Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 CrAccepted-AOC 273001 | GORAKHPUR | UTTAR PRADESH | 273001 | ₹7.5 Cr | L1 | Accepted-AOC L1 ACCEPTED |
| 2 | L2₹7.7 Cr+₹20.2 L (2.68%)Rejected-Finance 0 | ₹7.7 Cr+₹20.2 L (2.68%) | L2 | Rejected-Finance REJECTED |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹8.1 Cr
EMD Value
₹16.2 L
Closing Date
8 Sept 2023, 12:00 pmClosed
S.E., VNS CIRCLE, PWD, VARANASI
S.E., VNS CIRCLE, PWD, VARANASI
CHITTUPUR TIKARI ITI MARG LENGTH 2520 METER BHU TRAMA CENTER SE SIRGATE TAK CHAINAGE 0000 SE 2520 METER TAK ME CHAURIKARAN AWAM SUDRIDHIKARAN KA KARYA
2023_CEUVZ_833945_1
6692/183com-vnscircle/23-24 dt 17.08.2023
Open Tender
Civil Works - Roads
Item Rate
180 days
VARANASI
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,590
₹16.2 L
Yes
S.E., VNS CIRCLE, PWD, VARANASI
27 Oct 2023
1 Sept 2023
8 Sept 2023
1 Sept 2023
8 Sept 2023
1 Sept 2023
1 Sept 2023
Amount
Excavation in foundation in ordinary soil (loamclay or sand) including lift up to 1.5m and lead up to 30m. and including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth ad directed by the Engineer in charge up to a distance of 30m. from the foundation trenches including all T&P phowarah and basket etc. complete. (Including cost of all material and Labour, all taxes and labour Cess etc but Excluding Cost of GST)
Removal of unserviceable soil including excavation loading and disposal upto out side municipal limit lead but exluding replacement by suitable soil which shall be paid seperately as per clause 305. (Including cost of all material and Labour, all taxes and labour Cess etc but Excluding Cost of GST)
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 (Including cost of all material and Labour, all taxes and labour Cess etc but Excluding Cost of GST)
Providing and laying over a cracked road surface, with crack width 6 to 9 mm after cleaning with a mechanical broom, using Bitumen VG-10 complying with clause 521, sprayed at the rate of 11 kg per 10 sqm and spreading 11.2 mm crushed stone aggregates @ 0.12 cum per 10 sqm, sweeping the surface for uniform spread of aggregates and surface finished to conform to clause 902. (Including cost of all material and Labour, all taxes and labour Cess etc but Excluding Cost of GST)
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.(Including cost of all material and Labour, all taxes and labour Cess etc but Excluding Cost of GST)
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing (Including cost of all material and Labour, all taxes and labour Cess etc but Excluding Cost of GST)
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.(Including cost of all material and Labour, all taxes and labour Cess etc but Excluding Cost of GST)
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Including cost of all material and Labour, all taxes and labour Cess etc but Excluding Cost of GST)
Providing and Laying of Rubber moulded ( Grey colour)Interlocking Concrete Block Pavements having thickness 80 mm including leveling and dressing of surface to required level and slope, spreading and moisting 30mm thick local sand on bed, filling joints with local sand on bed, filling joints with local sand etc. for proper completion of the work as per drawings and Technical Specification Clause 1504 (Including cost of all material and Labour, all taxes and labour Cess etc but Excluding Cost of GST)
Providing and Laying of Rubber moulded ( Red colour)Interlocking Concrete Block Pavements having thickness 80 mm including leveling and dressing of surface to required level and slope, spreading and moisting 30mm thick local sand on bed, filling joints with local sand on bed, filling joints with local sand etc. for proper completion of the work as per drawings and Technical Specification Clause 1504 (Including cost of all material and Labour, all taxes and labour Cess etc but Excluding Cost of GST)
Construction of K.C. Drain with present CC black size (370 x 250 mm) laid flate position (37.50 mm in length) and Kerb stone (30 cm in length) including cost of all material, labour, and T&P etc complete. (Including cost of all material and Labour, all taxes and labour Cess etc but Excluding Cost of GST)
M-150 brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work. SI no. 305b.(Including cost of all material and Labour, all taxes and labour Cess etc but Excluding Cost of GST)
Excavation in foundation in ordinary soil (loamclay or sand) including lift up to 1.5m and lead up to 30m. and including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth ad directed by the Engineer in charge up to a distance of 30m. from the foundation trenches including all T&P phowarah and basket etc. complete.(Including cost of all material and Labour, all taxes and labour Cess etc but Excluding Cost of GST)
Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8km from the site of work and including watering dressing etc. Rate to include cost of all materials, labour and T&P etc. required for proper completion of the work.. (Including cost of all material and Labour, all taxes and labour Cess etc but Excluding Cost of GST)
Concrete with 4cm. gauge approved stone ballast, approved coarse sand and cement in the proportion of 8:4:1 including supply of all materials labour and tools and plants etc. required for proper completion for the work. (Including cost of all material and Labour, all taxes and labour Cess etc but Excluding Cost of GST)
RCC Hume Pipes 600mm dia NP-3 inculidng collars/ spigot jointed with stiff mixture of cement in the proportion of 1:2 (1 cement : 2 find sand) including testing of joints. (Including cost of all material and Labour, all taxes and labour Cess etc but Excluding Cost of GST)
M-150 brick work in 1:3 cement and coarse sand mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work. (SI 306) (Including cost of all material and Labour, all taxes and labour Cess etc but Excluding Cost of GST)
Struck pointing with cement mortar consisting 1 part cement and 2 parts of sand of 1.25 fineness modulus including supply of all materials labour and T&P etc. required for proper completion of the work. (Including cost of all material and Labour, all taxes and labour Cess etc but Excluding Cost of GST)
R.C.C. work with cement approved coarse sand and 2cm Gauge approved stone ballast in the proportion of 1:2:4 in lintels of doors and windows, excluding its fixing and binding the same with 24B.W.G.G.I binding wire and including necessary centering and shuttering etc. and also including S/o all materials required for proper completion of the work. Binding wire to be supplied by the contractor free of cost.(Including cost of all material and Labour, all taxes and labour Cess etc but Excluding Cost of GST)
Mild steel or iron in plain work such as in reinforced concreted or reinforced brick work (when not included in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage. Bend hooks and authorized overlapping shall be measured. (Including cost of all material and Labour, all taxes and labour Cess etc but Excluding Cost of GST)
M/S RAJ CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .