| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹91.8 LAccepted-AOC | ₹91.8 L Quoted ₹92.3 L | L1 | Accepted-AOC L1 offerer |
| 2 | L2₹1.0 Cr+₹10.9 L (11.8%)Rejected-Finance 30 1 BHAVANI MAIN ROAD VEERAPANCHATRAM ERODE 638004 | ERODE | TAMIL NADU | 638004 | ₹1.0 Cr+₹10.9 L (11.8%) | L2 | Rejected-Finance L2 offerer |
| Sl No | Description | Qty | Unit | CONTINENTAL CONSTRUCTION COMPANY L1 | THANGAM CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work narrow excavation for foundatuon in all soils and sub soils and to full depth as may be directed expect hard work reuiring blasting inclusive of shorting, shuttering and bailing out water where ever necessary and depositig the surplus earth on bank with initial lead of 10m and initial lift of 2m clearing and levelling the site etc., complete as directedby the federation officers ans as per standard spcifications , | 224 | Cum | 270 ₹60,480 Lowest | 300 ₹67,200 |
| 2.00 | Supply and filling with M.sand for foundation and basement to required thickness and in layers of not more than 15 cm thick, watered, well rammed and consolidated etc., complete as directed by the Federation Officers and as per standard specifications. | 28 | Cum | 1,800 ₹50,400 Lowest | 2,200 ₹61,600 |
| 3.00 | Supplying and filling with gravel for foundation and basement to required thickness, watered, well rammed and consolidated etc., completed with standard specification and as directed by the departmental officers. | 680 | Cum | 325 ₹2,21,000 Lowest | 600 ₹4,08,000 |
| 4.00 | Plain Cement Concrete 1:4:8 (one part of cement, five parts of sand and ten parts of hard broken stone) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. | 53 | Cum | 5,000 ₹2,65,000 Lowest | 5,400 ₹2,86,200 |
| 5.00 | Reinforced cement concete 1:1.5:3 (One cement one and half M sand and three aggricate) using machine crushed 20mm gauge hard broken granite stone jelly for all reinforced cement concrete work connected to this work excluding centering, shuttering and cost of reinforcement grills placed in positions, but including laying, vibrating curing and finishing, fixing fan clamps in RCC floors in roof slabs. works wherever necessory and bearing surfaces of wall at the sides and bottom of the slabs, beams etc. Complete complying with standard specification and has directed by the departmental officers - Up to basement | 128 | Cum | 8,500 ₹10,88,000 Lowest | 9,000 ₹11,52,000 |
| 6.00 | Reinforced cement concete 1:1.5:3 (One cement one and half M sand and three aggricate) using machine crushed 20mm gauge hard broken granite stone jelly for all reinforced cement concrete work connected to this work excluding centering, shuttering and cost of reinforcement grills placed in positions, but including laying, vibrating curing and finishing, fixing fan clamps in RCC floors in roof slabs. works wherever necessory and bearing surfaces of wall at the sides and bottom of the slabs, beams etc. Complete complying with standard specification and has directed by the departmental officers - Abovebasement | 9 | Cum | 8,700 ₹78,300 Lowest | 9,200 ₹82,800 |
| 7.00 | Supplying and erecting centering and shuttering for soffits including necessary supports and strutting upto 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) - Up to Basement-Column surface | 57 | Sqm | 900 ₹51,300 Lowest | 1,000 ₹57,000 |
| 8.00 | Up to Basement-Plainsurface | 284 | Sqm | 900 ₹2,55,600 Lowest | 1,000 ₹2,84,000 |
| 9.00 | Up to Basement- Wall surface | 710 | Sqm | 900 ₹6,39,000 Lowest | 1,000 ₹7,10,000 |
| 10.00 | Above basement-Column surface | 111 | Sqm | 1,000 ₹1,11,000 Lowest | 1,100 ₹1,22,100 |
Tender Value
Refer Docs
EMD Value
₹92,400
Closing Date
24 Jun 2025, 3:00 pmClosed
DGM Civil
TCMPF Limited, Aavin illam , Nandanam-35
Construction of additional length of Compound wall Road and Briquttee stoage godown at 300 MTPD Capacity Cattle feed Plant at Pudukudi Thanjavur
2025_TCMPF_566807_1
5348/Engg.3/2025
Open Tender
Civil Works
Lump-sum
90 days
Pudukudi
refer tender document
9 documents required · 9 mandatory
₹0
₹92,400
Yes
TCMPF Limited, Aavin illam , Nandanam-35
8 Aug 2025
10 Jun 2025
25 Jun 2025
10 Jun 2025
24 Jun 2025
16 Jun 2025
10 Jun 2025 - 24 Jun 2025
12 Jun 2025
Amount
Earth work narrow excavation for foundatuon in all soils and sub soils and to full depth as may be directed expect hard work reuiring blasting inclusive of shorting, shuttering and bailing out water where ever necessary and depositig the surplus earth on bank with initial lead of 10m and initial lift of 2m clearing and levelling the site etc., complete as directedby the federation officers ans as per standard spcifications ,
Supply and filling with M.sand for foundation and basement to required thickness and in layers of not more than 15 cm thick, watered, well rammed and consolidated etc., complete as directed by the Federation Officers and as per standard specifications.
Supplying and filling with gravel for foundation and basement to required thickness, watered, well rammed and consolidated etc., completed with standard specification and as directed by the departmental officers.
Plain Cement Concrete 1:4:8 (one part of cement, five parts of sand and ten parts of hard broken stone) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement.
Reinforced cement concete 1:1.5:3 (One cement one and half M sand and three aggricate) using machine crushed 20mm gauge hard broken granite stone jelly for all reinforced cement concrete work connected to this work excluding centering, shuttering and cost of reinforcement grills placed in positions, but including laying, vibrating curing and finishing, fixing fan clamps in RCC floors in roof slabs. works wherever necessory and bearing surfaces of wall at the sides and bottom of the slabs, beams etc. Complete complying with standard specification and has directed by the departmental officers - Up to basement
Reinforced cement concete 1:1.5:3 (One cement one and half M sand and three aggricate) using machine crushed 20mm gauge hard broken granite stone jelly for all reinforced cement concrete work connected to this work excluding centering, shuttering and cost of reinforcement grills placed in positions, but including laying, vibrating curing and finishing, fixing fan clamps in RCC floors in roof slabs. works wherever necessory and bearing surfaces of wall at the sides and bottom of the slabs, beams etc. Complete complying with standard specification and has directed by the departmental officers - Abovebasement
Supplying and erecting centering and shuttering for soffits including necessary supports and strutting upto 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) - Up to Basement-Column surface
Up to Basement-Plainsurface
Up to Basement- Wall surface
Above basement-Column surface
Above basement-Plain surface
Supplying and fabricating and placing in position ribbed Tor steel /TMT bars for all RCC works as per design given including cost of steel and binding wire in all floors etc. complete complying with standard specifications
Brick work in CM 1: 5 (one cement five sand) using II class ground moulded bricks of size 9"x 4 ½" x 3¾" including finishing, curing etc., complete complying with standard specifications - Up to basement
Above basement
Plastering with cement mortar 1:5 - 12 mm thick in all floors including cost and conveyance of all materials to site and labour charges etc., complete as per specifications.
Supplying & erecting structural steel of various section like Joist, channel section and purlin in suitable position inclusive of all labour charges for making joints, clit angles, welding, placing in position etc., as directed by the Federation officers and as per standard specifications.
Supplying and fixing in position of Galvalume roofing sheet of 0.47mm thick with necessary bolts, nuts and washers, metal screws etc. complete with standard specification and as directed by the departmental officers.
Supply and applying 1 coat of white cement, 1 coat primer, 2 coat Emulsion painting. Rate including all material, labour charges, scaffolding,all lead, lift, transportation, etc complete. (at all levels, elevations and heights.)
Supply & fixing of steel rolling shutter ( Pull and push type with ISI monogram ) of approved quality with MS laths 75mm wide and 18 gauge thick to different sizes including all accessories like sliding grooves, shafts, spring, bearings, hood & locking arrangements and grouting the sides & top assembly with walls & beams, one coat of red oxide primer etc., complete as directed by the federation officers. and as per standard specifications
Supplying and Painting new iron works with two coats of best approved first quality and colour of syenthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete as directed by the departmental officials (M-0764)
Supplying and fixing UPVC (Un-Plasticized Polyvinyl Chloride) Windows of casement type (open) from the profile the size of outer frame 60mm x 58mm and shutter profile are reinforcement with GI/1mm 125GSM and 100% corrosion free, the profiles are multi chambered sections with wall thick of 2mm. The EPDM rubber (black colour) covered with over all the edges of frame and shutter the shutter will be provided with Espag multi power point locks and also it operates as handle. The corners and joints should be welded and cleaned. Radiations free pin headed plain or brown colour glass 4mm thick should be provided to the shutter and it should not allow leakage of water even at most ranging storms and should have key lockable action, security protective hinges, strong locking systems and as per size for arresting noise and energy loss. The connecting mechanism between sash and outer frame that enables opening of the window. The window should be fixed to the wall with 100% packing with screws and silicon packing all round the frames. The window should be got approved from the Executive Engineer before use on work
supply and fixing of turbo ventilator over the roofing sheet which proper screwing and sealant without any leak in the roof.
Providing,laying,spreading and compacting graded stone aggregates for Wet Mix Macadam 150mm thick,including pre mixing the materials with water at OMC in mechnanical mixplant,conveyance of mixed materials by tipper to site,laying in uniform layers using pavers in SubBase/Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material,labour charges,rentals for machinery,fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5
Supplying and laying of interlocking paver block stone 83 mm thick over a base layer of sand filling including cost of materials laying and labour charges etc., complete as directed by the departmental officers.
Supplying and laying 40 mm grade HBGs stone jelly for transformer yard etc Complete
Supply and fixing of 110 mm dia pvc pipe sanitary arrangement including cost and conveyance of all charges etc., Complete
GST (Note: The tenderer should quote the amount towards Goods and Service tax (GST) in the appropriate columns in terms of percentage (%). If not quoted, it will be considered that the rate quoted is inclusive of GST.)
THANGAM CONSTRUCTION (BID ID -1377531)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .