Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance NO 9 2 VANNANTHITTU THEROOR P O KANYAKUMARI DIST PIN 629704 | THEROOR | KANYAKUMARI | TAMIL NADU | 629704 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹4,820
Closing Date
28 Apr 2023, 2:00 pmClosed
Executive Engineer/Distn/ Nagercoil
Office of the Executive Engineer TANGEDCO / Distribution /Nagercoil
Works contract for execution of shifting of Kalaivanar SS, 40 KVA Distribution Transformer in 11 KV Dennison Feeder, as per the request of The Commissioner, Corporation, Nagercoil, 2. DCW estimate for shifting of Kalaivanar SS-I, 500 KVA Distribut
2023_EB_302259_1
EE/D/NGL/ETW- 003 /23-24/D.608-2 /23 dt11.04.23
Open Tender
Electrical Works
Works
90 days
NAGERCOIL
As specified in tender
3 documents required · 3 mandatory
₹0
₹4,820
Yes
5 May 2023
14 Apr 2023
29 Apr 2023
14 Apr 2023
28 Apr 2023
15 Apr 2023
14 Apr 2023 - 28 Apr 2023
For pole Pit Escavation upto 8.00m length by using JCB/Manual
For pole Pit Escavation above 8.00m length by using JCB/Manual
Excavation of Stay pit of 4.5 ' to 5 ' depth using JCB / Manual
Erection of RCC, REC, PSC poles upto 8.00m length by using Crane / Manual
Erection of RCC, REC, PSC poles above 8.00m length by using Crane / Manual
Dismantling of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc.
Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc.
Loading or unloading of REC, RCC, PSC pole upto 8.00 m length
Loading or unloading of All REC, RCC pole above 8.00 m length
Transporting all types of Poles upto 2 KM
Transporting of 42' twin RSJ Pole from roadside to pole pit.
Fabrication of 42' twin RSJ Pole, Material supplied by Board.
Excavation and Erection of 42' twin fabricated RSJ Pole.
Dismantling of all types of Pole upto 8 mtr
Dismantling of all types of Pole above 8 mtr
Dismantling V Cross Arm 4.5 feet
Fixing V cross arm 4.5 feet / Tapping channel
Dismantling of LT S phase cross arm
Fixing of LT S phase cross arm
Dismantling of LT 3 phase cross arm
Fixing of LT 3 phase cross arm
Fixing of HT / LT Ti fitting
Dismantling of HT / LT Ti fitting
Dismantling of HT Pin Insulator 11 KV/33 KV
Fixing of HT PIN insulator with Pin 11 kv/33 KV
Fixing of LT PIN insulator
Fixing of Alu Knob
Dismantling of shackle
Fixing of shackle
Dismantling of 11 KV strain Disc
Fixing of 11 KV strain Disc
Fixing of Two Tapping cross arm per cut point upto 33 KV line including fixing of Discs, Insulatores and Jumpering etc.,
Dismantling of conductors of 7/3.35 mm or other equivalent conductor
Paving and stringing of conductors of 7/3.35 mm or other equivalent conductor
Dismantling of conductors of 7/2.59 mm or other equivalent conductor
Paving and stringing of conductors of 7/2.59 mm or other equivalent conductor
Dismantling of conductors of 7/4.09 mm or other equivalent conductor
Paving and stringing of conductors of 7/4.09 mm or other equivalent conductor
Releasing and reerection ( resagging ) of one run of all sizes of conductor
Dismantling of Distribution Transformer structure complete as per TNEB standard etc.. Dismantling of poles type to be unit HT / LT LAS and jumpering 3 Nos Earth pits with earth trough except reerection of Distribution Transformer.
Erection of Distribution Transformer structure complete as per TNEB standard including painting, feeders arrangrment, colour washing of RCC poles etc.. Fixing of poles type to be unit HT / LT LAS and jumpering 3 Nos Earth pits with earth trough except erection of Distribution Transformer.
Dismantling of Plinth concrete
Plinth construction (Material and Labour)
Loading or Unloading of DT upto 100 KVA
Loading or Unloading of DT 100KVA to 500 KVA
Erection of Distribution Transformer (Above 25 KVA to 100 KVA).
Dismantling of Distribution Transformer (Above 25 KVA to 100 KVA).
Erection of Distribution Transformer (Above 500 KVA).
Dismantling of Distribution Transformer (Above 500 KVA).
Pole earthing
Dismantling Guarding split neutral
Guarding split neutral
Dismantling and redoing Single phase service connection
Dismantling and redoing Three phase service connection
Alternation of clamps
Concreting of Pole with 1:4:8 mix using 40 mm Jelly including curing (Material and labour)
Loading / Unloading of line materials
Drilling/Less than 23 mm holes per hole/slatted holes.
Tree clearance in HT or LT location for ordinary treeclerance and Throng bushes & trees.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .