Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 00 KANOONGOPURA NORTH MAHILA DISTRICT HOSPITAL BAHRAICH BAHRAICH UTTAR PRADESH 271801 | BAHRAICH | UTTAR PRADESH | 271801 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Rejected-Technical | Rejected-Technical NOT QUALIFY |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
16 Dec 2020, 12:00 pmClosed
SE, EUDC-I, NOIDA
33/11 KV SUBSTATION, SECTOR-18 FIRST FLOOR, OPPOSITE SAB MALL, NOIDA
MAINTENANCE AND OTHER RELATED WORK OF POWER TRANSFORMER UNDER EUDD V NOIDA
2020_PVVNL_536103_1
51/EUDC-I/2020-21/NOIDA (WORKS)
Open Tender
Electrical Works
Item Rate
IN AREA OF SDO-3, 8 AND 9, NOIDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
EE, EUDD-V, NOIDA
₹2,000
17 Dec 2020
7 Dec 2020
16 Dec 2020
7 Dec 2020
16 Dec 2020
7 Dec 2020
Amount
MAINTENANCE AND OTHER RELATED WORK OF 04 NOS. POWER TRANFORMER INSTALLED AT VARIOUS 33/11 KV SUB-STATION ON TIME TO TIME FOR THE PERIOD OF 03 MONTHS UNDER EUDD-V, NOIDA AS PER FOLLOWING :- Note :- The material LV, HV side bushing rods, bushing, all gasket packing set, M.S. strips of T/F shall be provided by the contractor.
Opening of jumpering clamps from HV side of Power T/F.
Chosing of value of conservation Tank.
Drain out of T.F oil from T/F to drum.
Opening of section windows with help of nuts and bolts etc.
Opening HV side bushing with the help of nuts bolts and washers etc.
Opening LV side bushing with the help of nuts bolts and washers etc.
Opening and refixing of HV side bushing Rod after remove carbon by amri clothes & filling and damaged rods replacement by new bushing rods in connecting rods properly with the help of Gas welding and charging of all Oil packing of HV side bushing rods properly.
Opening and refixing of LV side bushing Rod after remove carbon by amri clothes & filling and damaged rods replacement by new bushing rods in connecting rods properly with the help of Gas welding and charging of all Oil packing of LV side bushing rods properly.
Fixing of HV side bushing in flangs with help of nuts bolts and washers after changing all oil packing properly.
Fixing of LV side bushing in flangs with help of nuts bolts and washers after changing all oil packing properly.
Closing of section windows with help of nuts bolts and washers after changing all oil packing properly.
Filling of T/F Oil from Drum to T/F.
Opening of value conservation Tank properly.
Tigtening of all nuts botls & washers of Top T/F Properly for smooth & proper working.
Tightening of all nuts bolts & washers of Radiators.
Fixing of Jumpering clamps for HV side & LV side of T/Fs.
Replacment of damaged M.S. earthing strip as per site requirement, material provided by the contractor at his own cost.
M/s Shakti Enterprises
M/s Fineco Engineering Works
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .