Tender Value
₹14.9 L
EMD Value
₹29,784
Closing Date
13 Jul 2026, 11:00 amClosed
AMA
ZILA PANCHAYAT UNNAO
37. HARISHCHANDRAPUR PITHAI KHEDA SAMPARK MARG SE JILA PANCHAYAT KHADANJA TAK KHADANJA KARYA
2026_UPPRD_1167188_1
243/SA.NI.Z.P.UNN/2026-27/37
Open Tender
Civil Works
Percentage
90 days
UNNAO
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
AMA
₹29,784
6 Aug 2026
7 Jul 2026
13 Jul 2026
7 Jul 2026
13 Jul 2026
7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning and grubbing road land including uprooting wild vegatation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm removal of stumps of such trees cut earlier and disposal of unserviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. | 2,082 | M2 | 7.6 | ₹15,823.2 |
| 2 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5. | 1,596.2 | M3 | 159.6 | ₹2,54,753.52 |
| 3 | Laying brick soling layer on prepared sub-grade with brick on edging according to lines, graded and cross section shown on the drawing filling joints with sand and earth, spreading 25 mm thick earth over brick soling, watering and olling as per Technical Specification Clause 412. | 2,290.2 | M2 | 510.3 | ₹11,68,689.06 |
| 4 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5. | 208.2 | M3 | 159.6 | ₹33,228.72 |
| 5 | Construction of Hume Pipe Culvert (NP-3) 350mm | 5 | Rmt | 2,336.4 | ₹11,682 |
| 6 | Supply and Fixing of Sign Board & Miscellanious. | 1 | Nos | 5,000 | ₹5,000 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.17 MB
BOQ_2189115.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].