Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 202 1ST FLOOR VIVEKANAND PURI MALKAGANJ SARAI ROHILLA NORTH DELHI DELHI 110007 UDYAM DL 01 0065084 | NORTH DELHI | DELHI | 110007 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance 638 GROUND FLOOR WEST GURU ANGAD NAGAR LAXMI NAGAR LAXMI NAGAR EAST DELHI DELHI 110092 UDYAM DL 02 0031392 | EAST DELHI | DELHI | 110092 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
26 Jun 2021, 1:00 pmClosed
EXECUTIVE ENGINEER (SDW)-I
EXECUTIVE ENGINEER (SDW)-I KILOKRI SPS JAL VIHAR LAJPAT NAGAR NEW DELHI - 110 024
Improvement of Foundation and allied trenches of 30 MGD pump sets at Kilokri New SPS. (Re-invited).
2021_DJB_204528_3
NIT NO- 04 (2021 - 2022)/SDW-I
Open Tender
Miscellaneous Works
Item Wise
30 days
EXECUTIVE ENGINEER (SDW)-I
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
EMD A/c No. 50448339804 at Allahabad Bank,
Exempted
1 Jul 2021
17 Jun 2021
26 Jun 2021
17 Jun 2021
26 Jun 2021
17 Jun 2021
Improvement of foundations & allied trenches 30 MGD of pump set No. 7,8 & 9 MGD by carrying out the following jobs:- Disconnecting the HT connections & dismantling of pump and motor from the foundation after the cutting the nuts and bolts with gas cutter and with the help of EOT crane and manual labour.
Closing of suction and delivery valves with MS blank flange rubber packing and nuts bolts.
Dismantling of base & stands after cutting of jammed/damaged foundation bolt with gas cutter and EOT crane.
Cutting of holes in the RCC foundation with pneumatic hammer for fixing new foundation bolts of required size.
Providing of heavy-duty foundation bolt nut & washer of size 300mm length & standard existing dia.
Grouting of foundation bolts in existing foundation including the RCC work to carry out the proper grouting of bolts & job also i/c the repairing of foundation.
Repairing of trenches with CC & plastering work all around the 30 MGD pump sets with proper leveling & covering with existing MS chequred sheets etc.
Fixing of MS base frame with proper leveling including RCC work as required.
Fixing of pump sets on base frame, alignment of pump with motor, electric connection of motor cables including providing and fixing MS nuts & bolts on suction delivery line with rubber packing.
Testing and Commissioning of Pump set after making HT connections opening of all valves & testing the pump sets on full load.
RUDRA ALLIANCE
HYDROCON ENGINEERS
SAI TRADING CORPORATION
MITTAL TRADING COMPANY
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .