| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 LAccepted-Finance | L1 | Accepted-Finance Qualified | |
| 2 | L2₹12.5 L+₹89,185.11 (7.67%)Rejected-Finance VILLAGE SIDARKHA PO KUNDASAR DISTT BAHRAICH UTTAR PRADESH | BAHRAICH | UTTAR PRADESH | 271801 | L2 | Rejected-Finance Not Qualified | |
| 3 | L3₹13.2 L+₹1.6 L (13.7%)Rejected-Finance | L3 | Rejected-Finance Not Qualified | |
| 4 | L4₹13.7 L+₹2.1 L (18.3%)Rejected-Finance BAHRAICH | MAHARAJGANJ | UTTAR PRADESH | 273151 | L4 | Rejected-Finance Not Qualified |
Tender Value
₹15.2 L
EMD Value
₹30,400
Closing Date
3 Jun 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
CHITTAURGARH BANDH NIRMAN KHAND BALRAMPUR
Rehabilitation of Sirsiya Inspection House
2023_UPIDC_806768_1
01/EE/2023-24
Open Tender
Civil Works - Others
Item Rate
60 days
SHRAWASTI
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹30,400
Yes
15 Jun 2023
29 May 2023
3 Jun 2023
29 May 2023
3 Jun 2023
29 May 2023
Amount
Renovation work of Inspection House at Sirsiya
Dismantling existing Plaster, including disposal of refuse as directed by the engineer - in-charge within distance of 60M
Dismantling door or window including chukhat with holdfast and including stacking of materials directed by Engineer-in-charge within a distance of 60M
Dismantling R.C.C. Including stacking of dismantled materials as directed by Engineer-in -charge within a distance of 60M
Dismantling C.C.or brick or granolithic floor including stacking of dismantled materials as directed by the Engineer-in-charge within a distance of 60M
R.C.C (1:2:4 ) with 1-cement,2-Coarse sand and 4-Crushed stone grit (4.75-20 mm.) excluding cost of centering & shuttering and steel reinforcement but including cost of all material, labour and T&P etc. required for proper completion of work.
Centering & shuttering for R.C.C. Work in building work
M.S. Tor Steel Reinforcement in R.C.C.Slab @1.5%
12 mm thick cement plaster in 1:4 C.M. with coarse sand including cost of all material, labour, T & P etc. complete in all respect
P.C.C. (1:3:6) - mechanical mixing in floor with 20 to 40 mm size stone grit and coarse sand including cost of all material, labour, T & P etc. complete in all respect
P/L Vitrified floor tile in different size with water absorption less then 0.08% and conforming tp IS:1562 of approved make in all colours and shade laid on 20mm thick cement mortar 1:4 jointing with grey cement slurry @ 3.3kg/sqm including grouting the joint with white cement and matching pigments etc complete.(size of tile-600X600mm
Finishing wall with water proofing cement paint of approved make such as super snowcem, durroocem, robeicem, guttucem, supercem quality and of required shade on new wall surface (two coats) over one coat of white cement primer to give an even shade after thoroughly brushing the surface to remove powdered materials including curing and cost of all material, labour, T & P etc. complete in all respect.
Distempering two coats of oil bound distemper of approved make of Burger, Jenson & Nicholcsen, Shalimar, Asian, Nerolac over one priming coat of cement primer on new wall surface after thoroughly brushing the surface free from mortar dropping and other foreign matter and also including preparing the surface even with plaster of paris/whiting and sand papered smooth including cost of all material, labour, T & P etc. complete in all respect.
Sprit polishing on new wooden surface including sand papered and cleaning the surface proper and then applying the spirit polish color with shining finishing including supply of all material, labour and T&P required for proper completion of the work.
Internal Water Supply & sanitary Installation Detail Estimate Attached With This Complete Estimate
Internal Electric Installation Detail Estimate Attached With This Complete Estimate
Septic tank of appropriate Capacity for 2 year Cleaning.
Earth work in recoupment and strengthening with lead upto 240 M. and Lift upto 1.5 M. with manual compaction and dressing to profile required for propper completion of work. (Rate / M³)
Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows fixing with butt hinges of required size with necessary screws, excluding panelling which will be paid for separately, all complete as per direction of Engineer-in-charge. (Note:- Butt hinges and necessary screws shall be paid separately) Second class teak wood(35 mm thick shutters )
M/S PAVAN KUMAR SINGH
RAMRAJ MISHRA CONTRACTOR
M/s Vikram Jaiswal
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .