Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.5 LAdmitted-Finance | ₹42.5 L | L1 | Admitted-Finance |
| 2 | L2₹47.5 LAdmitted-Finance 16 GANGADHAR BABU LANE C R AVENUE KOLKATA 700012 | KOLKATA | KOLKATA | WEST BENGAL | 700012 | ₹47.5 L | L2 | Admitted-Finance |
| 3 | L3₹49.0 LAdmitted-Finance C O T ALI NEAR TRIPURA CASTLE ROAD CLEVE COLONY SHILLONG 793003 MEGHALAYA | EAST KHASI HILLS | MEGHALAYA | 793003 | ₹49.0 L | L3 | Admitted-Finance |
| 4 | L4₹50.0 LAdmitted-Finance | ₹50.0 L | L4 | Admitted-Finance |
| 5 | L5₹50.4 LAdmitted-Finance | ₹50.4 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | HAMZA CONSTRUCTION CO L2 | R K CONSTRUCTION L10 | M/s A L Traders L6 | DWEL ENTERPRISE L5 | S K Construction L7 | SUNITA DEVI L8 | KB Singha and Associates L1 | A K ENTERPRISE L9 | Ms Amrik Singh Bahra L4 | M/S AKC ENTERPRISE L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches n.exc 1.5 Mtr wide and n,exc 1.5 Mtr in depth loose/soft and greating out for underground cable/erection of poles, stays etc complete all as specified and as directted. | 801.9 | CUM | 150 ₹1,20,285 | 800 ₹6,41,520 | 300 ₹2,40,570 | 250 ₹2,00,475 | 200 ₹1,60,380 | 250 ₹2,00,475 | 125 ₹1,00,237.5 | 251 ₹2,01,276.9 | 210 ₹1,68,399 | 200 ₹1,60,380 |
| 2.00 | Excavation in trenches not exceeding 1.5m wide and exceeding 1.5 m in depth for laying of cable/erection of pole and getting out in soft/loose all complete as specified and as directed. | 1 | CUM | 250 ₹250 | 1,000 ₹1,000 | 500 ₹500 | 200 ₹200 | 700 ₹700 | 450 ₹450 | 250 ₹250 | 451 ₹451 | 330 ₹330 | 200 ₹200 |
| 3.00 | M & L for sand filing in treances for providing sand cushion for protection of UG cable complete all as specified and directed. | 240.57 | Cum | 1,200 ₹2,88,684 | 2,500 ₹6,01,425 | 1,400 ₹3,36,798 | 1,000 ₹2,40,570 | 1,500 ₹3,60,855 | 1,200 ₹2,88,684 | 700 ₹1,68,399 | 1,300 ₹3,12,741 | 910 ₹2,18,918.7 | 1,200 ₹2,88,684 |
| 4.00 | Supply and laying bricks common burnt clay sub classs 'B' old size for cable protection complete all as specified and as directted. | 26.28 | Per 1000 | 13,500 ₹3,54,780 | 15,000 ₹3,94,200 | 16,000 ₹4,20,480 | 15,000 ₹3,94,200 | 14,000 ₹3,67,920 | 15,000 ₹3,94,200 | 13,000 ₹3,41,640 | 15,100 ₹3,96,828 | 1,490 ₹39,157.2 | 14,500 ₹3,81,060 |
| 5.00 | S & F Metal Rotary type locks for CRCA Sheet Panels complete all as specified and as directted. | 30 | Each | 300 ₹9,000 | 500 ₹15,000 | 300 ₹9,000 | 230 ₹6,900 | 450 ₹13,500 | 300 ₹9,000 | 200 ₹6,000 | 341 ₹10,230 | 260 ₹7,800 | 250 ₹7,500 |
| 6.00 | Material & labour for cement concrete in foundations, filling and mass concrete PCC as foundation to poles, type D2, 1:4:8 using 40 mm graded stone agregate as foundations to poles complete all as specified and as directted. | 0.5 | Cum | 4,800 ₹2,400 | 8,000 ₹4,000 | 6,500 ₹3,250 | 6,000 ₹3,000 | 5,500 ₹2,750 | 8,000 ₹4,000 | 5,500 ₹2,750 | 8,000 ₹4,000 | 6,540 ₹3,270 | 6,500 ₹3,250 |
| 7.00 | M&L PCC (1:3:6) type C2 using 40mm graded aggregate as in foundation for stay set /Pole/ Panels etc including fair finish even and fir to exposed surfaces without using extra cement complete all as specified and as directed. | 0.5 | Cum | 5,800 ₹2,900 | 8,500 ₹4,250 | 7,500 ₹3,750 | 6,500 ₹3,250 | 5,800 ₹2,900 | 9,000 ₹4,500 | 6,000 ₹3,000 | 9,000 ₹4,500 | 7,020 ₹3,510 | 7,000 ₹3,500 |
| 8.00 | M & L PCC (1:2:4) type B-1 (with using 20 mm graded stone aggregate) as coping of pole/panel including necessary form work as required complete all as specified and as directted. | 0.5 | Cum | 6,500 ₹3,250 | 9,000 ₹4,500 | 8,500 ₹4,250 | 7,000 ₹3,500 | 6,500 ₹3,250 | 9,500 ₹4,750 | 6,500 ₹3,250 | 9,500 ₹4,750 | 9,050 ₹4,525 | 7,600 ₹3,800 |
| 9.00 | Returning, filling in (Soil) including spreading, levelling, watering and well ramming in layers not exc 25CM thick layers complete all as specified and as directed. | 721.71 | CUM | 45 ₹32,476.95 | 300 ₹2,16,513 | 150 ₹1,08,256.5 | 50 ₹36,085.5 | 200 ₹1,44,342 | 100 ₹72,171 | 80 ₹57,736.8 | 100 ₹72,171 | 105 ₹75,779.55 | 50 ₹36,085.5 |
| 10.00 | Removal of excavated material n,exc 50 Mtr away and depositing depositing where directed at a level not exc 1.5 mtr above the starting point complete all as specified and directed. | 80.19 | CUM | 90 ₹7,217.1 | 300 ₹24,057 | 250 ₹20,047.5 | 120 ₹9,622.8 | 220 ₹17,641.8 | 100 ₹8,019 | 100 ₹8,019 | 100 ₹8,019 | 100 ₹8,019 | 125 ₹10,023.75 |
Tender Value
₹39 L
EMD Value
₹78,000
Closing Date
9 May 2026, 6:00 pmClosed
GE SHILLONG
GE SHILLONG SHILLONG PIN 793002
REPAIR/MAINT OF LT OVER HEAD LINES AND LT UG CABLES AND APFC AND 4 POLE AND ALLIED WORKS AT SHILLONG CANTT UNDER GE SHILLONG
2026_MES_760865_1
GE/SHL/TOKEN-15 OF 2026-27
Open Tender
Electrical and Maintenance Works
180 days
GE SHILLONG
ALL AS PER TENDER DOCUMENT
7 documents required · 7 mandatory
₹500
GE SHILLONG
₹78,000
Yes
13 May 2026
18 Apr 2026
11 May 2026
18 Apr 2026
9 May 2026
2 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Excavation in trenches n.exc 1.5 Mtr wide and n,exc 1.5 Mtr in depth loose/soft and greating out for underground cable/erection of poles, stays etc complete all as specified and as directted. | - | CUM | - | - |
| - | Excavation in trenches not exceeding 1.5m wide and exceeding 1.5 m in depth for laying of cable/erection of pole and getting out in soft/loose all complete as specified and as directed. | - | CUM | - | - |
| - | M & L for sand filing in treances for providing sand cushion for protection of UG cable complete all as specified and directed. | - | Cum | - | - |
| - | Supply and laying bricks common burnt clay sub classs 'B' old size for cable protection complete all as specified and as directted. | - | Per 1000 | - | - |
| - | S & F Metal Rotary type locks for CRCA Sheet Panels complete all as specified and as directted. | - | Each | - | - |
| - | Material & labour for cement concrete in foundations, filling and mass concrete PCC as foundation to poles, type D2, 1:4:8 using 40 mm graded stone agregate as foundations to poles complete all as specified and as directted. | - | Cum | - | - |
| - | M&L PCC (1:3:6) type C2 using 40mm graded aggregate as in foundation for stay set /Pole/ Panels etc including fair finish even and fir to exposed surfaces without using extra cement complete all as specified and as directed. | - | Cum | - | - |
| - | M & L PCC (1:2:4) type B-1 (with using 20 mm graded stone aggregate) as coping of pole/panel including necessary form work as required complete all as specified and as directted. | - | Cum | - | - |
| - | Returning, filling in (Soil) including spreading, levelling, watering and well ramming in layers not exc 25CM thick layers complete all as specified and as directed. | - | CUM | - | - |
| - | Removal of excavated material n,exc 50 Mtr away and depositing depositing where directed at a level not exc 1.5 mtr above the starting point complete all as specified and directed. | - | CUM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_852274.xls
BOQ • 0.34 MB
TENDERDOCU15.pdf
Tender Documents • 1.04 MB
Download all tender documents and submit your bid