| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 CrAccepted-AOC NO 1 1 ANNA STREET ETHIRAJ NAGAR WEST MAMBALAM METTUPALAYAM CHENNAI 600 033 | CHENNAI | TAMIL NADU | 600033 | ₹1.2 Cr | 1 | Accepted-AOC Tender accepted |
| 2 | Rejected-Technical | - | - | Rejected-Technical Rejected in prequalification |
Tender Value
₹1.2 Cr
EMD Value
₹68,000
Closing Date
28 Mar 2024, 11:00 amClosed
Superintending Engineer, Chennai circle 2
Superintending Engineer Chennai circle 2 Nandanam Chennai
Manufacture Erection and Commissioning of Pit Puzzle Car Parking system Pit 2 Level plus Stilt 2 Levels for the Construction of Multistoried Commercial or Office and Residential flats 1B plus S plus 8 Floors in T.S.No. 26 Part of Urur Chennai.
2024_TNHB_448604_1
SE/CC-II/30/2023-24
Open Tender
Civil Works - Others
Item Rate
60 days
Besant Nagar
Pls refer documents
10 documents required · 10 mandatory
₹0
₹68,000
7 Aug 2024
14 Mar 2024
28 Mar 2024
14 Mar 2024
28 Mar 2024
14 Mar 2024
Amount
Design, Manufacture, Erection and Commissioning of Pit Puzzle Car Parking system (Pit 2 Level +Stilt 2 Levels) as per the architectural drawing. Automated puzzle car parking system is facilitated to accommodate 26 cars and the system is fully independent parking system operated and controlled by a Programmable Logic Control system with estimated shortest retrieval time of 180 seconds with proper security measures all complete complying with relevant standard specifications and as Units directed by the departmental officers.
Specification 1. Type of Parking - Pit puzzle Parking (2 Levels in Pit and 2 Levels in Stilt) 2. Types of Car Parked - SUV 3. Mode of Construction - Structural Construction 4. Area of Construction (Length × Breadth) - Area-1 : 9920 mm x 6200 mm Area-3: 7040 mm x 5420 mm 5. Total Height of Structure (Incl. pit depth) - 8400 mm 6. Number of Units - 4 Units (4 Units SUV) & 3 Units (3 Units SUV) 7. Number of cars - 26 cars 8. Ground Level Height beam bottom - 3900 mm 9. Pit Depth - 4500 mm 10. Car Bay Size - Length = 5.5 m, Width= 2.50 m, Height=2.00 m 11. Mode of Storing the cars - On Pallet 12. Mode of operation - Electrical 13. Loading capacity per Parking Bay - Max. 2750 Kg 14. Speed Details - Lifting: Up to 20 m/min, Sliding: Up to 15 m/min 15. Motor Speed (RPM) - 1440 RPM 16. Mode of Interface - HMI Interface 17. Loading Time in Min - 1 to 3 min 18. Unloading time in Min - 1 to 3 min 19. Type of Sensors Used - Human intervention sensor 20. Car Loading & Retrieval Control - Fully automatic through PLC 21. Operation of Loading and Retrieval Through HMI 22. Car Parking Building - Steel structure of carbon steel ISMB as per IS2062
Mechanical 23. Lifting Speed Control - Geared Motor with AC Brake 24. Lifting Speed (m/min) - Up to 20 m/min 25. Lifting Speed Control - Geared Motor with AC Brake 26. Sliding Speed (m/min) - Up to 15 m/min 27. Type of construction of Steel Wire Rope - Dia 16 mm. FMC Wire, 6 × 36 construction.
Automation 29.1 System sultability-ABB/Siemens/Mitsubishi/Snider/any standard/Make PLC is used for this Project. The automation system will be suitable (for acquiring data / information from various systems / sub systems and process them to execute the functions required whenever necessary 29.2 Safety of Automation Equipment - The level of automation will satisfy the requirements of the promised specification for the car parking system like human interface, tracking of car, choice of least time for parking and retrieval. Entry of Unauthorized Personare restricted by Providing Suitable Barricade, Emergency Push Button is provided near all lifts to stop the entire operation during Emergency. 29.3 PLC CPU - CPU of ABB / Siemens/ Mitsubishi/Snider / any standard Make Model no Simatic 1513, Higher end, with adequate capacity with additional memory space is considered for future requirement. 29.4 Control Panel - Rittal make Control panels are used for PLC and Remote I0 Panels. 29.5 Layout and Cabling - To suit Layout as per the requirement 29.6 Panel Earthing - Client Scope 29.7 Lighting and Ventilation - Client Scope
Quality 30.1 Quality in Raw Material - Quality control procedure is prepared and adopted while receiving raw materials from suppliers. 30.2 Quality in Production - Each and every products manufactured are undergoing inspection by a qualified inspector and based on the report, product will be delivered for erection. 30.3 Quality in Erection - Inspection is carried out during erection stage by stage and only after confirmation next stage of erection is followed.
Civil Foundation 31.1 Type of foundation - Will be designed according to the soil report given by the client 31.2 Foundation Design - Will be incorporated as per layout requirement 31.3 Design Load Calculation for Foundation - Will be given for the finalized design, to decide the foundation type. 31.4 Scope of work for civil foundation - The scope is on the client side.
Cladding 32.1 Type of cladding - Will be designed by client as per layout requirement. Car parking vendor shall provide basic provision on their structure to fix the Cladding on their structure
Fire Fighting Equipment 33.1 Design of System - We shall provide the adequate design for firefighting as per standards and provide layout for the same. 33. 2 Scope of installation of fire fighting is on clent scope.
Painting 34.1 Scope - Painting is applicable to all structural items, mechanical, car platforms, etc. Under the bureau of Indian standards. 34.2 Painting - Painting will be applied to all carbon steel surfaces exposed to the atmospheric action after surface preparation. 34.3 Surface Preparation - Coating performance is in general, proportional to degree of surface preparation. The surface preparation will be such as to clean the surface thoroughly, that is removal of all extraneous materials from the raw surface to receive the paint directly. All surfaces will be cleaned of loose substances such as dust, mill scale, oil, welding slag etc. Then the surfaces will be prepared to the required quality level by further processing to permit rigid anchoring of the prime coat. 34.4 Levels of Painting and finish - One coat of primer and two coats of final painting will be applied. Metallic for Structures and MRF/ Any standard make for Equipment is used for this Project. 34.5 Method of Painting - Manual by painting brush / spray painting.
Sub Total
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .