Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAdmitted-Finance | ₹3.3 L | L1 | Admitted-Finance |
| 2 | L2₹3.5 LAdmitted-Finance | ₹3.5 L | L2 | Admitted-Finance |
| 3 | L3₹3.7 LAdmitted-Finance MARUTHUR SOUTH | 24 PARAGANAS SOUTH | WEST BENGAL | 700070 | ₹3.7 L | L3 | Admitted-Finance |
| 4 | L4₹4.1 LAdmitted-Finance | ₹4.1 L | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | V.SANGEETHA L1 | THIRAVIDAMANI PANNERSELVAM L4 | I.Vetharathinam L2 | UDHAYAM MURUGAIYAN CONSTRUCTION L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | 01.Repairs to VPSC Building at Ayakkaranpulam 4 Panchayat. Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick | 82.28 | Sqm | 350 ₹28,798 | 1,286.4 ₹1.1 L | 371 ₹30,525.88 | 390 ₹32,089.20 |
| 2.00 | White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed. | 119 | Sqm | 35 ₹4,165 | 37.44 ₹4,455.36 | 39 ₹4,641 | 40 ₹4,760 |
| 3.00 | Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, | 242.47 | Sqm | 125 ₹30,308.75 | 144 ₹34,915.68 | 150 ₹36,370.50 | 180 ₹43,644.60 |
| 4.00 | Painting the newly plastered wall surface with two coats of colour emulsion outside the building over one coat of cement primer including clearing the surface in all floors etc., complete as per standard specification. | 203.54 | Sqm | 245 ₹49,867.30 | 256.32 ₹52,171.37 | 267 ₹54,345.18 | 280 ₹56,991.20 |
| 5.00 | Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) | 97.48 | Sqm | 145 ₹14,134.60 | 152.64 ₹14,879.35 | 159 ₹15,499.32 | 180 ₹17,546.40 |
| 6.00 | Provsion for Door Repairs | 4 | each | 450 ₹1,800 | 480 ₹1,920 | 500 ₹2,000 | 650 ₹2,600 |
| 7.00 | Provision for Septic tank Cleaning | 1 | each | 4,500 ₹4,500 | 4,800 ₹4,800 | 5,000 ₹5,000 | 5,500 ₹5,500 |
| 8.00 | Provision for water Supply arrangements and Toilet Repairs | 1 | each | 3,000 ₹3,000 | 6,720 ₹6,720 | 5,000 ₹5,000 | 5,500 ₹5,500 |
| 9.00 | Provision for Name Board and Photo charges etc | 1 | each | 1,000 ₹1,000 | 1,152 ₹1,152 | 2,000 ₹2,000 | 2,500 ₹2,500 |
| 10.00 | 02. Repairs and renovation of 30000 ltr OHT at Thimmappanayakkankuthagai in Ayakkaranpulam 4 Panchayat. Dismantling the existing plastering surface to provide new plastering and clearing away the material from the site etc., complete | 1.98 | Sqm | 8 ₹15.84 | 9 ₹17.82 | 9 ₹17.82 | 10 ₹19.80 |
Tender Value
₹3.5 L
EMD Value
₹3,510
Closing Date
10 Mar 2026, 4:00 pmClosed
Block Development Officer(BP),Vedaranyam
Block Development Office, Vedaranyam
01.Repairs to VPSC Building at Ayakkaranpulam 4 Panchayat 2.Repairs and renovation of 30000 ltr OHT at Thimmappanayakkankuthagai in Ayakkaranpulam 4 Panchayat
2026_RDTN_671850_3
RD-NGP/498/2025-A2
Open Tender
Civil Works
Works
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3,510
9 Jun 2026
7 Mar 2026
10 Mar 2026
7 Mar 2026
10 Mar 2026
7 Mar 2026
7 Mar 2026 - 10 Mar 2026
01.Repairs to VPSC Building at Ayakkaranpulam 4 Panchayat. Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick
White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed.
Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes,
Painting the newly plastered wall surface with two coats of colour emulsion outside the building over one coat of cement primer including clearing the surface in all floors etc., complete as per standard specification.
Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use)
Provsion for Door Repairs
Provision for Septic tank Cleaning
Provision for water Supply arrangements and Toilet Repairs
Provision for Name Board and Photo charges etc
02. Repairs and renovation of 30000 ltr OHT at Thimmappanayakkankuthagai in Ayakkaranpulam 4 Panchayat. Dismantling the existing plastering surface to provide new plastering and clearing away the material from the site etc., complete
Supply and erection of steel centering, shuttering for soffits and sides including necessary supports and strutting for all RCc works using MS Sheets of suitable size of BG10 stiffened With MS angle of size 25x25x3mm for boarding laid over I type MS truss etc., complete.
Reinforced Cement Mix M30 grade using 10mm and 20mm Hard blue granite broken stone (machine crushed) excluding the cost of RTS rods for reinforcement and centering, strutting, shuttering etc., complete.
Spl Plastering in CM 1:3 10mm thick including cost and conveyance of all materials and all labour and other incidental charges for curing etc., complete.
Supply of fabricating and placing in position Mild Steel/ Ribbed for steel grills for al RCC work as per design given including cost of steel and G.I.binding wire in all floorsetc., complete complying with standard specification etc., complete.
Emulsion with oil Painting with ready mixed approval colour paint two coat over including conveyance of all materials to work site and all labour charges etc., complete.
Towards charges for Scaffolding Charges including all Materials and all labour charges etc complete
Provision for Chlorinator
Provision for GI Pipe Repair
Repairs to Inner Ladder
Provision for Supply of of MS Ladder including charges etc complete
Repairs for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} 18% for other than Earth Quantity
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.59 MB
BOQ_807419.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid