Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.6 CrAccepted-AOC | ₹5.6 Cr | 1 | Accepted-AOC 1 |
| 2 | 2₹6.1 Cr+₹57.1 L (10.3%)Rejected-AOC | ₹6.1 Cr+₹57.1 L (10.3%) | 2 | Rejected-AOC 2 |
Tender Value
₹7.0 Cr
EMD Value
₹13.9 L
Closing Date
17 Jan 2024, 4:30 pmClosed
SE
IRRIGATION WORK CIRCLE, 9 SAPRU RAOD, CIVIL LIE, PRAYAGRAJ
Anti erosion work from Daraganj Tiraha to Shastri Bridge in 600m length with 2 No. Box culvert (3x2 m) and interlocking road at the right bank of river Ganga for Mahakumbh 2025.
2024_UPIDC_877833_12
14/SE/2023-24
Open Tender
Civil Works
Item Wise
150 days
Mela Area
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹13.9 L
15 Feb 2024
12 Jan 2024
17 Jan 2024
12 Jan 2024
17 Jan 2024
12 Jan 2024
Amount
Boring 600mm dia and upto 15.0 M. depth for constructing RCC piles, in average type of strata containing sand, medium dry clay mixed with kanker or chhurry or both, with auger machine, providing side support with Bentonite slurry or casing pipe, complete in all respect, as per direction of Engineer-in- charge, including all lead, lift and delift, with cost of all materials, taxes, royalty, carriage, labour and T&P charges required for proper completion of the work.
Earth work in cutting and excavation of foundation, launching apron etc in all type of soil with all leads and lifts and proper disposal/back filling and compaction of excavated earth as per direction of Engineer-incharge including cost of all labour and T&P charges required for proper completion of the work.
Earth work in filling for widening of approach road with good earth from approved barrow area including all leads, lifts and mechanical compaction, labour and T.&P. etc. requierd for proper completion of work as per direction of Engineer in charge.
Supplying and Laying of Local Sand as per direction of Engineer-in-charge including cost of all labour T&P etc charges required for proper completion of the work.
Supplying and laying 200 micron thick LDPE film complete in all respect, as per direction of Engineer-incharge, including cost of all materials, taxes, carriage, labour and T&P charges required for proper completion of the work.
providing shutterig work for C.C works including cost of all materials, labour, T&P, etc required for proper completon of work as per specification.
Providing centering and shuttering for R.C.C works complete in all respect including cost of all labour and T&P charges required for proper completion of the work.
Cutting, bending, binding and placing in position of steel reinforcement TMT Fe 500( I.S.: 1786-2008) including cost of reinforcement steel and binding wire, in piles, beams, slabs, stairs etc. for proper completion of the work as per specification.
Laying Cement .Concrete 1 : 3 : 6 grade M-10 in foundation with cement, coarse sand (F.M>2.00) and graded Shankargarh stone ballast 20 mm to 40 mm size with mechanical mixing, compaction, including cost of all materials, labour , T & P, taxes and octroi etc, required for proper completion of work. as per specification.
Laying Cement .Concrete 1:2:4 grade M-15 in foundation with cement, coarse sand (F.M>2.00) and graded stone ballast 4.5 mm to 20 mm size with mechanical mixing, compaction, including cost of all materials, labour , T & P, taxes and octroi etc, required for proper completion of work. as per specification.
Reinforced Cement Concrete (R.C.C.) grade M-25 (Design Mix) with cement (O.P.C. GRADE 43 I.S. 8112 -1989 ), coarse sand (F.M. more than 2.0) and graded stone grit 4.25 to 20 mm size using suitable weight batch mixture admixture with proper curing, including cost of all material labour and T&P etc. required for proper completion of the work.
Supplying and Laying 4.75mm to 20 mm size Grit in filter in specification thickness including cost of all materials, labour, T& P etc. required for proper completion of work.
Supplying and laying 20 to 40 mm size shankargarh stone ballast in inverted filter including cost of all materials, labour , T & P, taxes etc, required for proper completion of work as per specification.
Making and laying G.I. wire crate of size 2.50 m.×1.50 m.×1.00 m made of double knotted net mesh size 200mmx200mm of 8 SWG G.I. wire and closely packed with hammer dressed Stone Boulder 25-50 kg as per IS 116-2018 Including cost of all materials, lead,lift, delift, labour and T&P etc. all complete.
R.R. Stone masonry with Shankargarh stone boulder, in 1:3 CM with cement and coarse sand (F.M more than 2.0), complete in all respect, as per direction of Engineer-in- charge, including all lead, lift and delift, with cost of all materials, taxes, royalty, carriage, labour, proper curing and T&P charges required for proper completion of the work.
Brick Work in 1:4 CM with cement and coarse sand (F.M > 2.0) including cost of all materials, labour , T & P and taxes etc. required for proper completion of work. as per direction of Engineer- incharge.
12mm thick Cement Plaster in 1:4 CM with cement and coarse sand (FM > 2.0) including cost of all materials, labour , T & P and taxes etc. required for proper completion of work as per specification.
Finishing walls with water proofing cement paint of approved make such as super snocem, durocem, super cem quality of required shade on new wall surface (two coat) over one coat of white cement primer to give an even shade after thorough brushing the surface to remove powerderd materials including curing , cost of all materials, labour , T & P e t c , required for proper completion of work.
Supplying and laying Geo-textile sheet below stone mattress and gabions made of type-1 nonwoven needle punched or thermally bounded geo-textile (Harsh installation condition) multifilament polypropylene yarn confirming IRC SP 116-2018.
Placing of granular sub-base (GSB) in diversion obtained from dismentling of old existing road spreading in uniform layers with motor grader o prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibrator wheel roller to achieve the desired density.
Supplying and laying 250 mm thick pre mix Wet Mix Macadam (WMM) G-1 placed and compacted in two layer over GSB with 53 mm to 75 mircon size stone ballast and carriage of wet mix from plant including cost of all materials, labour ,T & P,taxes etc. required for proper completion of work as per specification.
Supply and laying Category A 80 mm thick zig zag - shaped mechanically compressed inter locking concrete paver blocks in cement grey/Yellow/Red colour with M40 Compressive strength over 30 mm sand including cost of all material, labour T&P etc, required for proper completion of work as for IRC: SP: 63-2018.
Running 5 HP diesel pumps for dewatering, including suction and delivery pipe, with cost of labour including operator and POL etc complete in all respect, as per direction of Engineer-in- charge, including all lead, lift and delift, with carriage and other T&P charges required for proper completion of the work.
M/S ALAKNANDA ASSOCIATES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .