Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.4 LAccepted-AOC BHAGIRATHIPUR DOMKAL MSD | DOMKAL | MURSHIDABAD | WEST BENGAL | 742101 | ₹21.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹21.4 L+₹1,320 (0.06%)Rejected-Finance GARUI PASCHIM PARA KOLKATA 700065 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700065 | ₹21.4 L+₹1,320 (0.06%) | L2 | Rejected-Finance Higher than L1 |
| 3 | L3₹21.4 L+₹1,800 (0.08%)Rejected-Finance ALAMPUR NODAKHALI | ₹21.4 L+₹1,800 (0.08%) | L3 | Rejected-Finance Higher than L1 |
| Sl No | Description | Qty | Unit | S. P. CONSTRUCTION L3 | M/S.S.S.ENTERPRISE L1 | SARKAR ELECTRICAL L2 |
|---|---|---|---|---|---|---|
| 1.00 | PART-A Day to day operation of pumping machinery of the 4 nos fully automatic PLC controlled pouch Form Fill Seal (FFS) machine at the pouch packing unit on daily basis as per instruction of EIC and recording & updating of the stock etc in work site. All the machineries need to be operated as and when required and production of pouches and packing in poly bags (50 pouches in a single bag) to be performed as per requirement of the quantity. All the machines and apparatus need to be cleaned and washed every time before and after use. The machines and apparatus, electrical panel board switches, switch gear etc to be monitored and checked for its proper functioning . Raw materials to be kept properly in good condition
from 01-08-2026 to 31-07-2027 | 12 | Months | 1,58,197 ₹18,98,364 | 1,58,122 ₹18,97,464 Lowest | 1,58,177 ₹18,98,124 |
| 2.00 | PART-B Supervision of Mechanical and electrical installation and pumps, pipe lines including sweeping, cleaning of Plants as required and as per direction of EIC.
01-08-2026 to 31-07-2027 | 12 | Months | 19,923 ₹2,39,076 | 19,848 ₹2,38,176 Lowest | 19,903 ₹2,38,836 |
| 9.00N.B:- 1. Quoted rate should be inclusive of ESI, PF as per latest amendment and also comply with the Notification no.- 06/STAT/12RW/03/2023/LCS, dt. 02/04/2025 of the office the Labour Commissioner, Govt of W.B. & Reference Memo No- PHE/1095/O-5/16 (Pt) Dated- 22-05-2025 of the Deputy Secretary to the Govt. of West Bengal 2. GST exempted related to Article 243G/243W of the Constitution of India and CGST Rate Notification No. 12/2017-Central Tax (Rate) and corresponding WBGST Rate Notification No. 1136-FT, both dated 28.06.2017, as amended from time to time. | ||||||
Tender Value
Refer Docs
EMD Value
₹43,000
Closing Date
12 Jun 2026, 5:00 pmClosed
Executive Engineer SMD PHE Dte
Chetla
Operation, maintenance and guarding pouch packing Plant with allied machineries at Dongaria surface based water supply projects in South 24pgs district under S.24pgs Mechanical Division, PHE Dte.
2026_PHED_1024777_5
WBPHE/EE/SMD/NIeT-02 of 2026-27
Open Tender
Miscellaneous Works
Item Rate
365 days
Dongaria
Please refer Tender documents.
6 documents required · 6 mandatory
₹43,000
24 Jul 2026
27 May 2026
15 Jun 2026
27 May 2026
12 Jun 2026
27 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART-A Day to day operation of pumping machinery of the 4 nos fully automatic PLC controlled pouch Form Fill Seal (FFS) machine at the pouch packing unit on daily basis as per instruction of EIC and recording & updating of the stock etc in work site. All the machineries need to be operated as and when required and production of pouches and packing in poly bags (50 pouches in a single bag) to be performed as per requirement of the quantity. All the machines and apparatus need to be cleaned and washed every time before and after use. The machines and apparatus, electrical panel board switches, switch gear etc to be monitored and checked for its proper functioning . Raw materials to be kept properly in good condition
from 01-08-2026 to 31-07-2027 | - | Months | - | - |
| 2 | PART-B Supervision of Mechanical and electrical installation and pumps, pipe lines including sweeping, cleaning of Plants as required and as per direction of EIC.
01-08-2026 to 31-07-2027 | - | Months | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Tendernotice_2.pdf
PDF • 0.23 MB
Tendernotice_3.pdf
PDF • 0.06 MB
Tendernotice_4.pdf
PDF • 0.23 MB
BOQ_2520261.xls
BOQ • 0.23 MB
Corrigendum2_Date_02_5.pdf
PDF • 0.49 MB
Corrigendum1_Date_02_5.pdf
PDF • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .