| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.8 LAccepted-Finance AMTALA MAMUDPUR PAL PARA KANYANAGAR NIBARAN DUTTA ROAD SOUTH 24 PARGANAS WEST BENGAL 743398 | 743398 | 1 | Accepted-Finance Admitted | |
| 2 | 2₹9.4 L+₹64,120 (7.29%)Accepted-Finance AURI MOR ANPARA SONEBHADRA ANPARA SONBHADRA UTTAR PRADESH 231225 | SONBHADRA | UTTAR PRADESH | 231225 | 2 | Accepted-Finance Admitted | |
| 3 | Rejected-Technical R O AT VILL BHADIWA POST AMBA DISTT VARANASI UP 221104 | VARANASI | VARANASI | UTTAR PRADESH | 221104 | - | Rejected-Technical Experience certificate not submitted |
Tender Value
₹8.8 L
EMD Value
₹10,000
Closing Date
9 Jun 2020, 2:00 pmClosed
SUPERINTENDING ENGINEER
Office of the Superintending Engineer, O and MC-II, 2X500 MW, DTPP, Anpara Thermal Power Station, Anpara
Works of Insulation, Refractory works, removal of accumulated fly ash from inside the heating surface and other areas of Boiler and their disposal from Boiler of unit no. 6 and 7 DTPS Anpara
2020_RVUNL_468130_1
T01/BMD-I/DTPS/2020-21
Open Tender
Power/Energy Projects/Products
Fixed-rate
365 days
DTPS, ANPARA.
Tender cost, EMD and validity agreement etc.
2 documents required · 2 mandatory
₹1,180
Dy GM CFA and BO DTPS, Anpara
₹10,000
Yes
14 Aug 2020
11 May 2020
11 Jun 2020
11 May 2020
9 Jun 2020
11 May 2020
Amount
Complete Insulation of pipe lines, Pressure parts Main Boiler, ESP, Ducts and other associated equipments of 2x500 M.W. Boilers (Rate should be Quoted separately for item No1.11 (i)&(ii) and 1.2 (i) & (ii)
When new cladding is to be provided with 18-24 Gauge (Aluminium sheet shall be provided by the department free of cost). Work includes fabrication and fixing of cladding structure. When one layer of mineral wool blankets/ pads or Calcium silicate pipe section of thickness 25/40/ 50/ 60/75 mm, are provided / fixed at site.
When new cladding is to be provided with 18-24 Gauge (Aluminium sheet shall be provided by the department free of cost). Work includes fabrication and fixing of cladding structure. When more than one layer of mineral wool blankets/ pads or calcium silicate pipe section of thickness 25/40/50/60/75 mm, are provided / fixed at site,
Old/removed
When old/ removed cladding sheets to be fixed with the help of self tapping screws.When one layer of mineral wool blankets/ pads or Calcium silicate pipe section of thickness 25/40/ 50/ 60/75 mm, are provided or the old/ removed but usable are provided/ fixed at site.
When old/ removed cladding sheets to be fixed with the help of self tapping screws,When more than one layer of mineral wool blankets/ pads or calcium silicate pipe section of thickness 25 /40/ 50/ 60 /75 mm, are provided or the old/ removed but usable are provided/ fixed at site.
Insulation of Headers in Pent House/ out side : When more than one layer of mineral wool blankets /pads of thickness 25/40/50/60/70 mm, are provided /fixed on the headers in pent house etc.
Application of mineral wool blankets/ pads and fixing with G.I. wire on H,P./ L.P. Valves of Boiler. Application of insulating powder, hard lag/ mastic compound & finishing / cladding with G.I. / Aluminum sheets of 18-24 gauge wherever required as per site requirement or as instructed.
Application of Refractory in Main Boiler/Pressure parts heating zones.
Cleaning and removal of fly ash/ foreign materials/ debris etc. and their disposal to dumping yard from the following heating areas of Boiler Pressure parts.
From Low temperature Super Heater chamber inside the Boiler
From Economiser Chamber inside the Boiler
From gallery between reheaters and arch tubes inside the Boiler
From pent house above furnace
From gallery between Platen superheater and reheater in pent house.
From gallery between CRH header and HRH header in pent house.
From gallery between divisional superheater to platen super heater in pent house.
From gallery between/around all the four Divisional superheater headers in pent house.
From extended furnace house between 1st and 2nd pass of Boiler.
From economizer hopper of Boiler.
From gallery along with water wall header left/ right/front in pent house from divisional super heater to platen super heater area.
Cleaning and removal of fly ash/ foreign materials/ debris etc. and their disposal to dumping yard from the following areas of Boiler.
Hot secondary air duct from Air pre heater to wind Box (L)
Hot secondary air duct from Air pre heater to wind box ®
Boiler furnace wind box (L)
Boiler furnace wind box (R)
Inter connecting duct of hot secondary air
From inlet damper to outlet damper of air and flue gas duct of Air preheater including Air preheater.
Cleaning and removal of fly ash/ foreign materials/ debris /garbage/ pigeon shits etc. from pent house roof of Boiler by sweeping with hard broom / wire brush and their disposal to dumping yard.
Cleaning /sweeping and removal of fly ash/ foreign Materials/ debris / garbage etc. from dog house of Boiler and their disposal to dumping yard
Cleaning and removal of fly ash/ foreign materials / debris / garbage etc. from S-panel of Boiler and their disposal to dumping yard.
Cleaning and removal of fly ash/ foreign materials/ Debris/ garbage / insulating materials/ pigeon shits etc. from buck stays of 1st and 2nd pass of Boiler from 11 mtr. Boiler elevation up to 80 mtr and sweeping with hard broom/ wire brush and their disposal to dumping yard.
SHAKSHI ENGINEERING CO.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .