| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.6 CrAccepted-AOC R O DALIPORA KANDIZAL PAMPORE PULWAMA KASHMIR 192121 | PULWAMA | JAMMU AND KASHMIR | 192121 | ₹13.6 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹15.4 Cr+₹1.8 Cr (13.2%)Rejected-Finance R O ARNAS TEHSIL DISTT REASI | REASI | JAMMU AND KASHMIR | 182301 | ₹15.4 Cr+₹1.8 Cr (13.2%) | L2 | Rejected-Finance REJECTED |
| 3 | Rejected-Technical | - | - | Rejected-Technical NON RESPONSIVE BIDDER |
| 4 | Rejected-Technical | - | - | Rejected-Technical NON RESPONSIVE BIDDER |
| 5 | Rejected-Technical | - | - | Rejected-Technical NON RESPONSIVE BIDDER |
Tender Value
₹23.2 Cr
EMD Value
₹46.4 L
Closing Date
9 Sept 2025, 5:00 pmClosed
Chief Engineer PMGSY (JKRRDA) Jammu
Office of The Chief Engineer PMGSY(JKRRDA) Jammu at 1st Floor, Mechanical Engineering Department (MED) Complex University Road Jammu
Construction and Maintenance of Road from L028-Guzzer Pull to Banipora (Link Road), Package No. JK17-4005, PMGSY-IV, Batch-I of 2025-26, Block-Inderwal, District Kishtwar.(Using Waste Plastic) Length-9.700 Kms
2025_JKRRD_143926_1
JK174005
Open Tender
Civil Works - Roads
Percentage
600 days
Inderwal
Please refer Tender documents.
8 documents required · 8 mandatory
₹20,000
₹46.4 L
Office of The Chief Engineer PMGSY (JKRRDA) Jammu
29 Jan 2026
11 Aug 2025
11 Sept 2025
11 Aug 2025
9 Sept 2025
14 Aug 2025
13 Aug 2025 - 14 Aug 2025
13 Aug 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in Hilly Areas in Soil, Ordinary Rock (not requiring blasting), and Hard Rock (requiring blasting) by mechanical means, including cutting and trimming of side slopes and disposal of excavated material with a lift up to 1.5 m and and lead as directed for safe disposal of un-serviceable/surplus excavated material without damaging private/public property As per Technical specification clause 1603.1. and 1603.2 | 3,48,828.49 | Cum | 0.2 | ₹69,765.7 |
| 2 | Earthwork in excavation for structures in all kinds of soil, Ordinary Rock and
hard rock as per drawings and Technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposing of surplus, un-serviceable Excavated earth as directed at site for safe disposal of same without damaging private/public property, dressing of sides, bottom and backfilling in trenches with excavated suitable material including de watering if required. | 5,672.86 | Cum | 605.45 | ₹34,34,633.09 |
| 3 | Providing and laying of plain cement concrete of Grade M-10 in open foundations complete as per drawings and Technical specifications. Clause 802, 803, 1202 & 1203. including all leads, lifts and carriages of materials by MT complete. | 382.12 | Cum | 5,837.52 | ₹22,30,633.14 |
| 4 | Providing and laying of plain cement concrete of Grade M-15 in open foundation complete as per drawings & Technical specification Clauses 802, 804, 805, 806, 807, 1202 & 1204. Including cost of curing, form work, all leads and lifts and carriages of materials by MT complete. | 137.43 | Cum | 5,995.44 | ₹8,23,953.32 |
| 5 | Providing and laying of plain cement concrete of Grade M-15 in substructure complete as per drawings & Technical specification Clauses 802, 804, 805, 806, 807, 1202 & 1204. Including cost of curing, form work, all leads and lifts and carriages of materials by MT complete. | 712.27 | Cum | 6,395.78 | ₹45,55,522.22 |
| 6 | Providing and laying of plain Cement concrete of Grade M-20 in open foundation complete as per drawings & Technical specification Clauses 802, 804, 805,806, 807, 1202 & 1204. Including cost of curing , form work , all leads and lifts and carriages of materials by MT complete. | 45.84 | Cum | 6,608.82 | ₹3,02,948.31 |
| 7 | Providing and laying of plain Cement concrete of Grade M-20 in Sub-Structure complete as per drawings & Technical specification Clauses 802, 804, 805,806, 807, 1202 & 1204. Including cost of curing , form work , all leads and lifts and carriages of materials by MT complete. | 33.75 | Cum | 7,050.5 | ₹2,37,954.38 |
| 8 | Providing and laying reinforced cement concrete NP3 pipes 1000mm dia conforming to IS 458:2003 for culverts material in single row including fixing collar with cement motar 1:2 (1 cement : 2 sand) excluding excavation, protection works, back filling cement concrete and masonry work in head walls parapets clause 1106 but including all leads, lifts, carriages of materials by MT, handling, re-handling complete. | 217.5 | RMT | 7,330.8 | ₹15,94,449 |
| 9 | Polygonal/Random Rubble Masonry laid dry uncoursed brought to course in sub structure including cost of bond/through stones, including all leads, lifts, carriages,of materials by MT handling and re-handling complete | 1,769.62 | Cum | 3,266.71 | ₹57,80,835.35 |
| 10 | Polygonal/Random Rubble Masonry uncoursed brought to course in cement mortar 1:6 (I cement :6 fine sand) in sub- structure including leveling up as specified level with M-5 including cost of through/bond stones , including all leads, lifts, carriages of materials by MT handling, and re-handling complete | 3,212.65 | Cum | 5,471.06 | ₹1,75,76,600.91 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 8.29 MB
BOQ_223153.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .