Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.7 L+₹193.75 (0.05%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹3.7 L+₹623.94 (0.17%)Rejected-Finance 01 BALIA BALIA SAGARDIGHI MURSHIDABAD WEST BENGAL 742237 | MURSHIDABAD | WEST BENGAL | 742237 | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | JHARESWAR BERA L2 | DAS ENTERPRISE L3 | BERA ENTERPRISE L1 |
|---|---|---|---|---|---|---|
| 1.00 | Fine Sand | 27 | cum | 380.5 ₹10,273.5 | 380.55 ₹10,274.85 | 380 ₹10,260 Lowest |
| 2.00 | Hire charges of Shuttering plank (25mm-30mm thick) with Prop including all fittings | 52.5 | sqm | 219.5 ₹11,523.75 | 219.58 ₹11,527.95 | 219 ₹11,497.5 Lowest |
| 3.00 | Nail | 6 | kg | 78.5 ₹471 | 78.58 ₹471.48 | 78 ₹468 Lowest |
| 4.00 | Polythene sheet (150 gm per sqm) | 61.88 | kg | 108.5 ₹6,713.44 | 108.58 ₹6,718.39 | 108 ₹6,682.5 Lowest |
| 5.00 | Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper | 3 | Day | 1,498.5 ₹4,495.5 | 1,498.58 ₹4,495.74 | 1,498 ₹4,494 Lowest |
| 6.00 | Stone Aggregate(single size): 10 mm nominal size | 17.64 | cum | 1,632.5 ₹28,797.3 | 1,632.58 ₹28,798.71 | 1,632 ₹28,788.48 Lowest |
| 7.00 | Stone Aggregate(single size):20 mm nominal size | 35.91 | cum | 1,799.5 ₹64,620.05 | 1,799.58 ₹64,622.92 | 1,799 ₹64,602.09 Lowest |
| 8.00 | Portland Cement | 25.7 | tonne | 5,716.5 ₹1,46,936.92 | 5,716.58 ₹1,46,938.97 | 5,716 ₹1,46,924.06 Lowest |
| 9.00 | Carriage of Stone aggregate below 40 mm nominal size | 53.55 | cum | 563.5 ₹30,175.43 | 563.58 ₹30,179.71 | 563 ₹30,148.65 Lowest |
| 10.00 | Loading unloading & stacking Sand/ stone aggregate (less than 40mm nominal size) | 53.55 | cum | 75.5 ₹4,043.03 | 75.58 ₹4,047.31 | 75 ₹4,016.25 Lowest |
Tender Value
₹3.7 L
EMD Value
₹7,319
Closing Date
8 Sept 2026, 4:00 pmClosed
MOHANPUR GP
MOHANPUR GP
Construction of cement concrete road for community from Haranarayan Khatua house to Krishna Sau house at Singarui
2026_ZPHD_5020970_1
NIT E 20
Open Tender
CIVIL WORKS
Percentage
15 days
SINGARUI
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹7,319
Yes
22 Sept 2026
31 Aug 2026
10 Sept 2026
31 Aug 2026
8 Sept 2026
31 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Fine Sand | - | cum | - | - |
| 2 | Hire charges of Shuttering plank (25mm-30mm thick) with Prop including all fittings | - | sqm | - | - |
| 3 | Nail | - | kg | - | - |
| 4 | Polythene sheet (150 gm per sqm) | - | kg | - | - |
| 5 | Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper | - | Day | - | - |
| 6 | Stone Aggregate(single size): 10 mm nominal size | - | cum | - | - |
| 7 | Stone Aggregate(single size):20 mm nominal size | 1 | cum | - | - |
| 8 | Portland Cement | - | tonne | - | - |
| 9 | Carriage of Stone aggregate below 40 mm nominal size | 1 | cum | - | - |
| 10 | Loading unloading & stacking Sand/ stone aggregate (less than 40mm nominal size) | 1 | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
BOQ_5098153.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .