The project Director
The project Director DRDA,vellore
Renovation of 8 no of Ponds Ooranies,Kulam Kuttai in Vellore Block of Vellore District under Renovation of Rural Water Bodies SFC Grant 2019-20 Package no-32
2020_RDTN_158352_1
A9/3844/2020
Open Tender
Civil Works - Others
Item Wise
180 days
DRDA
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹45,500
11 Apr 2020
18 Feb 2020
13 Mar 2020
18 Feb 2020
13 Mar 2020
18 Feb 2020
Amount
1. Renovation to Joyar Kulam @ Senganvithi No 31 in Sadhuperi Panchayat
Clearing Juliflora Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Bathing ghats & baby pond
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete for 10 cum
Plastering with CM 1:4 20mm TK including cost and conveyance of all materials to work site and all labour charges etc.complete
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Colour washing two coats use approved colour pigments including cost and conveyance of all materials to work site and all labour charges etc.complete
2.Renovation of Thamarai Kulam @ Sadhuperi No 180 in Sadhuperi Panchayat
Clearing Juliflora Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Bathing ghats & baby pond
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete for 10 cum
Plastering with CM 1:4 20mm TK including cost and conveyance of all materials to work site and all labour charges etc.complete
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Colour washing two coats use approved colour pigments including cost and conveyance of all materials to work site and all labour charges etc.complete
3.Renovation of sembedu Kulam @ No 46 in Sembedu Panchayat
Clearing Juliflora Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Bathing ghats & baby pond
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete for 10 cum
Plastering with CM 1:4 20mm TK including cost and conveyance of all materials to work site and all labour charges etc.complete
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Colour washing two coats use approved colour pigments including cost and conveyance of all materials to work site and all labour charges etc.complete
4. Improvements to Thamarai Kulam @ No 45 in Sembedu Panchayat
Clearing Juliflora Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Bathing ghats & baby pond
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete for 10 cum
Plastering with CM 1:4 20mm TK including cost and conveyance of all materials to work site and all labour charges etc.complete
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Colour washing two coats use approved colour pigments including cost and conveyance of all materials to work site and all labour charges etc.complete
5. Improvements to Vettu Kulam @ Jamalpuram No 401 in Thellur Panchayat
Clearing Juliflora Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Bathing ghats & baby pond
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete for 10 cum
Plastering with CM 1:4 20mm TK including cost and conveyance of all materials to work site and all labour charges etc.complete
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Colour washing two coats use approved colour pigments including cost and conveyance of all materials to work site and all labour charges etc.complete
6. Improvements to Mariyamman Kulam @ Verareddy Palayam No 355 in Thellur Panchayat
Clearing Juliflora Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Bathing ghats & baby pond
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete for 10 cum
Plastering with CM 1:4 20mm TK including cost and conveyance of all materials to work site and all labour charges etc.complete
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Colour washing two coats use approved colour pigments including cost and conveyance of all materials to work site and all labour charges etc.complete
7. Improvements to Anai kuttai Kulam @ Ussur No 125 in Ussur Panchayat
Clearing Juliflora Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Bathing ghats & baby pond
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete for 10 cum
Plastering with CM 1:4 20mm TK including cost and conveyance of all materials to work site and all labour charges etc.complete
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Colour washing two coats use approved colour pigments including cost and conveyance of all materials to work site and all labour charges etc.complete
8. Improvements to Raja Kulam @ Ussur No 292 in Ussur Panchayat
Clearing Juliflora Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Bathing ghats & baby pond
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete for 10 cum
Plastering with CM 1:4 20mm TK including cost and conveyance of all materials to work site and all labour charges etc.complete
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Colour washing two coats use approved colour pigments including cost and conveyance of all materials to work site and all labour charges etc.complete
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
S A Srinivasan
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .