| 1 | L1₹3.5 CrAdmitted-Finance MADHUBAN PO PARADIP DIST JAGATSINGHPUR 754 142 ODISHA | JAGATSINGHAPUR | ODISHA | 754142 | ₹3.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.8 Cr+₹24.5 L (6.90%)Admitted-Finance 806 8TH FLOOR MULUND WEST NEPTUNE UPTOWN N S ROAD VILLAGE TOWN MULUND CITY MUMBAI MUMBAI MAHARASHTRA 400080 INDIA | MUMBAI SUBURBAN | MAHARASHTRA | 400080 | ₹3.8 Cr+₹24.5 L (6.90%) | L2 | Admitted-Finance |
| 3 | L3₹3.9 Cr+₹32.3 L (9.12%)Admitted-Finance | ₹3.9 Cr+₹32.3 L (9.12%) | L3 | Admitted-Finance |
| 4 | L4₹4.0 Cr+₹45.9 L (13.0%)Admitted-Finance | ₹4.0 Cr+₹45.9 L (13.0%) | L4 | Admitted-Finance |
| 5 | L5₹4.0 Cr+₹48.5 L (13.7%)Admitted-Finance | ₹4.0 Cr+₹48.5 L (13.7%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | INDRIYA CONSTRUCTION COMPANY L13 | Encee Rail Engineers and Fabricators Pvt Ltd L2 | NNS CONSTRUCTIONS AND ENGINEERING PRIVATE LIMITED L9 | SANJAY KUMAR UPADHYAY L8 | Ms Gangadhar Jena L7 | PADMABATI INFRAPROJECTS PVT. LTD. L12 | BEHERA ENGINEERING WORKS PRIVATE LIMITED L11 | M/s. P N Construction L4 | M/S BHAIRAB CHARAN SWAIN L5 | Kulamani Nayak L6 | M/S TRIBHUBAN DAS L1 | M/S.Parikshita Chuli and Sons L3 | Utkarsh Infra and Projects L10 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in all kinds of soil with initial lead & lift with dressing, leveling & compacting the foundation bed, breaking the clods to maximum 5cm to 7cm, disposing the material at a designated place and keeping the required quantities for back filling with cost of labour, T&P, tollage,transportation, loading at one end & unloading at other end, all taxes, excluding GST all complete as per the direction of Engineer-in-charge. | 360 | Each Cum | 404 ₹1,45,440 | 110 ₹39,600 | 120 ₹43,200 | 210 ₹75,600 | 180 ₹64,800 | 275 ₹99,000 | 140 ₹50,400 | 250 ₹90,000 | 20 ₹7,200 Lowest | 215.52 ₹77,587.2 | 100 ₹36,000 | 100 ₹36,000 | 150 ₹54,000 |
| 2.00 | P.C.C(1:3:6) of using 40mm. & down C.B.G chips of approved quality in foundation & plinth including mixing hosting, laying to proper level & slope compacting, curing, watering charges etc. complete including cost & supply of all materials, labour, T&P, taxes, etc. complete but excluding cost of GST as directed by Engineer-in-charge | 9.27 | Each Cum | 6,472 ₹59,995.44 | 4,500 ₹41,715 | 5,030 ₹46,628.1 | 4,105 ₹38,053.35 | 4,500 ₹41,715 | 6,800 ₹63,036 | 5,500 ₹50,985 | 5,056 ₹46,869.12 | 3,600 ₹33,372 Lowest | 5,056.25 ₹46,871.44 | 4,000 ₹37,080 | 4,918 ₹45,589.86 | 5,300 ₹49,131 |
| 3.00 | Cement concrete (1:1.5:3) using 12mm to 20mm size C.B.G. chips for all floors, foundation & plinth etc. of approved quality mixing, hoisting, laying, compacting, curing with cost and supply of all materials, labour, T&P, taxes, tollage, royalties, etc. all complete but excluding GST as directed by Engineer-in-charge. | 73 | Each Cum | 7,281 ₹5,31,513 | 5,500 ₹4,01,500 | 5,700 ₹4,16,100 | 5,639 ₹4,11,647 | 5,000 ₹3,65,000 Lowest | 7,200 ₹5,25,600 | 6,500 ₹4,74,500 | 6,946 ₹5,07,058 | 5,500 ₹4,01,500 | 6,946.43 ₹5,07,089.39 | 6,500 ₹4,74,500 | 6,989 ₹5,10,197 | 7,200 ₹5,25,600 |
| 4.00 | Supply Tor/TMT steel manufactured by SAIL/TISCON/VIZAG Steel of Fe 500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in position for RCC works including binding the grills with binding wire of 18 to 20 gauge including cost of steel, all labour,materials, transportation charges, T&P, taxes, etc. all complete but excluding GST as per the direction of Engineer-in-charge.
NB: No payment shall be made for extra weight than theoretical co-efficient. | 87.6 | Each Qntl | 8,967 ₹7,85,509.2 | 8,000 ₹7,00,800 | 6,500 ₹5,69,400 | 6,141 ₹5,37,951.6 Lowest | 7,200 ₹6,30,720 | 8,800 ₹7,70,880 | 7,100 ₹6,21,960 | 7,564 ₹6,62,606.4 | 6,859.3 ₹6,00,874.68 | 7,564.58 ₹6,62,657.21 | 7,000 ₹6,13,200 | 9,000 ₹7,88,400 | 7,900 ₹6,92,040 |
| 5.00Providing rigid smooth leak proof centering & shuttering made of steel/ply, plank of approved quality for R.C.C. structures and deshuttering and removing the same after due period with supply of all materials, labour, T&P, taxes, royalties, tollage, etc. all complete but excluding GST as directed by Engineer-in -charge. | ||||||||||||||||
| 5.10 | F&P | 26 | Each Sqm | 629 ₹16,354 | 100 ₹2,600 | 180 ₹4,680 | 98 ₹2,548 Lowest | 110 ₹2,860 | 600 ₹15,600 | 320 ₹8,320 | 1,200 ₹31,200 | 220 ₹5,720 | 114.9 ₹2,987.4 | 200 ₹5,200 | 200 ₹5,200 | 650 ₹16,900 |
| 5.20 | RCC Wall | 160 | Each Sqm | 764 ₹1,22,240 | 300 ₹48,000 | 380 ₹60,800 | 650 ₹1,04,000 | 500 ₹80,000 | 600 ₹96,000 | 380 ₹60,800 | 1,000 ₹1,60,000 | 240 ₹38,400 Lowest | 933.74 ₹1,49,398.4 | 250 ₹40,000 | 300 ₹48,000 | 850 ₹1,36,000 |
| 5.30 | RCC Roof | 49 | Each Sqm | 719 ₹35,231 | 300 ₹14,700 | 450 ₹22,050 | 422 ₹20,678 | 350 ₹17,150 | 600 ₹29,400 | 415 ₹20,335 | 1,500 ₹73,500 | 220 ₹10,780 Lowest | 520.26 ₹25,492.74 | 225 ₹11,025 | 350 ₹17,150 | 650 ₹31,850 |
| 6.00 | Engagement of 5HP Diesel Pump sets and placing those pumps at required locations inside prohibited area for dewatering of stagnated water by pumping including fuel and consumable, providing required length of suction and delivery pipes with supply of all labour, T&P, engagement, hire & running charges of Pump, transportation charges, tollage, Operator cost, Port entry fee with barricading the same area if required etc. including all taxes excluding G.S.T all complete as directed by Engineer-in-charge. (No idle charges will be paid. Pumps will be engaged as and when required). | 160 | Each Hour | 1,860 ₹2,97,600 | 50 ₹8,000 | 150 ₹24,000 | 50 ₹8,000 | 30 ₹4,800 Lowest | 350 ₹56,000 | 50 ₹8,000 | 150 ₹24,000 | 50 ₹8,000 | 58 ₹9,280 | 300 ₹48,000 | 50 ₹8,000 | 500 ₹80,000 |
| 7.00 | Supplying of 75mm dia pvc pipe transporting, cutting, placing, proper fixing of pvc pipe with cost & expenses of all materials, tools and plants, machineries, taxes, tollages, VAT, Port entry fees etc all complete as per direction of Engineer in charge. | 14 | Each Mtr | 145 ₹2,030 Lowest | 350 ₹4,900 | 400 ₹5,600 | 185.85 ₹2,601.9 | 180 ₹2,520 | 600 ₹8,400 | 220 ₹3,080 | 1,000 ₹14,000 | 400 ₹5,600 | 9,954.73 ₹1,39,366.22 | 200 ₹2,800 | 170 ₹2,380 | 450 ₹6,300 |
Tender Value
₹5.6 Cr
EMD Value
₹11.2 L
Closing Date
21 Jul 2023, 5:15 pmClosed
Binayak Pradhan,EE,HWDII,PPA
Binayak Pradhan,EE,HWDII,PPA
Development of Plot near CD area adjacent to ATBK-2 inside Harbour area at Paradip Port.
2023_MoS_759863_1
CE/ HW-II-W-10/23/149
Open Tender
Civil Works
Works
180 days
Paradip
Refer Tender Document and e-TCN
5 documents required · 5 mandatory
₹5,000
Yes
As per Tender Document and e-TCN
₹11.2 L
Yes
12 Sept 2023
30 Jun 2023
24 Jul 2023
30 Jun 2023
21 Jul 2023
30 Jun 2023
Amount
Earth work in excavation in all kinds of soil with initial lead & lift with dressing, leveling & compacting the foundation bed, breaking the clods to maximum 5cm to 7cm, disposing the material at a designated place and keeping the required quantities for back filling with cost of labour, T&P, tollage,transportation, loading at one end & unloading at other end, all taxes, excluding GST all complete as per the direction of Engineer-in-charge.
P.C.C(1:3:6) of using 40mm. & down C.B.G chips of approved quality in foundation & plinth including mixing hosting, laying to proper level & slope compacting, curing, watering charges etc. complete including cost & supply of all materials, labour, T&P, taxes, etc. complete but excluding cost of GST as directed by Engineer-in-charge
Cement concrete (1:1.5:3) using 12mm to 20mm size C.B.G. chips for all floors, foundation & plinth etc. of approved quality mixing, hoisting, laying, compacting, curing with cost and supply of all materials, labour, T&P, taxes, tollage, royalties, etc. all complete but excluding GST as directed by Engineer-in-charge.
Supply Tor/TMT steel manufactured by SAIL/TISCON/VIZAG Steel of Fe 500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in position for RCC works including binding the grills with binding wire of 18 to 20 gauge including cost of steel, all labour,materials, transportation charges, T&P, taxes, etc. all complete but excluding GST as per the direction of Engineer-in-charge. NB: No payment shall be made for extra weight than theoretical co-efficient.
Providing rigid smooth leak proof centering & shuttering made of steel/ply, plank of approved quality for R.C.C. structures and deshuttering and removing the same after due period with supply of all materials, labour, T&P, taxes, royalties, tollage, etc. all complete but excluding GST as directed by Engineer-in -charge.
RCC Wall
RCC Roof
Engagement of 5HP Diesel Pump sets and placing those pumps at required locations inside prohibited area for dewatering of stagnated water by pumping including fuel and consumable, providing required length of suction and delivery pipes with supply of all labour, T&P, engagement, hire & running charges of Pump, transportation charges, tollage, Operator cost, Port entry fee with barricading the same area if required etc. including all taxes excluding G.S.T all complete as directed by Engineer-in-charge. (No idle charges will be paid. Pumps will be engaged as and when required).
Supplying of 75mm dia pvc pipe transporting, cutting, placing, proper fixing of pvc pipe with cost & expenses of all materials, tools and plants, machineries, taxes, tollages, VAT, Port entry fees etc all complete as per direction of Engineer in charge.
Filling the low laying area with saline sand or dredged spoil as per required level in layer wise ,each layer not exceed 1mtr. with a lead of 8 km,watering ,compacting with VRR to achive OMC etc all complete including Supply of all material , labour , T&P, hire and running charge of Equipments , taxes ,tollage etc all complete but excluding GST. as directed by EIC. NB: 10.00% voids will be deducted from actual measurement at site to achieve the payable quantity.
Providing & laying quarry dust of approved as sub-base in layers watering and compacting to the required density in O.M.C with Vibratory Roller with supply of all material labour transportation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC
Providing, laying, spreading and compacting stone aggregates of IRC Gr-I(90 mm to 45 mm ) size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite and to fill up the interstices with Quarry dust , watering and compacting to the required density as per clause 404 of MORTH specification for Road & Bridge works with supply of all material labour transporation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC .
Providing, laying, spreading and compacting stone aggregates of IRC Gr-II(53 mm to 22.4 mm ) size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite and to fill up the interstices with Quarry dust , watering and compacting to the required density as per clause 404 of MORTH specification for Road & Bridge works with supply of all material labour transportation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC .
Providing & laying of moorum of approved as surface course, watering and compacting with PRR, lifting from stack with supply of all material, labour , T&P, hire and running charge of Equipments, transporatation, taxes ,tollage etc all complete but excluding GST.as directed by EIC.
Encee Rail Engineers and Fabricators Pvt Ltd
M/S.Parikshita Chuli and Sons
M/s. P N Construction
M/S BHAIRAB CHARAN SWAIN
Kulamani Nayak
Ms Gangadhar Jena
SANJAY KUMAR UPADHYAY
NNS CONSTRUCTIONS AND ENGINEERING PRIVATE LIMITED
Utkarsh Infra and Projects
BEHERA ENGINEERING WORKS PRIVATE LIMITED
PADMABATI INFRAPROJECTS PVT. LTD.
INDRIYA CONSTRUCTION COMPANY
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_798834.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .