Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹100.0 LAccepted-AOC PANDHARPUR TAL PANDHARPUR DISTRICT SOLAPUR | ₹100.0 L | 1st | Accepted-AOC AOC |
| 2 | 2nd₹100.0 LSame as 1STRejected-AOC SHOP NO 15 JALPRAKASH MUNDADA COMPLEX MAIN ROAD BASMATH 431512 | BASMATH | HINGOLI | MAHARASHTRA | 431512 | ₹100.0 LSame as 1ST | 2nd | Rejected-AOC AOC |
| 3 | 3rd₹1.0 Cr+₹1.7 L (1.67%)Rejected-AOC | ₹1.0 Cr+₹1.7 L (1.67%) | 3rd | Rejected-AOC AOc |
| 4 | 3₹1.0 Cr+₹3.3 L (3.33%)Rejected-AOC | ₹1.0 Cr+₹3.3 L (3.33%) | 3 | Rejected-AOC AOc |
| 5 | 4th₹1.0 Cr+₹2.5 L (2.51%)Rejected-AOC R O GHANANANDDHAM CHAUK TOPHKHANA HINGOLI DISTRICT HINGOLI 431513 | HINGOLI | MAHARASHTRA | 431513 | ₹1.0 Cr+₹2.5 L (2.51%) | 4th | Rejected-AOC AOC |
Tender Value
₹1 Cr
EMD Value
₹1 L
Closing Date
7 Feb 2025, 6:00 pmClosed
Executive Engineer (Works) Div Bhokar ZP Nanded
Executive Engineer (Works) Div Bhokar ZP Nanded
Construction of flood protection wall at laglud tg bhokar dist nanded (Under disaster Miigation )
2025_NANDE_1141592_4
ZPN/WD/Bhok/e.TEN30/OPEN/24-25
Open Tender
Civil Works
Percentage
180 days
Construction of flood protection wall at laglud tg
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,180
₹1 L
29 Jul 2026
24 Jan 2025
10 Feb 2025
24 Jan 2025
7 Feb 2025
24 Jan 2025
eProcurement System Government of Maharashtra Created By: VISHAL SAMPATRAO CHOPADE Created Date/Time: 20-Aug-2025 02:36 PM Tender Title: Construction of flood protection wall at laglud tg bhokar dist nanded (Under disaster Miigation ) Tender ID: 2025_NANDE_1141592_4
Tender Inviting Authority: EXECUTIVE ENGINEER WORKS ZP DIV BHOKAR
Name of Work: CONSTRUCTION OF FLOOD PROTECTION WALL AT LAGLOOD TQ. BHOKAR DIST. NANDED (UNDER DISASTER MITIGATION)
Contract No: ZPND/NAND/E.NOT
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 Suresh Shelke (GSTN-27BZLPS4927D1Z0) BID ID -6475466 9999998.879 3.330 10332998.842 One Crore Three Lakh Thirty Two Thousand Nine Hundred and Ninty Eight
2.00 Mannaspimparikar Construction Prop Gajanan C. Pariskar (GSTN-27DBXPP9029K1ZK) BID ID -6475619 9999998.879 2.510 10250998.851 One Crore Two Lakh Fifty Thousand Nine Hundred and Ninty Eight
3.00 SHIVKRUPA CONSTRUCTION (GSTN-NA) BID ID -6475229 9999998.879 0.000 9999998.879 Ninty Nine Lakh Ninty Nine Thousand Nine Hundred and Ninty Eight
4.00 SATYASAI CONSTRUCTION (GSTN-NA) BID ID -6475564 9999998.879 1.670 10166998.860 One Crore One Lakh Sixty Six Thousand Nine Hundred and Ninty Eight
5.00 KABRA CONSTRUCTION (GSTN-NA) BID ID -6475264 9999998.879 -0.000 9999998.879 Ninty Nine Lakh Ninty Nine Thousand Nine Hundred and Ninty Eight
6.00 SHRI VISHAL CONSTRUCTION (GSTN-NA) BID ID -6477780 9999998.879 11.200 11119998.753 One Crore Eleven Lakh Ninteen Thousand Nine Hundred and Ninty Eight
Lowest Amount Quoted BY: SHIVKRUPA CONSTRUCTION,KABRA CONSTRUCTION(9999998.879)
BOQ Summary Details Tender Title: Construction of flood protection wall at laglud tg bhokar dist nanded (Under disaster Miigation ) Tender ID: 2025_NANDE_1141592_4
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 SHIVKRUPA CONSTRUCTION (BID ID -6475229) 9999998.879 L1
2 KABRA CONSTRUCTION (BID ID -6475264) 9999998.879 L1
3 SATYASAI CONSTRUCTION (BID ID -6475564) 10166998.860 L2
4 Mannaspimparikar Construction Prop Gajanan C. Pariskar (BID ID -6475619) 10250998.851 L3
5 Suresh Shelke (BID ID -6475466) 10332998.842 L4
6 SHRI VISHAL CONSTRUCTION (BID ID -6477780) 11119998.753 L5
stage.html
html • 0.06 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .