Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹5.0 Cr
EMD Value
₹10.1 L
Closing Date
4 Dec 2026, 2:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
ENGG
14 conditions · 2 needing a document upload
Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or V whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Technical Eligibility criteria: (a)The tenderer must have successfully completed or substantially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender. (b) (i) In case of composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note: Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered atleast 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate. Substantially Completed Work means an ongoing work in which payment equal to or more than 90% of the present contract value (excluding the payment made for adjustment of Price variation (PVC), if any) has been made to the contractor in that ongoing contract and no proceedings of termination of contract on Contractor's default has been initiated. The credential certificate in this regard should have been issued not prior to 60 days of date of invitation of present tender.
Defination of Similar Work :- F 1a to 1c: Any Railway track work including track maintenance work.
16 conditions · 5 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tender value is including escalation of (-)15% (minus fifteen percent) on CPWD DSR rates. Tenderer should note this before quoting the rates.
The original Bank Guarantee (in lieu of Bid Security) should be delivered in person to the official nominated (i.e OS/Tenders/Engg/SC Division) as indicated in the tender document before closing date for submission of bids. (i.e. excluding the last date of submission of Bids).
All the instructions furnished in the Technical Compliance / Commercial Compliance / Custom / Undertakings / General lnstructions are only indicative and not exhaustive. The tenderer shall read the GCC / Tender documents for complete details.
The tenderer shall thoroughly go through the entire tender documents and strictly adhere to the instructions and directions given therein.
WD-SC-KZJ & SNF-MLY Sections: SW 1) Proposed safety related track works and miscellaneous track works (Other than safety related track items) from Km: 175.18 to Km: 190.87 and Km: 0.00 to Km: 11.480 on UP & DN lines between WD-SC & SNF-MLY stations in SSE/P.Way/SNF section. SW 2) Proposed safety related track works and miscellaneous track works (Other than safety related track works) from Km: 190.87 to 201.56 and Km: 11.48 to Km: 22.020 on UP & DN lines between SC- MLY & SNF-MLY stations in SSE/P.Way/SC section. SW 3) Proposed safety related track works and miscellaneous track works (Other than safety related track works) from Km: 201.56 to 252.60 on UP & DN lines between CHZ-WP stations in SC-KZJ section in SSE/P.Way/GT section under ADEN/EAST sub division.
169_CR_SC_26_OT~SCR
169_CR_SC_26_OT
Open
Works - General
12 Months
Hyderabad, Telangana
₹0
₹10.1 L
12 Nov 2026
12 Nov 2026
20 Nov 2026
163 items across 5 schedules · ₹5,04,63,284.52 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Girth over 60 cm and up to 1.5m | Each | 40.00 | 836.48 | 33,459.2 |
| 2 | With epoxy concrete grouting. | Kg | 4000.00 | 115.97 | 4,63,880 |
| 3 | Painting the HFL mark and Danger level mark, year of HFL on bridge abutments and piers with ready mixed paint as per standard in two coats over one coat of primer with all materials, labour, tools, scaffolding, all lead and lift etc. including writing complete. | Each | 100.00 | 258.36 | 25,836 |
| 4 | Dewatering of natural or accumulated water from any location. Payment to be done for Horse power of pump multiplied by pumping hours. | HP Hour | 500.00 | 40.58 | 20,290 |
| 5 | For Casual/Scattered Rail Renewal work | RM | 2500.00 | 30.73 | 76,825 |
| 6 | For Casual/Scattered Rail Renewal work | RM | 2500.00 | 32.53 | 81,325 |
| 7 | Locations other than Ballasted Deck Bridge | Each | 1900.00 | 407.84 | 7,74,896 |
| 8 | Ballasted Deck Bridge | Each | 20.00 | 481.59 | 9,631.8 |
| 9 | For 1.00m long fishplates | Joint | 1700.00 | 112.94 | 1,91,998 |
| 10 | Opening and refixing of Joggled fish plates provided to weld joints/rail of any rail section under traffic to enable examination of weld/rail by departmental official nominated by Engineer In charge and lubrication of fishplates by applying departmental Grease graphite grade 'O' (IS:408) to fishing planes and bolts by departmental black oil as per procedure laid down in latest version of IRPWM, including all tools required and as directed by Engineer-in-charge. Note: 1. Grease Graphite, black oil, fish bolts, K.Oil, wire brush, required for work shall be given by department and issued at concerned SSE/PW Stores. 2.Jammed fish bolts shall be cut using chisel and hammer and replaced with new bolt. | Set | 2900.00 | 45.12 | 1,30,848 |
| 11 | Lubrication of Elastic Rail Clips on PSC sleepers as per procedure prescribed in latest edition of IRPWM with Railway's grease. | ERC | 600000.00 | 1.95 | 11,70,000 |
| 12 | Removing seized ERC from SGCI inserts of existing track by using suitable approved chemicals and re-fixing after greasing of insert eye and ERC with Contractor's grease of specified quality as per provisions of IRPWM, as directed by Engineer in-charge. Note: 1.List of Seized ERC along with location shall be prepared after inspection of SSE/P.Way and marked prior to execution of this item. 2. Due care shall be taken to avoid any damage to the sleeper 3.A penalty of 50% of the basic cost of new sleeper in nearest sleeper factory shall be levied on each, if SGCI insert is broken or sleeper gets cracked in the process. | ERC | 1000.00 | 44.66 | 44,660 |
| 13 | By using Railway's Grease graphite | Each | 62000.00 | 26.99 | 16,73,380 |
| 14 | GRSP | Each | 7000.00 | 17.85 | 1,24,950 |
| 15 | ERCs | Each | 8000.00 | 5.96 | 47,680 |
| 16 | Metal/GFN Liners | Each | 10000.00 | 3.97 | 39,700 |
| 17 | Renewal of seized Plate/Rail screws on PSC Sleepers by using gas or any approved methods, duly drilling holes in broken screw and removing existing screw pieces from the holes along with existing dowels and fixing new contractor's dowels (procured from RDSO approved sources) and grouting around dowel with Epoxy materials of approved specification and refixing new Railway's rail/Plate screws duly greasing the s c r e w w i t h specified grease with all contractor's materials, consumables, tools & plants, labour with all lead, lift. Note: 1.Seized screws shall be identified and marked by JE/P.Way and verified at minimum SSE/P.Way In charge) level. 2. Due care shall be taken to avoid any damage to the sleeper 3.A penalty of 50% of the basic cost of new sleeper in nearest sleeper factory shall be levied on each, if sleeper gets damaged in the process. | Each | 3500.00 | 250.56 | 8,76,960 |
| 18 | Rail section of 52Kg and above | Each | 650.00 | 110.77 | 72,000.5 |
| 19 | Renewal of existing SEJ with improved SEJ with PSC sleepers under traffic block conditions as per approved drawing including fixing of special size bearing plate, rubber pad and other sleeper / rail fittings, greasing to the fittings, leading rails, sleepers & fittings to site, leading and stacking of released materials within a lead of 250m, cutting of Rails, drilling of holes, fixing of related fittings, providing temporary connection with fishplates till welding of SEJ is done and sleepers shall be given initial packing to make track fit for 20KMPH speed. Note: (1) Rail cutting and hole drilling shall be paid separately. (2) One set comprise complete SEJ on both rails at SEJ. | Set | 15.00 | 7,559.55 | 1,13,393.25 |
| 20 | Under Traffic Block Conditions | Set | 10.00 | 6,566.87 | 65,668.7 |
| 21 | Dismantling the existing BG Buffer-stop laid with rails & wooden/ST sleepers including leading the dismantled Buffer stop materials to nominated places within station yard limits and stacking as material-wise and classification-wise duly releasing all fittings carefully without causing any damage with all contractor's labour, tools, with all lead and lifts, crossing of tracks if any, etc., complete as directed by the Engineer-in-charge. | Set | 5.00 | 3,927.85 | 19,639.25 |
| 22 | 1 in 8½ Points & Crossing | Set | 50.00 | 11,565.13 | 5,78,256.5 |
| 23 | 1 in 12 Points & Crossing | Set | 26.00 | 15,720.77 | 4,08,740.02 |
| 24 | Derailing Switch | Set | 32.00 | 3,395.02 | 1,08,640.64 |
| 25 | Sleepers up to 2.85 m length | Each | 950.00 | 524.03 | 4,97,828.5 |
| 26 | Sleepers of length more than 2.85 m and up to 4.20 m | Each | 1200.00 | 721.59 | 8,65,908 |
| 27 | Sleepers of more than 4.20 m length | Each | 510.00 | 1,136.71 | 5,79,722.1 |
| 28 | 1 in 8½ Turnout | Set | 10.00 | 3,306.98 | 33,069.8 |
| 29 | 1 in 12 Turnout | Set | 20.00 | 3,618.15 | 72,363 |
| 30 | 1 in 8½ Switch Assembly | Set | 40.00 | 11,659.06 | 4,66,362.4 |
| 31 | 1 in 12 Switch Assembly | Set | 20.00 | 12,977.73 | 2,59,554.6 |
| 32 | For 1 in 12 Turnouts | Set | 25.00 | 26,527.96 | 6,63,199 |
| 33 | For 1 in 8.5 Turnouts | Set | 40.00 | 21,222.37 | 8,48,894.8 |
| 34 | 1 in 8.5 Turnouts | Set | 20.00 | 2,556.3 | 51,126 |
| 35 | 1 in 12 Turnout | Set | 15.00 | 4,119.29 | 61,789.35 |
| 36 | 1 in 16 Turnout | Set | 6.00 | 4,453.77 | 26,722.62 |
| 37 | For 1 in 12 Turnouts | Set | 10.00 | 6,457.78 | 64,577.8 |
| 38 | For 1 in 8.5 Turnouts | Set | 20.00 | 5,166.22 | 1,03,324.4 |
| 39 | For 1 in 16 Turnouts | Set | 5.00 | 7,749.33 | 38,746.65 |
| 40 | For 1 in 12 Turnouts (Sleeper No 1 to 25 and 5 approach sleepers) | Set | 80.00 | 1,543.31 | 1,23,464.8 |
| 41 | For 1 in 8.5 Turnouts & Derailing switches (Sleeper No 1 to 22 and 5 approach sleepers) | Set | 130.00 | 1,234.65 | 1,60,504.5 |
| 42 | For 1 in 16 Turnouts (Sleeper No 1 to 31and 5 approach sleepers) | Set | 4.00 | 1,851.97 | 7,407.88 |
| 43 | For 1 in 12 Turnouts (Sleeper No 65 to 73 ) | Set | 50.00 | 1,148.17 | 57,408.5 |
| 44 | For 1 in 8.5 Turnouts (Sleeper No 43 to 48) | Set | 55.00 | 918.54 | 50,519.7 |
| 45 | For 1 in 16 Turnouts (Sleeper No 77 to 86) | Set | 3.00 | 1,377.81 | 4,133.43 |
| 46 | Renewal of corroded slide chairs duly removing the old slide chairs by heating using contractors gas and equipments or by any approved methods and inserting Railways new slide chairs and plate screws including crossing of tracks, leading all required materials to site, stacking all released materials, with all contractor's tools, consumables, labour, lead, lift and incidental charges etc complete as directed by the Engineer in charge. Note: 1. All the fittings will be supplied at nearest SSE/Stores. 2. In case of damage of PSC sleeper, penalty at the rate of 25% of the current cost of sleeper shall be levied. | Each | 200.00 | 302.15 | 60,430 |
| 47 | Fabrication, supply and fixing of hand operated lever boxes with pull rod of 33mm dia to Drg.No. MA3040 including lead, lift, loading, unloading, tools and plants, transportation, crossing of track wherever necessary as directed by Engineer-in-charge at site. Note: 1. Rate including Fabrication, Supply and Fixing of hand operated boxes. 2. Spring point lever (Self reversing type) as per drawing no. TMC-12 (Sheet 1,2,3). | Set | 10.00 | 15,226.4 | 1,52,264 |
| 48 | Fabrication, supply and fixing of MS lock pins/bolts for stock and tongue rails made out of MS 40mm dia of length 200mm with head cutting, lathe machining, milling, drilling, welding the rod with MS flat of 6mm thick of suitable size as required at site with MS split pins/bolts and supplying of remaining ancillary materials required at for locking, including all taxes, lead, lift, loading and un loading , tools and plants, transportation, crossing of track whenever necessary etc., complete and as directed by Engineer-in- charge at site. | Set | 110.00 | 1,312.12 | 1,44,333.2 |
| 49 | Turnout sleepers of length up to 2.85 m | Each | 2000.00 | 118.86 | 2,37,720 |
| 50 | Sleepers of length more than 2.85 m and up to 4.20 m | Each | 2400.00 | 142.63 | 3,42,312 |
| 51 | Sleepers of length more than 4.20 m | Each | 1350.00 | 154.52 | 2,08,602 |
| 52 | Depth of 250 mm below bottom of sleeper of Plain Track | TRM | 1000.00 | 357.1 | 3,57,100 |
| 53 | Lifting and packing for regrading the existing PSC sleeper track to required height / level in stages not exceeding 75mm or part thereof at a time, providing permissible ramp for the track, insertion of moorum / sand / stone ballast uniformly under the existing track and placing the same to safe approved gradient, gauge, cushion including levelling and one round of through packing to allow train movement at restricted speed of 30 kmph for a specified length with all leads & lifts and fixing, marking, painting rail level pegs at every 30m interval. Note: Lifting of track shall be done in stages as per procedure prescribed in latest edition of IRPWM to get the proposed final level as per approved working profile, as directed by Engineer in- charge. | TRM | 1000.00 | 154 | 1,54,000 |
| 54 | Boxing and profiling of ballast as per procedure prescribed in latest edition of IRPWM including cess dressing on both sides of track. The work will include removing excess ballast from track and putting the same in crib and shoulder by leading to a maximum of 50m including crossing of track, deweeding on ballast section etc and as directed by Engineer-In charge. | TRM | 235000.00 | 22.66 | 53,25,100 |
| 55 | Under Traffic Block Conditions: | cum | 2000.00 | 45.35 | 90,700 |
| 56 | Under Traffic Block Conditions: | cum | 1795.00 | 102.98 | 1,84,849.1 |
| 57 | 25mm gap 'in-situ' welding during traffic block using Railway's welding portion & Welder and finishing of weld to meet the prescribed tolerances and pass all stipulated tests with all required labour, materials, consumables, tools, equipments etc. to complete the work in all respect as per IR's "Manual for Fusion Welding of Rails by Alumino - Thermic Process" with latest correction slips, including marking of welded joint, painting weld collar with anticorrosive paint, restoration of track near weld joint to original position and fixing of joggled fish plate at new weld, to be removed after passing of weld in USFD test as directed by Engineer in charge. Note: 1. Only welding portion and related accessories as per Annexure - I and Welder shall be supplied by Railways. 2. Hydraulic Weld trimmer shall be used for chipping and profile Grinder for finishing. 3. Required nos. of Joggled fish plates shall be supplied by Railway at nearest P. Way Stores and the same shall be returned at nearest P. Way Store or at other location as per direction of Engineer-in- Charge after release from track. | Each | 150.00 | 1,443.86 | 2,16,579 |
| 58 | In-situ reconditioning of MCI insert of points & crossings sleeper by reclaiming the worn-out portion to the desired height, grinding of the finished profile for regaining the toe load lost. The reconditioning to be done by using TERRA C I-94 - Electrodes of make L & T, Advani Oerlicon, Diffusion, SHARP - 650, or equivalent approved by RDSO for reconditioning of Cast iron alloys. removing and refixing the required fittings for reconditioning in traffic condition. The cost includes all labour, lead lift, transportation of men and material, cost of consumables, hiring of machinery required etc, complete and as directed by the Engineer-in -charge. | Each | 7000.00 | 266.29 | 18,64,030 |
| 59 | Assembling, laying and linking of Broad Gauge track over CC apron, RCC/CC Bed Blocks etc. to correct level & alignment, fixing of all fittings with rails / panels, aligning & leveling correctly, as directed by engineer in-charge. Rate is inclusive of cutting rails, drilling holes for fixing fish plates, lubrication of fittings & fastenings, fixing reference pillars, arrangement for keeping assembly in correct position while concreting, as required. | TRM | 1000.00 | 190.4 | 1,90,400 |
| 60 | Dismantling / removing the existing bearing plate and fixing new bearing plates supplied by Railways in pit lines, duly breaking / chiselling CC to required depth, so as to fix new bearing plates etc. with all contractor's labour, tools, lead, lift, transportation etc. including crossing of tracks complete and as directed by Engineer in-charge (concrete work for fixing will be paid separately) | Each | 3000.00 | 63.12 | 1,89,360 |
| 61 | For PSC sleeper Track with Sleeper Density of 1540 Sleepers/Km or more | TRM | 13500.00 | 89.98 | 12,14,730 |
| 62 | For PSC Sleeper | TRM | 12500.00 | 77.12 | 9,64,000 |
| 63 | For PSC Sleeper Track with Sleeper Density of 1540 | TRM | 5000.00 | 107.97 | 5,39,850 |
| 64 | For PSC Sleeper Track with Sleeper Density of 1660 | TRM | 5000.00 | 118.77 | 5,93,850 |
| 65 | 1 in 8½ PSC layout | Set | 120.00 | 9,887.36 | 11,86,483.2 |
| 66 | 1 in 12 PSC layout | Set | 100.00 | 12,857.58 | 12,85,758 |
| 67 | For PSC sleeper Track with Sleeper Density of 1540 sleepers/Km or more | TRM | 40000.00 | 153.29 | 61,31,600 |
| 68 | Replacing existing glued joint rail with cut rails or with glued joint rail or insertion of glued joint by cutting existing track under traffic condition by cutting rails, refixing with all rail sleeper fastenings and providing required gaps for carrying out welding as an alternative to drilling holes or joining rails with fish plates duly drilling holes as required including stacking of released material and as directed by engineer in-charge. Note: (1) Drilling holes & rail cutting will be paid separately. (2) Transportation of materials to the site of work from supply points, if more than 250m, shall be paid separately. | Each | 140.00 | 1,567.39 | 2,19,434.6 |
| 69 | With Contractor's hard wood block. | Each | 150.00 | 2,239.07 | 3,35,860.5 |
| 70 | Cleaning of side drains along the track including disposing of muck beyond Railway boundary as per instructions of Engineer in- charge to keep drains clean and clear in cuttings etc. | RM | 65000.00 | 27.86 | 18,10,900 |
| 71 | Removing weeds & bushes in ballast section and cess up to 3.95m from centre line of track in mid section & station yard, as specified by Engineer in-charge including disposal of branches, bushes outside cess/yard. | TRM | 180000.00 | 12.82 | 23,07,600 |
| 72 | For 60 Kg Rails | TRM | 7000.00 | 65.06 | 4,55,420 |
| 73 | For 52 Kg Rails | TRM | 4000.00 | 57.8 | 2,31,200 |
| 74 | Anti-corrosive painting to weld collar for Thermit welded rail joints on track for old painted joints in normal corrosive prone area for any rail section with two coats of ready mixed bituminous black paint of reputed make confirming to IS:9862 latest version on welded area up to 10cm on either side including on the underside of rail foot by brush including surface preparation as per Railway's AT Weld Manual including lettering / weld numbering with approved enamel paint as directed Note: 1.Before painting, dust, dirt and flaked paint from the welded joint shall be removed thoroughly by scrapping with wire brush. Grease and oil shall be removed by use of appropriate solvent confirming to latest IS:1745. 2.Use of detergent followed by water washing should also be done to ensure removal of oil and grease apart from the greasing compound. 3.The paint should be procured along with the thinner recommended by the manufacturer of the paint. 4.No other thinner like kerosene oil should be used. | Each | 2000.00 | 19.82 | 39,640 |
| 75 | Anti-corrosive painting to weld collar for Thermit welded rail joints on track for old painted joints in severe corrosive prone area for any rail section with one coat of high build epoxy paint (two pack) of reputed make confirming to RDSO Specification M&C/PCN- 111/99 on welded area up to 10cm on either side including on the underside of rail foot by brush including surface preparation as per Railway's AT Weld Manual including lettering / weld numbering with approved enamel paint as directed Note: 1.Before painting, dust, dirt and flaked paint from the welded joint shall be removed thoroughly by scrapping with wire brush. Grease and oil shall be removed by use of appropriate solvent confirming to latest IS:1745: 2.Use of detergent followed by water washing should also be done to ensure removal of oil and grease apart from the greasing compound. 3.The paint should be procured along with the thinner recommended by the manufacturer of the paint 4.No other thinner like kerosene oil should be used | Each | 400.00 | 39.09 | 15,636 |
| 76 | 1 in 12 Turnout | Set | 100.00 | 1,110.71 | 1,11,071 |
| 77 | 1 in 8½ Turnout | Set | 170.00 | 717.27 | 1,21,935.9 |
| 78 | Derailing Switch | Set | 34.00 | 358.63 | 12,193.42 |
| 79 | Kilometre & Gradient post | Each | 95.00 | 85.27 | 8,100.65 |
| 80 | LWR / SEJ Board | Each | 130.00 | 150.25 | 19,532.5 |
| 81 | Level Crossing Boards including Road Sign Boards | Each | 60.00 | 170.99 | 10,259.4 |
| 82 | Level Crossing Post | Each | 22.00 | 169.17 | 3,721.74 |
| 83 | Curve Post | Each | 70.00 | 90.22 | 6,315.4 |
| 84 | Curve Board | Each | 90.00 | 150.25 | 13,522.5 |
| 85 | Bridge Board | Each | 21.00 | 150.25 | 3,155.25 |
| 86 | Miscellaneous General Boards, Jurisdiction Boards, Structures etc. | Sqm | 40.00 | 116.55 | 4,662 |
| 87 | 60 Kg - 110/90 UTS - Outside Track | Each | 250.00 | 212.2 | 53,050 |
| 88 | 60 Kg - 110/90 UTS - On Running Line | Each | 200.00 | 270.31 | 54,062 |
| 89 | Outside Track | Each | 200.00 | 50.55 | 10,110 |
| 90 | On Running Line | Each | 200.00 | 64.84 | 12,968 |
| 91 | Drilling of holes (vertically) of required size into concrete sleeper in-situ for fixing guard rails and check rails on concrete sleeper track at specified locations by concrete sleeper drilling machine with contractor's tools & plants, equipment, consumable with all lead & lift etc. complete, as directed by Engineer in-charge as per RDSO's Specification. | Each | 10200.00 | 106.14 | 10,82,628 |
| 92 | For lead up to 500 metre. | MT | 100.00 | 331.77 | 33,177 |
| 93 | For lead beyond 500 metre and up to 1 Km | MT | 300.00 | 542.42 | 1,62,726 |
| 94 | I n Wagon where mechanical handling is possible and traffic block is not required or in Truck / trailer | MT | 400.00 | 81.45 | 32,580 |
| 95 | I n Wagon/Truck / trailer where mechanical handling is possible a n d traffic block is not required. | MT | 300.00 | 103.87 | 31,161 |
| 96 | For lead up to 500 metres | MT | 100.00 | 258.22 | 25,822 |
| 97 | For lead beyond 500 metre and up to 1 Km | MT | 300.00 | 382.26 | 1,14,678 |
| 98 | Lead up to 5 Km | MT | 100.00 | 52.2 | 5,220 |
| 99 | Lead beyond 10 Km and up to 20 km | MT | 100.00 | 155.1 | 15,510 |
| 100 | Lead beyond 50 Km and up to 100 Km | MT | 100.00 | 556.85 | 55,685 |
| 101 | Lead beyond 100 Km and up to 150 Km | MT | 50.00 | 892.86 | 44,643 |
| 102 | From Truck / Trailer | MT | 300.00 | 76.55 | 22,965 |
| 103 | From Truck / Trailer | MT | 400.00 | 79.45 | 31,780 |
| 104 | From Truck / Trailer | MT | 100.00 | 105.78 | 10,578 |
| 105 | Rails, switches, crossings, SEJ, Glued Joints, Check Rails etc. | MT | 400.00 | 329.1 | 1,31,640 |
| 106 | All type of PSC sleepers | MT | 900.00 | 359.4 | 3,23,460 |
| 107 | P.Way fittings of all types and other similar loose items | MT | 400.00 | 333.41 | 1,33,364 |
| 108 | Dismantling existing check rail of Level Crossing, blocks, bolts & nuts and stacking these in a countable manner near LC, free from any infringements as directed by Engineer in-charge. | RM | 200.00 | 156.93 | 31,386 |
| 109 | Level crossings with asphalted road surface | Sqm | 660.00 | 491.79 | 3,24,581.4 |
| 110 | Fabrication including cutting, bending/machining and fixing of check rails of all rail sections over PSC Sleepers as per Railway's approved drawings & specifications for level crossings / trolley paths/inspection lines in yards duly cutting rail flanges, wherever required to correct alignment and level, drilling of holes with machine in check rails and fixing to Running rail and sleepers with all Railway's fittings, e.g. rail screws / grip expansion bolts, brackets, packing pieces, bolts, washers etc including grinding of brackets if required, fixing of Railway's wooden blocks at flare ends duly cutting and plaining, crossing of tracks and as directed by the engineer in-charge Note: 1. Drilling of holes in PSC Sleeper and fixing of dowels shall be paid under relevant item. 2. Required P.Way materials will be supplied at SSE/P.Way stores. | TRM | 650.00 | 942.22 | 6,12,443 |
| 111 | 80mm thick blocks of M-35 grade for medium traffic. | Sqm | 300.00 | 999.79 | 2,99,937 |
| 112 | Erecting detonator rail posts at required locations as required including cutting the rail to required length varying from 1.00M to 1.50M , leading the rail pieces from nominated station / mid section from nearest depot to site of work, erecting the rail post by making the pit size as required and filling with CC 1:3:6 mix with 40mm aggregates and painting the rail post with two coats of synthetic enamel paint of approved colour and make, marking of detonator symbol as per site requirement, with contractor's materials, labour, paint, all lead and lifts, etc., complete as per specifications and as directed by the Engineer-in-charge. Note: Excavation and concrete work for foundation will be paid under relevant item. | Each | 50.00 | 375.49 | 18,774.5 |
| 113 | Erecting Emergency Chain Posts for level crossings , including cutting rail to required length varying from 1.00M to 1.50M , drilling holes, providing hooks & links / rings with necessary locking arrangements to fix emergency chain, leading the rail pieces from nominated station / mid section from nearest depot to site of work, erecting the rail post by making the pit of size as required and filling with CC 1:3:6 mix with 40mm aggregates and painting the rail post with two coats of synthetic enamel paint of approved colour and make, with contractor's materials, labour, paint, all lead and lifts, etc., complete as per specifications and as directed by the Engineer-in-charge. Note: (1) Rails & chain will be supplied by Railways. (2) Excavation and concrete work for foundation will be paid under relevant item. | Each | 28.00 | 457.44 | 12,808.32 |
| 114 | Providing Rail Barricading with rails supplied by Railways with verticals provided at every 1.5m interval, height of barricade being up to 1.5m above ground / termination level and one or more row of horizontal rail, duly cutting rails and drilling holes as required, assembling necessary accessories to required length, including earthwork excavation for foundation, fixing posts in cement concrete 1:3:6 base of size 0.45m x 0.45m x 0.60m and one coat of red oxide painting of steel work. Note: 1. Excavation and concrete work will be paid separately. 2. Rail shall be made available within 250 metres | MT | 350.00 | 1,386.19 | 4,85,166.5 |
| 115 | Drilling of 25mm to 40mm dia. holes in PSC sleepers with suitable rotary hammer / drilling machine at indicated location for fixing of guard rails on bridges & its approaches as per approved drawing and fixing of contractor's HDPE dowels and adhesive of approved quality to Drawing no. RDSO/T-3002, procured from RDSO's approved sources with contractor's materials and consumable. | Each | 300.00 | 227.05 | 68,115 |
| 116 | Renewal of existing guard rails of all rail sections on bridge portion over wooden/PSC/steel channel sleepers excluding flared ends duly leading new guard rails including cutting of rails, drilling holes to the guard rails as required and as per drawings, refixing with all fastenings, and leading back the released rail, stacking at nominated place clear of infringements with all leads & lifts complete and as directed. | TRM | 100.00 | 199.21 | 19,921 |
| 117 | Dismantling of existing flared portion of guard rails of any rail section over PSC sleepers duly removing rails & fastenings and leading and stacking released materials at nominated place within free lead, clear of infringements, complete and as directed. Note: One set consists of LH & RH side rails of one end. | Set | 4.00 | 1,783.81 | 7,135.24 |
| 118 | Clearing waterway of major & minor bridges by removing weeds / shrubs / bushes, removing silt deposit, filling scours, if any up to 10 metre from centre of bridge on either side including disposing waste and silt away from waterway. Note: Rate is for a single line and per metre of bridge span. | Metre | 410.00 | 184.57 | 75,673.7 |
| 119 | Overhauling of track on ballasted deck slab b r i d g e i.e. screening of crib ballast and shoulder ballast in between sleeper ends and ballast retaining walls on both sides of the track without disturbing core under the s l e e p e r under traffic following all safety precautions and other instructions prescribed by Engineer in-charge. Muck should be disposed of away from bridge up to a maximum distance of 350 m and lift up to 10m. | TRM | 100.00 | 270.22 | 27,022 |
| 120 | Tightening of steel channel sleeper fittings i.e. hook bolts, running rails bolts, guard rail bolts on girder bridges with contractor labour tools, plants etc., including oiling, greasing of fittings complete and as directed by engineer in charge. Note: Before execution of work specific approval of ADEN to be obtained by duly indicating the locations with specific reasons along with date of last tightening done. | Sleeper | 650.00 | 41.02 | 26,663 |
| 121 | Single Strip / Double Strip Level Crossing Road Warning Board of size 900 mm equilateral triangular shape and 900x300 board with back support frame welded to vertical post of MS T section of size 80mmx80mmx8mmx3650mm | Set | 10.00 | 7,517.39 | 75,173.9 |
| 122 | Caution Indicator Board of size 1400mmx400mm with back support frame fixed to vertical post of MS angle of size 50mmx50mmx6mm of 3650 mm long | Each | 10.00 | 6,231.22 | 62,312.2 |
| 123 | Speed Indicator Board of equilateral triangular shape having each side of 1000mm with back support frame fixed to vertical post of MS angle of size 50mmx50mmx6mm of 3650 mm long | Each | 10.00 | 5,388.98 | 53,889.8 |
| 124 | Stop Indicator Board of size 1400mmx400mm with back support frame fixed to vertical post of MS angle of size 50mmx50mmx6mm of 3650 mm long | Each | 10.00 | 6,231.22 | 62,312.2 |
| 125 | Termination Indicator Board of Circular shape having diameter of 1000mm with back support frame welded to vertical post of MS angle of size 50mmx50mmx6mm of 3950 mm long | Each | 10.00 | 7,524.7 | 75,247 |
| 126 | Manufacturing, supplying and fixing Curve Indicator / Point Indicator / SEJ Boards to be provided at various locations on formation, made out of MS sheet 2mm thick of size 450mm x 300mm duly fixed with MS frame of 25mm x 25mm x 3mm angle welded to 50mm x 50mm x 3mm MS angle, 1000mm long post split and bent 100mm at bottom end with all lead & lift as per specification and including painting of details with enamel paint, as directed by Engineer in-charge (Earthwork & concreting will be paid separately) | Each | 100.00 | 1,056 | 1,05,600 |
| 127 | 7.2 mm dia. | Each | 5.00 | 331.17 | 1,655.85 |
| 128 | 26.5 mm dia. | Each | 5.00 | 3,778.02 | 18,890.1 |
| 129 | 31.75 mm dia. | Each | 10.00 | 6,292.28 | 62,922.8 |
| 130 | Pressure Regulator for Oxygen Multi-stage cylinder | Each | 7.00 | 1,920.8 | 13,445.6 |
| 131 | Pressure Regulator for Acetylene gas cylinder | Each | 7.00 | 1,920.8 | 13,445.6 |
| 132 | 500amp Arc Welding Electrode Holder | Each | 4.00 | 112.6 | 450.4 |
| 133 | Gas Cutting Torch Blow Pipe | Each | 8.00 | 1,258.46 | 10,067.68 |
| 134 | Hand Gloves Leather (Left Hand & Right Hand) | Set | 10.00 | 331.17 | 3,311.7 |
| 135 | Hose Rubber for Oxygen 6mm dia. | Metre | 100.00 | 37.09 | 3,709 |
| 136 | Hose Rubber for Dissolved Acetylene (D.A.) 6mm dia. | Metre | 100.00 | 37.09 | 3,709 |
| 137 | Welding Screen (approximate size 4" x 3") | Each | 10.00 | 198.7 | 1,987 |
| 138 | Fixing vertically the unserviceable PSC sleepers at locations of tress-passing, railway boundary or to make temporary store by excavating trench, fixing PSC sleeper in trench and filling back open trench. | Each | 70.00 | 129.83 | 9,088.1 |
| 139 | Providing and fixing Trolley Refuge of size 3.0m x3.0m on cess, placing with released unserviceable PSC sleepers and keeping them at all four sides of refuge and also placing as matting inside the refuge by keeping them in upside down position with a minimum of 14 sleepers including levelling with earth, excavation, all lead and lift, crossing of tracks, leading the sleepers with in a free lead and lift, handling etc., with all contractor's men material complete and as directed by the Engineer-in-charge. Note: Earth-work will to be paid separately under relevant item. | Each | 45.00 | 3,471.5 | 1,56,217.5 |
| 140 | Supplying and spraying in specified proportion Weedicide Chemical, capable to kill entire weed on track / cess / embankment with all labour, material, tools & plants etc. complete job in all respect. Scientific name of the chemical is Isopropylamine Salt of Glyphosate, in which active ingredient is Glyphosate (41%), colour is light amber to brownish, very low in toxicity and has favourable environmental characteristics. It will be ensured that no weed growth occurs up to six months period, otherwise re- spraying shall be done by the contractor free of cost. | Sqm | 145000.00 | 0.58 | 84,100 |
| 141 | Manufacturing and fixing buffer stop with Railway supplied rails, cutting, including bending of rails as per plan ,with all contractor's labour, materials, tools, plants etc. and all lead and lift including crossing of track where necessary and as directed by Engineer in charge at site. Note: Excavation, fixing rails in cement concrete, drilling of holes will be paid separately. | Each | 10.00 | 14,080.46 | 1,40,804.6 |
| 142 | Manufacture and supply of Precast gradient Posts of size 1.65 x 0.60 x 0.075 m in RCC 1:2:4 mix, engraving letters and leading to work spot, fixing in position with CC 1:3:6 concrete duly making pits of size as required, painting the post, writing the letters on both sides of posts in 2 coats with enamel paint of approved quality to the Railways drawings/IRPWM with contractor's materials, cement, steel, labour, tools, plant, with all lead and lifts etc., complete as per specifications and as directed by the Engineer-in-charge. Note: Excavation, Concrete and steel work will be paid under relevant items. | Each | 20.00 | 515.8 | 10,316 |
| Schedule total | ₹4,49,19,586.74 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Mastertenderbooklet2ason26.03.2026.pdf
ATTACHMENT
Mastertenderbooklet1ason26.03.2026.pdf
ATTACHMENT
169-CR-26-Schedule.pdf
ATTACHMENT
169-CR-26-Scopeofwork.pdf
ATTACHMENT
Trackconditions.pdf
ATTACHMENT
SpecialconditionsJCB.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .