Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC SHOP NO 10 BMC SHOPPING CENTRE MITHA NAGAR GOREGAON WEST MUMBAI 400 104 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400104 | ₹1.0 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹1.1 Cr+₹1.9 L (1.85%)Rejected-Finance 1 14 SUJAL MANSION B BLOCK BHANGWADI KALBADEVI ROAD MUMBAI 400 002 | MUMBAI | MAHARASHTRA | 400002 | ₹1.1 Cr+₹1.9 L (1.85%) | L2 | Rejected-Finance Other Than Being Lowest |
| 3 | L3₹1.1 Cr+₹2.2 L (2.11%)Rejected-Finance 1101 A WING SACHDEV COMPLEX JANGAL MANGAL RAOD BHANDUP W MUMBAI 400078 | MUMBAI SUBURBAN | MAHARASHTRA | 400078 | ₹1.1 Cr+₹2.2 L (2.11%) | L3 | Rejected-Finance Other Than Being Lowest |
| 4 | L4₹1.1 Cr+₹2.2 L (2.12%)Rejected-Finance 1 2 GR FLOOR VITHALKUNJ NO 3 V P ROAD ANDHERI WEST MUMBAI 400 058 | MUMBAI SUBURBAN | MAHARASHTRA | 400058 | ₹1.1 Cr+₹2.2 L (2.12%) | L4 | Rejected-Finance Other Than Being Lowest |
| 5 | L5₹1.1 Cr+₹2.6 L (2.50%)Rejected-Finance | ₹1.1 Cr+₹2.6 L (2.50%) | L5 | Rejected-Finance Other Than Being Lowest |
| Sl No | Description | Qty | Unit | Shree Ayyappa Engineering L1 | Pioneer Enterprises L6 | DARSHAN CONSTRUCTION Co. L8 | Chakshu Enterprise L2 | Darpan Construction L4 | BRITE INDUSTRIES L5 | sapana enterprises L3 | pk Enterprises L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Repair/Routine maintenance including operation of Central Air conditioner plant (Make: DAIKIN) to entire hospital, maintained 24 hrs for desired temperature of 25°C ±2°C & humidity of 55 ±5% without interruption including repairing/replacement of damaged/unserviceable valves, chiller pipe, condenser pipe, cooling towers, insulation of chilled water pipeline, greasing, gland filling, gasket replacement, changing bearing of pump/motors, nut bolts tightening or replacement of motor & pumps complete all as specified & directed. | |||||||||||
| 1.01 | Chilled pump set of 100 HP motor capacity – 04 Nos. | 11 | Per Month | 7,300 ₹80,300 | 7,000 ₹77,000 | 7,000 ₹77,000 | 6,896 ₹75,856 | 7,200 ₹79,200 | 6,885 ₹75,735 | 6,876 ₹75,636 Lowest | 8,000 ₹88,000 |
| 1.02 | Condenser pump motor set of 60 HP capacity – 04 Nos | 11 | Per Month | 5,760 ₹63,360 | 7,000 ₹77,000 | 6,000 ₹66,000 | 5,426 ₹59,686 | 9,800 ₹1,07,800 | 5,415 ₹59,565 | 5,406 ₹59,466 Lowest | 9,000 ₹99,000 |
| 2.00 | Comprehensive maintenance & operation of water softening plant installed at Central AC plant to ensure soft water supply for condenser pumps, including repair/replacement of MCCB/MCB, cable connections, sand, charcoal etc., testing after maintenance complete all up to satisfaction of Engineer-in-Charge. | 11 | Per Month | 26,215 ₹2,88,365 | 25,519 ₹2,80,709 | 24,531 ₹2,69,841 | 24,536 ₹2,69,896 | 32,000 ₹3,52,000 | 24,525 ₹2,69,775 | 24,516 ₹2,69,676 Lowest | 26,000 ₹2,86,000 |
| 3.00 | Comprehensive maintenance including repair /routine maintenance of Automatic tube cleaning system incl replacement of damaged part like electronic, electric parts, HMI cum PLC,equipment motor, connected parts, motor repairs & connected parts and all incl day to day maintenance complete all as specified and directed by Engineer in charge | 11 | Per Month | 10,475 ₹1,15,225 | 10,000 ₹1,10,000 | 9,831 ₹1,08,141 | 9,752 ₹1,07,272 Lowest | 10,000 ₹1,10,000 | 9,765 ₹1,07,415 | 9,784 ₹1,07,624 | 10,000 ₹1,10,000 |
| 4.00 | Comprehensive maintenance including repair /routine maintenance of DAIKIN make Chiller No. 01 Model No. PFS4302DBRY,Sl No 0000110 of capacity 400 TR screw type double compressor incl replacement of damaged part like electronic, electric parts, HMI,equipment motor, connected parts, compressor repairs incl rewinding & connected parts and all incl day to day maintenance and all parts of chiller units excluding compressor oil and filters complete all as specified and as directed. | 11 | Per Month | 84,900 ₹9,33,900 | 79,387 ₹8,73,257 | 72,000 ₹7,92,000 Lowest | 82,500 ₹9,07,500 | 89,000 ₹9,79,000 | 79,345 ₹8,72,795 | 79,364 ₹8,73,004 | 82,000 ₹9,02,000 |
| 5.00 | Comprehensive maintenance including repair /routine maintenance of DAIKIN make Chiller No. 02 Model No. PFS4302DBRY,Sl No 0000132 of capacity 400 TR screw type double compressor replacement of damaged part like electronic, electric parts, equipment motor, HMI cum PLC, connected parts, compressor repairs incl rewinding & connected parts and all incl day to day maintenance and all parts of chiller units excluding compressor oil and filters complete all as specified and as directed. | 11 | Per month | 84,900 ₹9,33,900 | 79,387 ₹8,73,257 | 72,000 ₹7,92,000 Lowest | 82,500 ₹9,07,500 | 82,000 ₹9,02,000 | 79,345 ₹8,72,795 | 79,364 ₹8,73,004 | 82,000 ₹9,02,000 |
| 6.00 | Comprehensive maintenance including repair /routine maintenance of DAIKIN make Chiller No. 03 Model No. PFS4302DBRY,Sl No 0000131 of capacity 400 TR screw type double compressor incl rewinding replacement of damaged part like electronic, electric parts,HMI, equipment motor, connected parts, compressor repairs & connected parts and all incl day to day maintenance and all parts of chiller units excluding compressor oil and filters complete all as specified and as directed. | 11 | Per month | 84,900 ₹9,33,900 | 79,387 ₹8,73,257 | 72,000 ₹7,92,000 Lowest | 82,500 ₹9,07,500 | 85,000 ₹9,35,000 | 79,407 ₹8,73,477 | 79,408 ₹8,73,488 | 82,000 ₹9,02,000 |
| 7.00 | Comprehensive maintenance including repair /routine maintenance of DAIKIN make Chiller No. 04 Model No. PFS 430B, of capacity 400 TR screw type double compressor incl replacement of damaged part like electronic, electric parts, equipment motor, HMI, connected parts, compressor repairs incl rewinding & connected parts and all incl day to day maintenance and all parts of chiller units excluding compressor oil and filters complete all as specified and as directed. | 11 | Per month | 84,900 ₹9,33,900 | 79,416 ₹8,73,576 | 72,000 ₹7,92,000 Lowest | 82,500 ₹9,07,500 | 85,000 ₹9,35,000 | 79,407 ₹8,73,477 | 79,408 ₹8,73,488 | 82,000 ₹9,02,000 |
| 8.00 | Material and labour for repairs/overhauling /servicing to existing starter panel of cooling towers, chiller motor, condenser motor and chillers in LT panel indoor type installed at central AC plant by taking shutdown from appropriate authority including checking loose connections and tightening the same and cleaning inside/outside all connection, replacing all cable glands, thimbles and lugs as per the size of exisitng cable , applying petroleum jelly on the contactors, providing new insulation tape to bars, repair to broken/hanging doors by fixing hinges or welding the door to make it serviceable, spray painting as required, repair/replacement of exhaust fans of the panel, RYB Indicators, on off push buttons etc and testing the entire panel after servicing completion to satisfaction of Engineer in charge | 8 | Each Job | 5,240 ₹41,920 | 6,000 ₹48,000 | 4,929 ₹39,432 | 4,948 ₹39,584 | 9,800 ₹78,400 | 4,927 ₹39,416 Lowest | 4,928 ₹39,424 | 5,000 ₹40,000 |
Tender Value
₹1.1 Cr
EMD Value
₹1.8 L
Closing Date
18 Dec 2025, 6:00 pmClosed
CWE (NW) Mumbai
CWE (NW) Mumbai
REPAIR MAINTENANCE OF CHILLED WATER PIPE LINES AND MISC CONNECTED VALVES OF CENTRAL AC PLANT, COOLING TOWER, M O AND REPAIRS MAINTENANCE OF CENTRAL AC PLANT AT INHS ASVINI UNDER AGE (I) ASVINI, COLABA, MUMBAI
2025_MES_740842_1
8097/CWE(NW)Mumbai/E8
Open Tender
Civil Works
Item Rate
330 days
AGE (I) ASVINI
Class B
Category c(i)
7 documents required · 7 mandatory
₹1,000
AGE (I) ASVINI
₹1.8 L
Yes
16 Feb 2026
21 Nov 2025
20 Dec 2025
21 Nov 2025
18 Dec 2025
13 Dec 2025
21 Nov 2025 - 11 Dec 2025
Amount
Repair/Routine maintenance including operation of Central Air conditioner plant (Make: DAIKIN) to entire hospital, maintained 24 hrs for desired temperature of 25°C ±2°C & humidity of 55 ±5% without interruption including repairing/replacement of damaged/unserviceable valves, chiller pipe, condenser pipe, cooling towers, insulation of chilled water pipeline, greasing, gland filling, gasket replacement, changing bearing of pump/motors, nut bolts tightening or replacement of motor & pumps complete all as specified & directed.
Chilled pump set of 100 HP motor capacity – 04 Nos.
Condenser pump motor set of 60 HP capacity – 04 Nos
Comprehensive maintenance & operation of water softening plant installed at Central AC plant to ensure soft water supply for condenser pumps, including repair/replacement of MCCB/MCB, cable connections, sand, charcoal etc., testing after maintenance complete all up to satisfaction of Engineer-in-Charge.
Comprehensive maintenance including repair /routine maintenance of Automatic tube cleaning system incl replacement of damaged part like electronic, electric parts, HMI cum PLC,equipment motor, connected parts, motor repairs & connected parts and all incl day to day maintenance complete all as specified and directed by Engineer in charge
Comprehensive maintenance including repair /routine maintenance of DAIKIN make Chiller No. 01 Model No. PFS4302DBRY,Sl No 0000110 of capacity 400 TR screw type double compressor incl replacement of damaged part like electronic, electric parts, HMI,equipment motor, connected parts, compressor repairs incl rewinding & connected parts and all incl day to day maintenance and all parts of chiller units excluding compressor oil and filters complete all as specified and as directed.
Comprehensive maintenance including repair /routine maintenance of DAIKIN make Chiller No. 02 Model No. PFS4302DBRY,Sl No 0000132 of capacity 400 TR screw type double compressor replacement of damaged part like electronic, electric parts, equipment motor, HMI cum PLC, connected parts, compressor repairs incl rewinding & connected parts and all incl day to day maintenance and all parts of chiller units excluding compressor oil and filters complete all as specified and as directed.
Comprehensive maintenance including repair /routine maintenance of DAIKIN make Chiller No. 03 Model No. PFS4302DBRY,Sl No 0000131 of capacity 400 TR screw type double compressor incl rewinding replacement of damaged part like electronic, electric parts,HMI, equipment motor, connected parts, compressor repairs & connected parts and all incl day to day maintenance and all parts of chiller units excluding compressor oil and filters complete all as specified and as directed.
Comprehensive maintenance including repair /routine maintenance of DAIKIN make Chiller No. 04 Model No. PFS 430B, of capacity 400 TR screw type double compressor incl replacement of damaged part like electronic, electric parts, equipment motor, HMI, connected parts, compressor repairs incl rewinding & connected parts and all incl day to day maintenance and all parts of chiller units excluding compressor oil and filters complete all as specified and as directed.
Material and labour for repairs/overhauling /servicing to existing starter panel of cooling towers, chiller motor, condenser motor and chillers in LT panel indoor type installed at central AC plant by taking shutdown from appropriate authority including checking loose connections and tightening the same and cleaning inside/outside all connection, replacing all cable glands, thimbles and lugs as per the size of exisitng cable , applying petroleum jelly on the contactors, providing new insulation tape to bars, repair to broken/hanging doors by fixing hinges or welding the door to make it serviceable, spray painting as required, repair/replacement of exhaust fans of the panel, RYB Indicators, on off push buttons etc and testing the entire panel after servicing completion to satisfaction of Engineer in charge
Descaling of condenser shell and tube by using chemical and nylon brush ,Taking out complete impurities by circulating chemical solution and replace unsv gasket complete and testing (with nitrogen gas)after completion of work complete all as specified and directed
Descaling of evaporator or chiller shell and tube by using chemical and nylon brush ,Taking out complete impurities by circulating chemical solution and replace unsv gasket complete and testing with nitrogen gas after completion of work, fixing nitrile rubber insulation on the damaged area complete all as specified and directed
Taking down old unsv insulation, cleaning the surface with steel brush remove dirt/dust and make it free of mill scale , greases and foreign matter.M&L for nitrile rubber insulation class o aluminium cover over the pipe/duct surafce and sealing the joints using weather proof black tape complete all as specified.
S&F wire netting of galvanised steel wire 24 guage fixed with tinned tacks of wire staples mesh size 12mm aparture over entire duct insulation with 50mm overlap for preventing rat bitescomplete all as specified.
Taking down old rectangular square duct including insulation, wire net & all connected accessories and making good disturbed surfaces as per existing complete all as specified & directed by Engr-in-charge.
Supply and errect factory fabricated Rectangular/ square Duct made out of 24 gauge GI sheet in L shaped hollow profile including all accessories such as corner, carriage bolt hangers, gasket and seal the longitudinal joints with and including approved sealant complete all as specified and directed by Engineer-in-Charge.
Supply and fix in repair Sensor (Chilled water/Condensor water/ oil temp / bearing temp) complete all as specified and directed. Make: Daikin, Model Name- PFS4302DBRY for chiller of 400 TR.
Supply and Charging of Gas R 134a complete all as specified and directed
M&L for rewinding of electric motor of the following capacity, 3phase 50hz, 415V with super enamelled copper winding wire of suitable guage including dismantling, assembling after rewinding to its original location of capacity 100 Horse power complete all as specified and directed.
M&L for rewinding of electric motor of the following capacity, 3phase 50hz, 415V with super enamelled copper winding wire of suitable guage including dismantling, assembling after rewinding to its original location of capacity 60 Horse power complete all as specified and directed.
All as per Srl Item No. 18.00 here in before but 20 HP
All as per Srl Item No. 18.00 here in before but 15 HP
Taking down old unsrv insulation over the chiller pipe line, cleaning water pipe surface with steel brush remove dirt/dust, M&L for chilled pipe line insulation by applying a coat of zinc chromite primer & apply a two coats of cold setting adhesive compound (CRPX) on pipes for sticking the insulation bonded mineral wool of density 144 Kg/cum, 50mm thikness tightly pressed on the pipe upto 250mm dia seal all the joint with adhesive compound wrap the insulation surface by using one layer of polythene sheet 50mm wide PVC tape cover the entire with chicken mesh finish the surface, of density 144 Kg/Cum and cover 26 gauge alluminium GI cladding of approved colour & cover with Glasswool complete all as directed.
Supply & fill compressor lubricating oil for chillers, Alkyl Benzene bases with ISO viscosity grade 86.
Supply & fix in repairs filter drier 5/8" MFL suitable for filteration of R-134A gas suitable for Daikin make chiller.
Supply & fix in repair retainer for collecting the oil from the chiller in recirculation line of Daikin make chiller.
S & F in repairs filter core multilayered filtration medium 3/8" suitable for R-134A Gas suitable for Daikin make Chiller.
S & F in repairs filteration kit CI body suitable for 4-1/2" flare connection both sides.
S & F in repairs filter (low side and oil reclaim) suitable for Daikin Chiller Alkene benzene based compressor oil with suitable flare connection on both ends.
M & L for complete recovery of existing gas using recovery pump from the chiller unit, supply & charging Nitrogen gas at 150 PSI G pressure for testing the chiller for 24 hrs, vaccumising the gas upto 500 micron and again fill R-134A gas to required level complete all as per instructions and directions of Engineer-in-charge. Note: (a)Extra R-134A gas will be measured and paid seperately. (b) Contractor shall be arrange for R-134A empty gas cyllinders, Recovery pump, Nitrogen gas cylinder and all other Materials as per site requirement. The work shall be carried out in the presence of OEM Engineer.
Supply, Fixing, testing and commissioning of heavy duty electric cable after disconnecting exsting condenser motor cable and laying pvc insulated copper conductor of size 25 sqmm single core, 1100 volt grade, FRLS type laid in trenches, fixed on wall, passing through pipes, ducts,flexible covers with proper saddles complete including connecting with MCCB/ busbar and motor terminals on other end with the help of proper size lugs, glands, properly as directed by engineer-in-charge.
Taking down old paint over the iron Brackets /Iron Cantilever Beams / Rail sections of cooling tower base,Pipelines, pump motors , motor base, cooling towers etc by cleaning the surface with steel brush remove dirt/dust, M&L for applying a coat of zinc chromite primer & apply a two coats of black synthetic enamel paint around the body incl every joints, corners complete all as specified & as directed by Engr-in-charge.
Taking down old unsrv diffuser grills & supply and fix new supply line aluminium rectangular air diffusers complete with wooden frame work made out of II nd class hard wood, volume control damper including gasket and connected accessories complete all as directed by Engineer-in-Charge.
Taking down GI/AI or any other false ceiling and refixing the same after completion of work all as specified & as directed by Engr-in-charge.
Taking out old unservicable Advance cooling towe ABS nozzles and Supply and fixing of new cooling tower nozzles as per the existing complete all as specified and directed.
Material and labour for complete servicing of cooling tower including cleaning of clogged nozzels, removing any plants from the cooling tower body, cleaning of louvers with steel brush, cleaning of cooling tower base with chemical and drying it complete all as specified and directed by Engineer in charge
Taking down old unsv CI butter fly valve and supply and fixing of new CI Butter fly valve (ISI marked) slim seal design with nitrile rubber lined seat with clutch lever (p10) as per IS 13095 of size 250mm complete all as specified and directed.
Ditto_ as per Srl Item No. 35.00 here in before but 150mm.
Taking down old existing MS pipes Supply , lay and welding MS pipes heavy grade with all fittings laid in floors or fixed to walls and ceilings etc. of size 300mm complete all as specified and directed.
Ditto_ as per Srl Item No. 37.00 here in before but 250mm dia.
Ditto_ as per Srl Item No. 37.00 here in before but but 150mm dia.
Ditto_ as per Srl Item No. 37.00 here in before but but 100mm dia.
Ditto_as per Srl Item No. 37.00 here in before but but 65 mm dia.
M & L Steel structural fabrication works fabricated from structural steel sections including nuts, bolts,washers, welding ,bending cold or hot, drilling holes for bolts, in any shape or size as indicated or directed and inclusive of one primary coat, one under coat and one finishing coat of paint complete all as specified and directed.
Supply and fixing in repair of 4-1RM91 PVC Fins 300 nos are made of Virgin rigid PVC fiims, vaccum formed in shape and design of honey comb constn, even distribution of water to achieve maximum heat exchange, larger wetted surface area and high efficiency water to air heat transfer complete all as specified and as directed.
Taking out old unservicable Louvers from Advance cooling towers at the site and Supply and fixing of new louvers of same size, quality for cooling tower as per the existing at the site complete all as specified and directed.
Dismantling/Taking down old trays and Supply & Installation of Hot Dip Galvanised GI Cable tray 300mm with collar height of 16 SWG thickness with Cover suitable for laying refrigerant pipes and Power & control cables, including support clamps, rods, bolts, nuts, washers, fastners etc complete all as specified and as directed by Enginner-in-Charge.
Taking down old unsrv MCCB of 160A size and S & F of MCCB 3P, 415 V, Adjustable type 160 Amps including making suitable fixing arrangement with all connected accessories on existing LT panel complete all as specified and as directed.
Taking down old unsrv MCCB of 100Amps and S & F of MCCB 3P/4P as per site requirement, 415 V, Adjustable type 100 Amps including making suitable fixing arrangement with all connected accessories on existing LT panel complete all as specified and as directed.
Taking down old unsrv MCCB of capacity 63 Amps and S & F of MCCB 3P, 415 V, adjustable type 63Amps including making suitable fixing arrangement with all connected accessories on existing LT panel complete all as specified and directed.
Taking down old unsrv insulation over the cooling tower pipe line, cleaning water pipe surface with steel brush remove dirt/dust, M&L for pipe line insulation by applying of FRP insulation product on the pipeline, sticking the Cloth by mixing of Star bond material in the form of pad with the density 24 Kg/Cum be fixed tightly to the surface complete all as specified and as directed.
Taking down old unsrv Fan hub assembly & supply, installation, testing of chrome steel fan hub assembly with appropriate size suitable for cooling tower & fixed it with suitable nut, bolts & washers with its complete accessories all as specified & as directed.
Taking down old unsrv Fan hub assembly iron base channel and supply, fixing, testing of iron base channel for mounting of cooling tower fan hub assembly with appropriate size with suitable nut, bolts & washers with its complete accessories all as specified & as directed by Engr-in-charge.
Supply, fixing and testing for Cooling tower Fan belt as per the existing size complete all as specified and directed.
Supply and Fix Pressure gauge dial 0-10 kgs rating suitable for chiller pipelines including siphons complete all as specified and directed
Supply and fix temperature indicator fixed to incoming and outgoing pipelines of chiller with coloured liquid inside for measurement of water temperature
Supply and Fix in repairs contactors MNX, 3 pole 140A including necessary lugs complete all as specified and directed.
Supply and Fix in repairs contactors MNX, 3 pole 110A including necessary lugs complete all as specified and directed.
Supply and Fix in repairs contactors MNX, 3 pole 80A including necessary lugs complete all as specified and directed.
Supply and Fix in repairs contactors MNX, 3 pole 50A including necessary lugs complete all as specified and directed.
Supply and Fix in repairs contactors MNX, 3 Pole upto 45Amps including necessary lugs complete all as specified and directed.
Supply and fixing of anti vibration pads made of suitable for supporting the combined weight of pump-motor assembly to absorb the vibrations encountered during operation of chilled motor pump of capacity 100 hp.
M & L for repalcement of GI cladding of chilled water pipeline suitable for chilled water pipeline after sticking 32mm nitrile rubber insulation on the pipeline for chilller motors all as specified and directed by Engineer in charge .
Supply and laying synthetic rubber insulated mats 3mm thick for voltage upto 33kv (size 2m x 1m) for electrical purpose as per IS 15652-2006, (superseding IS 5424) suitable for electrical shock safety
Supply and fixing replacement of wall mounted fan, Heavy duty, steel body AC single phase, 230volts, 50Hz of size 760 mm sweep (30") with blades, frames and louvers including connecting up with three core flexible copper conductor cable for suitable size, complete all as specified and as directed.
M & L for replacement of sponge balls of automatic tube cleaning system installed at Central AC plant.The size of the balls to match with the site requirement and number of balls to be replaced as per requirement complete after completion of its rated cycles.Note : the balls to be replaced in the presence of OEM.
M & L for Earthing complete with galvanised steel earth plate electrode 60 x 60 cm x 6mm thick, buried directly in ground (earth pit not less than 2.25 m deep below ground level) with top edge of the plat not less than 1.5 metres below normal ground level, connected to galvanised iron 25x4 mm strip as earthing lead by means of bolts, nuts, check nuts and washers of galvanised iron or steel all as shown in electrical plate no. 3 connecting to earthing test point all as specified or indicated including testing on completion all as dir by Engg - in - charge.
Supply and fix in replacement 25x4 mm galvanised iron strip earthing complete all as specified and as directed.
M & L in replacement of point wiring with two run of PVC insulated unsheathed single core multi stranded copper conductor 1.5 sqmm (Red and Block colour), 1100 volts grade cable, FRLS, passing through PVC casing caping 25/32mm including accessories and S&F PVC modular metal flush box with modular white cover plate with frame, suitable for mounting modular fittings like switches, switch socket, fan regulator etc as directed by Engineer-in-Charge including one run of PVC insulated unsheathed multistranded copper conductor cable 1.5 sqmm (green colour) FRLS earth wire and connected to earth dolly for one light point controlled by one way switch complete all as specified and as directed.
Taking down unserviceable FTL fittings and supply and fix in replacement of LED lights fitting 1x 20W, (min 120 lumen/watt) 4 feet, 220V, AC decorative box type with driver, holder including LED tube light connecting up with three core flexible copper conductor cable of suitable size from ceiling rose complete with two Nos of PVC box of size 75x75x20mm for mounting light fittings complete all as specified and as directed.
Taking down unserviceable highway LED light and supply and fix in replacement of new highway LED lights luminaire 250 watt (min 110 lumen/watt), 240 V, AC, surface/recessed type with high efficiency complete with driver, holders & LED lamp suitable for roof ceiling including connecting up with driver three core flexible copper conductor cables of suitable size complete all as specified and as directed.
M & L for complete rewiring of centralised control panel for AHUs including rewiring of the defectice cotactors, mcbs/mccb, relays, timer switch, single phase preveneter , RYB indicators, on/off push buttons and painting of outside panel, complete all as specified and as directed by Engineer in charge
S & F incl wiring of RYB indiactors in the main panel/ AHU control panels all as specified and directed by Engr in charge
Chakshu Enterprise (BID ID -3501510)
sapana enterprises (BID ID -3501941)
Darpan Construction (BID ID -3501726)
BRITE INDUSTRIES (BID ID -3501912)
Pioneer Enterprises (BID ID -3501122)
pk Enterprises (BID ID -3502025)
DARSHAN CONSTRUCTION Co. (BID ID -3501505)
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
8097.rar
Tender Documents • 3.31 MB
BOQ_829691.xls
BOQ • 6.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .