| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAccepted-AOC HIMACHAL PRADESH HP | L1 | Accepted-AOC L1 | |
| 2 | L2₹9.8 L+₹51,215.25 (5.54%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical R O VILLAGE KALYANA P O KANLOG TEHSIL DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical NOT AVAILABLE | FARIDABAD | HARYANA | 121004 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | AKSHAY GOVT. CONTRACTOR L2 | AJAY KUMAR L1 |
|---|---|---|---|---|---|
| 1.01 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in for all leads & lifts, laying in uniform layers with mechanical paverfinisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achievethe desired density, complete as per specifications and directions of Engineer-in-Charge. including entire carriage of material within all leads and lifts and other incidentals.The rates are inclusive octroi, royality, Malkana, toll tax,sale tax, GST or other taxes imposed by the Government. | 159.63 | Per cubic metre | 2,250 ₹3,59,167.5 | 2,200 ₹3,51,186 Lowest |
| 2.01 | Providing and applying primer coat with bitumen emulsion (SS-I) on prepared surface of granular base including cleaning of road surface and spraying primer @ 0.70-1.0 kilogram (zero point seven zero to one point zero kilogram per square meter) using mechanical means as per technical specification clause –502 and as per direction of Engineer-in-Charge including entire carriage of material within all leads and lifts and other incidentals.The rates are inclusive octroi, royality, Malkana, toll tax,sale tax, GST or other taxes imposed by the Government. | 1,601.25 | Per square metre | 75 ₹1,20,093.75 | 65 ₹1,04,081.25 Lowest |
| 3.01 | Providing and applying tack coat with bitumen emulsion using emulsion (RS-1) distributor at the rate of 0.25 to 0.30 kg. (zero point two five to zero point three zero kilogramme) per sqm on the prepared bitumen surfaces cleaned with Hydraulic broom as per technical specification clause 503 as per the direction of the Engineer-in-charge including entire carriage of material within all leads and lfts and other incidentals.The rates are inclusive octroi, royality, Malkana, toll tax,sale tax, GST or other taxes imposed by the Government. | 1,601.25 | Per square metre | 30 ₹48,037.5 | 23 ₹36,828.75 Lowest |
| 4.01 | 2 cm (two centimeter ) premix carpet surfacing with 1.8 cum(one point eight cubic metre) and 0.90 cum (zero point nine zero cubic metre) of stone chippings of 13.2 mm (thirteen point two millimeter) size and 11.2 mm (eleven point two millimeter) size respectively per 100 sqm (one hundred square metre) and 52 kg (fifty two kilograme) and 56 kg (fifty six kilograme) of hot bitumen per cum of stone chippings of 13.2 mm (thirteen point two millimeter) and 11.2 mm (eleven point two millimeter) size respectively, including a tack coat with hot straight run bitumen, including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately). With paving Asphalt grade VG - 30 heated and then mixed with solvent at the rate of 70 grams per kg of asphalt as per direction of Engineer- in -Charge, including entire carriage of material within all leads and lifts and other incidentals.The rates are inclusive octroi, royality, Malkana, toll tax,sale tax, GST or other taxes imposed by the Government. | 1,601.25 | Per square metre | 200 ₹3,20,250 | 195 ₹3,12,243.75 Lowest |
| 5.01 | Providing and laying seal coat of premixed fine aggregate ( passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg (one hundrede twenty eight kilograme) of bitumen of grade VG - 30 bitumen per cum of fine aggregate and 0.60 cum (zero point six zero only) of fine aggregate per 100 sqm of road surface, including rolling and finishing with road roller all complete. as per direction of Engineer- in -Charge, including entire carriage of material within all leads and lifts and other incidentals.The rates are inclusive octroi, royality, Malkana, toll tax,sale tax, GST or other taxes imposed by the Government. | 1,601.25 | Per square metre | 80 ₹1,28,100 | 75 ₹1,20,093.75 Lowest |
Tender Value
₹9.0 L
EMD Value
₹18,100
Closing Date
24 Jan 2023, 5:00 pmClosed
EXECUTIVE ENGINEER
Executive Engineer, Tauni Devi Division, HP.PWD., Tauni Devi
SH Matalling tarring work in km. 00 to 0500 Under OTMNP
2023_PWD_67304_1
PW-TDD-GA-NIT-22-23-15393-448 DT. 2.1.2023
Open Tender
Civil Works - Roads
Item Rate
60 days
TAUNI DEVI
Please refer Tender documents.
19 documents required · 19 mandatory
₹350
₹18,100
13 Jan 2026
19 Jan 2023
27 Jan 2023
19 Jan 2023
24 Jan 2023
19 Jan 2023
Amount
Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in for all leads & lifts, laying in uniform layers with mechanical paverfinisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achievethe desired density, complete as per specifications and directions of Engineer-in-Charge. including entire carriage of material within all leads and lifts and other incidentals.The rates are inclusive octroi, royality, Malkana, toll tax,sale tax, GST or other taxes imposed by the Government.
Providing and applying primer coat with bitumen emulsion (SS-I) on prepared surface of granular base including cleaning of road surface and spraying primer @ 0.70-1.0 kilogram (zero point seven zero to one point zero kilogram per square meter) using mechanical means as per technical specification clause –502 and as per direction of Engineer-in-Charge including entire carriage of material within all leads and lifts and other incidentals.The rates are inclusive octroi, royality, Malkana, toll tax,sale tax, GST or other taxes imposed by the Government.
Providing and applying tack coat with bitumen emulsion using emulsion (RS-1) distributor at the rate of 0.25 to 0.30 kg. (zero point two five to zero point three zero kilogramme) per sqm on the prepared bitumen surfaces cleaned with Hydraulic broom as per technical specification clause 503 as per the direction of the Engineer-in-charge including entire carriage of material within all leads and lfts and other incidentals.The rates are inclusive octroi, royality, Malkana, toll tax,sale tax, GST or other taxes imposed by the Government.
2 cm (two centimeter ) premix carpet surfacing with 1.8 cum(one point eight cubic metre) and 0.90 cum (zero point nine zero cubic metre) of stone chippings of 13.2 mm (thirteen point two millimeter) size and 11.2 mm (eleven point two millimeter) size respectively per 100 sqm (one hundred square metre) and 52 kg (fifty two kilograme) and 56 kg (fifty six kilograme) of hot bitumen per cum of stone chippings of 13.2 mm (thirteen point two millimeter) and 11.2 mm (eleven point two millimeter) size respectively, including a tack coat with hot straight run bitumen, including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately). With paving Asphalt grade VG - 30 heated and then mixed with solvent at the rate of 70 grams per kg of asphalt as per direction of Engineer- in -Charge, including entire carriage of material within all leads and lifts and other incidentals.The rates are inclusive octroi, royality, Malkana, toll tax,sale tax, GST or other taxes imposed by the Government.
AKSHAY GOVT. CONTRACTOR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .