Loading…
Loading…
Tender Value
Refer Docs
Closing Date
27 Aug 2026, 11:30 am2d left
Single Packet
Normal Tender
No
Itemwise/Consigneewise
Lowest to Highest
TPI Agency
Not Applicable
Expenditure
General
05
1 condition
NA
16 conditions
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
TPI at firm's work
GREEN TRANSPORT POLICY:- I) SUPPLIERS SHALL NOT ENGAGE TRUCKS/ VEHICLES OF MORE THAN 15 YEARS OLD FOR TRANSPORT OF GOODS TO RCF. II) ALL VEHICLES ENTERING INTO FACTORY PREMISES SHOULD CARRY VALID PUC (POLLUTION UNDER CONTROL) CERTIFICATE AND VALID INSURANCE POLICY. III) VEHICLES MAY UNDERGO SURPRISE CHECK BY RCF FOR GENERAL CONDITIONS SUCH AS TYRES PRESSURE, TANKS etc. AND REPORT SUBMITTED TO CONCERNED CMMs. IV) SUPPLIERS SHOULD ENSURE SPEED CONTROLLERS ARE INSTALLED IN ALL NEW HEAVY VEHICLES. V) RTA NORMS SHOULD BE STRICTLY MAINTAINED FOR DRIVER'S COMPETENCE.
Quantity Splitting: as per clause No.2.17.2 of RCF bid document ver. 14 or latest with all corrigendum and amendments if any issued before opening of tender.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Liquidated damages: railway will recover from the contractor as agreed liquidated damages and not by way of penalty, a sum equivalent to 0.5% (half percent)of the price of any stores (including elements of taxes, duties, freight etc.)which the contractor has failed to deliver within the period fixed for delivery in the contract or as extended for each week or part of a week during which the delivery of such stores may be in arrears where delivery thereof is accepted after expiry of the aforesaid period, subject to a maximum of 10% of value of delayed supplies and the same will not be waived off except in cases where delay is on account of RCF. note:(this is applicable for tenders opened after 31 mar 2019.)
1 location across Punjab · 33 Set total
SET OF SS DUCT FOR 3 PHASE DMC BHEL,
05261563A~RCF
05261563A
Limited - Indigenous
Goods
Punjab
₹0
Exempted
21 Aug 2026
21 Aug 2026
1 item · 33 Set total
SET OF SS DUCT FOR 3 PHASE DMC BHEL, as per Drawing: MP22DUCTDMCBH VERSION 1 [ Warranty Period: 30 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| SHELL DEPOT, RCF | Punjab | 33.00 Set |
| Total | 33 Set | |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
5861064.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].