - | - | - | - |
| 7.00 | Removing hard rock by wedging, chissellingand trimming to proper shape where blasting is prohibited | 207 | cum | - | - | - | - | - |
| 8.00 | Transporting and fixing of stub and cleat with template to site and assembling at site and shifting the template from loc to loc including cost of all materials for stub and cleat and template ,labour, fabrication charges etc complete., for KCR | 2 | Loc | - | - | - | - | - |
| 9.00 | Transporting and fixing of stub and cleat with template to site and assembling at site and shifting the template from loc to loc including cost of all materials for stub and cleat and template ,labour, fabrication charges etc complete., for QD | 1 | Loc | - | - | - | - | - |
| 10.00 | Transporting and fixing of stub and cleat with template to site and assembling at site and shifting the template from loc to loc including cost of all materials for stub and cleat and template ,labour, fabrication charges etc complete., for QC | 2 | Loc | - | - | - | - | - |
Tender Value
₹2.5 Cr
EMD Value
₹2.5 L
Closing Date
30 Dec 2019, 2:30 pmClosed
CE/TP-I/CHN
A-10, THIRU VI KA Industrial Estate, Guindy, Chennai -32.
EWE,stub setting, concreting of Loc.58, 58A, 59 of MTPS-Salem 230 KV LILO line, Loc.1,1A to 6 of 110KV MCline, Transport and erection of 110KV MC/DC towers, stringing of 12 Nos Panther conductor , 1NoGI EW fromKaruppur 230/110 KVSS to karuppur110KVSS
2019_EB_150052_1
TP1-085/2019-20
Open Tender
Civil Works
Works
120 days
Karuppur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2.5 L
Yes
19 Feb 2020
2 Dec 2019
31 Dec 2019
2 Dec 2019
30 Dec 2019
2 Dec 2019
Amount
Clearing of scrub jungle including all cost of labour, lead, lift etc complete.
Conducting check survey,pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour, lead lift etc complete.
Earthwork excavation in hard stiff clay, black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil inlcuding all cost of lead lift etc complete.
Earthwork excavation in soft disintegrated rock or kankar not requiring blasting.
Earthwork excavation in MR and DMR not requiring blasting.
Earthwork excavtion in hard rock measured in solid including blasting etc.,complete
Removing hard rock by wedging, chissellingand trimming to proper shape where blasting is prohibited
Transporting and fixing of stub and cleat with template to site and assembling at site and shifting the template from loc to loc including cost of all materials for stub and cleat and template ,labour, fabrication charges etc complete., for KCR
Transporting and fixing of stub and cleat with template to site and assembling at site and shifting the template from loc to loc including cost of all materials for stub and cleat and template ,labour, fabrication charges etc complete., for QD
Transporting and fixing of stub and cleat with template to site and assembling at site and shifting the template from loc to loc including cost of all materials for stub and cleat and template ,labour, fabrication charges etc complete., for QC
Transporting and fixing of stub and cleat with template to site and assembling at site and shifting the template from loc to loc including cost of all materials for stub and cleat and template ,labour, fabrication charges etc complete., for NMD+18
Transporting and fixing of stub and cleat with template to site and assembling at site and shifting the template from loc to loc including cost of all materials for stub and cleat and template ,labour, fabrication charges etc complete., for NMD+6
Transporting and fixing of stub and cleat with template to site and assembling at site and shifting the template from loc to loc including cost of all materials for stub and cleat and template ,labour, fabrication charges etc complete., for NMC+6
PCC 1:3:6 using 20mm metal for foundation without formwork including cost of all materials lead lift etc complete.
PCC 1:2:4 using 20mm metal for foundation and chimney concrete with formwork including cost of all materials, lead, lift, frustum box, chimney box, etc complete.
RCC 1:1.5:3, using 12 to 20mm HBG metal for foundation , Frustum and chimney concrete with form work including cost of cement all materials labour, lead, lift etc., complete. As directed by the Engineer at site.
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift,labour, cost of binding wire, etc., complete.As directed by the Engineer at site.
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete., for KCR tower
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete., for QD
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete., for QC
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete., for NMD+18
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete., for NMD+6
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete., for NMC+6
Providing pipe type earthing including necessary excavation for fixing 3m long 25mm dia GI "B" class pipe and refilling with excavated earth mixed with soft charcoal and connect the earthstrip with the leg of the stub including all cost of materials, lead, lift etc complete.
Removal of surplus earth in a low lying area to a average distance of 200m by head load.
Dewatering charges during excavation and concreting with 3/5 HP Diesal motor with Pump including hire charges, labour, fuel, oil, transport etc complete
Transport and erection of GI tower angles and HT steel angles including T &P, labour, lead, lift etc complete.as per approved drawing and specification., for Normal tower
Transport and erection of GI tower angles and HT steel angles including T &P, labour, lead, lift etc complete.as per approved drawing and specification., for HT Tower
Labour charges for transporting and hoisting of 7 units of 90 KN insulators with fixing of SS fittings for panther and U bolt including all cost of labour,lead, lift, T & P etc complete. Without PA rod for panther (insulators will be supplied by board)
Labour charges for transporting and hoisting of 8 units of 120 KN insulators and fixing of ST fittings for panther,S.B damper with all allied hardwares including all cost of labour,lead, lift, T & P etc complete (insulators will be supplied by board)
Labour charges for transporting and hoisting of 2x9 units of 120 KN insulators and fixing of DT fittings for panther, S.B damper with all allied hardwares including all cost of labour, lead, lift, T & P etc complete (insulators will be supplied by board)
Labour charges for transport of 12 Nos of Panther conductor from department store, paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete., under Normal Condition
Labour charges for transport of 6 Nos of Panther conductor from department store, paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete., under LC Condition
Labour charges for transport of 12 Nos of Panther conductor from department store, paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete., under LC Condition
Labour charges for transport of 7/3.55mm GI earthwire from Department store and fixing of GI earthwire hardwares (ie ST fittings,SS fittings, D shackle, U bolt etc) wherever required, paving out, jointing, rough sagging, tensioning, including jumber connection transport charges, loading, unloading, lead, lift, cost of T&P, etc complete.,under Normal Condition
Labour charges for transport of 7/3.55mm GI earthwire from Department store and fixing of GI earthwire hardwares (ie ST fittings,SS fittings, D shackle, U bolt etc) wherever required, paving out, jointing, rough sagging, tensioning, including jumber connection transport charges, loading, unloading , lead, lift, cost of T&P, etc complete., Under LC Condition
PCC 1:2:4 using 20mm metal for muffing coping concrete with form work including cost of all materials, labour, lead, lift, etc complete .
Plastering with CM 1:3,12 mm thick for muffing coping concrete including cost of all materials, labour, lead, lift etc complete
Labour charges for fixing of number plates, danger board, phase plate including all cost of materials, abour transport, lead, lift, etc complete
Supply, fabrication and fixing of name board with 18 gauge plate including cost of materials, labour for writing name of the line etc complete
Painting with two coats of anticorrosive paint over tower leg at a height of 45cm including all cost of materials, labour, lead lift etc complete
Providing temporary guys wherever necessary including excavation, buryingout of anchor for staywire, tightening, dismantling the same after completion of works including cost of all materials, lead, lift, labour etc complete.
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour,lead, lift etc complete
Labour charges for removal of Large trees
Labour charges for removal of small trees
Providing full welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials, hire charges for diesel generator and welding transformer, all labour, transport charges etc complete.
Providing trussels for major and minor road crossing including cost of all materials, labour, lead lift etc. Complete.
Releasing, lowering of existing 7 Nos. suspension insulator with SS fittings and rehoisting after completion of new line stringing including all labour, transport lead, lifts, T&P, etc complete.
Releasing and lowering of existing 8 Nos.tension insulator with fittings and Rehoisting after completion of new line stringing including all labour,transport lead, lifts, T&P, etc complete.
Releasing, lowering, coiling and devolution to the GCC central stores of existing 6 Nos.panther conductor from existing tower to newly erected tower including all labour, transport lead, lifts, T&P, etc complete.
Releasing, lowering coiling and devolution to the GCC central stores of Existing 1 No 7/3.55 mm GI earthwire from existing tower to newly erected tower including all labour, transport, lead, lifts, T&P, etc complete.
Providing earthing arrangements for terminal tower, Railway crossing towers including necessary excavation for fixing 3m long 50mm dia GI "B" class pipe, 60cm dia. 5cm thick RCC collar and refilling with excavated earth mixed with soft charcoal and connect the earthstrip with the leg of the stub including all cost of materials, lead, lift etc complete.
Supply, transport and fixing of 12 Nos. PG clamp for panther for providing loop in between existig line during L.C. condition for all the phase including all cost of labour,lead, lift, T & P etc complete if necessary and removal of loop jumper after completion of work as per the instruction of site engineer.
Supply of ST fitting for Panther as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site.
Supply of DT fitting for Panther as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site.
Supply of SB Damber for Panther as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site.
Supply of SS fitting for Panther as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site.
Supply of Aluminium Earth bond
Supply of ST fittings for EW 7/3.55mm as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site.
Supply of Mid span joint for Panther
Supply of Mid span joint for Earth wire
Supply of Repair sleeves
Supply of Number Plate
Supply of Phase Plate (set of three)
Supply of Danger Board
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
BVD Power Private Limited
M s Kumaresan and co
ULTRAPOWER BUILDERS
K DHINAKARAN
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.55 MB
BOQ_180589.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .