| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Finance | +0.00% | ₹2.4 L | L1 | Admitted-Finance |
| 2 | L2₹2.4 LAdmitted-Finance | +1.00% | ₹2.4 L | L2 | Admitted-Finance |
| 3 | L3₹2.4 LAdmitted-Finance | +2.00% | ₹2.4 L | L3 | Admitted-Finance |
Tender Value
₹2.4 L
Closing Date
14 Mar 2026, 6:55 pmClosed
garmsevak/sarpanch
VP.Aawati Ta.Karmala
Co.of.UnderGroundPVC PipeGutterLAtMr.HaranBhurajitParadhiMrPopatkhatalHomeVillageAawatiTal.karmalalDist.SolapurWorLocation2ProvidingSupplyingminiWaterSupplyschemeatMrubhashGaikwadHometo MrNa
2026_SOLAP_1285072_1
E-Tendar-2025-26 Aawati TA.Karmala
Open Tender
Civil Works
90 days
E-TENDAR
Co.of.UnderGroundPVC PipeGutterLAtMr.HaranBhurajitParadhiMrPopatkhatalHomeVillageAawatiTal.karmalalDist.SolapurWorLocation2ProvidingSupplyingminiWaterSupplyschemeatMrubhashGaikwadHometo MrNa
2 documents required · 2 mandatory
₹100
Yes
25 Mar 2026
9 Mar 2026
16 Mar 2026
9 Mar 2026
14 Mar 2026
9 Mar 2026
Work Location 1 Item No. 1 :- Excavation for foundation / pipe trenches in earth soils of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 meters and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete (lift 0 to 1.5 M)
Item No. 2 :- Excavation for foundation / pipe trenches in hard murum including removing the excavated material up to a distance of 50M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.(lift 0 to 1.5M)
Item No. 3 :- Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material up to a distance of 50 meters and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete (lift upto 0 to 1.5 M)
Item No. 4 :- Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation 15cm to 20cm layers including watering and compaction complete.
Item No. 5 :- Providing and supplying in standard lengths ISI mark rigid unplastised PVC for potable water with rubber ring joints including cost of rubber ring as per IS-4985-1998, excluding GST levied by GOI and GOM in all respect, including transportation, freight charges, transit insurance, inspection charges, loading, unloading, conveyance to store and stacking the same in closed shed duly protected from sun rays and rains, etc. complete (with third party inspection) (socketed) 160 mm dia. PVC pipe 6 Kg/Sq.cm
Item No. 6 :- Lowering, pipes and laying and specials jointing of following class and diameter including cost of conveyance from stores to site of works including cost of all labour, material, except cement solvent, rubber ring, as per IS code, etc. complete (with cement solvent joint / ring fit joint). 160 mm dia. PVC pipe 6 Kg/Sq.cm
Item No. 7:- Valve Chamber with Precast RCC Covers Providing and constructing B.B. masonry valve chamber with 15 cm thick 1:3:6 proportion PCC bedding, excluding excavation,B.B.masonry in CM1:5 proportion precast RCC frame and cover, etc. complete as directed byEngineer-in-charge. As above of 60 x 45 cm internal size and depth upto 1.2
Item No. 8:- Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging etc. complete.
Work Location 2 Item No. 1 :- Excavation for foundation / pipe trenches in earth soils of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 meters and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete (lift 0 to 1.5 M)
Item No. 2 :- Excavation for foundation / pipe trenches in hard murum including removing the excavated material up to a distance of 50M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.(lift 0 to 1.5M)
Item No. 3 :- Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material up to a distance of 50 meters and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete (lift upto 0 to 1.5 M)
Item No. 4 :- Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation 15cm to 20cm layers including watering and compaction complete.
Item No. 5 :- Providing and supplying in standard lengths ISI mark rigid unplasticised PVC pipes suitable for potable water with solvent cement joints including cost of couplers, as per IS specification no.4985/1988 including all local and central taxes, transportation, freight charges, octroi, inspection charges, loading, unloading, conveyance to the departmental stores and including cost of jointing material i.e. solvent cement, etc. complete. 90 mm dia. PVC pipe 6 Kg/Sq.cm
Item No. 6 :-Lowering, laying and jointing PVC pipes and specials of following class and diameter including cost of conveyance from stores to site of works including cost of all labour, material, except cement solvent, giving satisfactory hydraulic testing as per IS code, etc. complete. 90 mm dia. PVC pipe 6 Kg/Sq.cm
Item No. 7 :- Providing, double flanged short body pattern type manually operated Butterfly Valve having body, disc and end cover in graded cast iron to IS-210 Gr.CF 200 generally confirming to IS-13095-1991, Synthetic rubber faced ring secured on disc by retaining ring with stainless steel screw stub shaft of stainless steel riding in teflon bearing including inspection charges, transportation up to departmental store, unloading, stacking excluding GST levied by GOI & GOM in all respect etc. excluding C.C. foundation /structural steel support.
Item No. 8 :- Lowering, laying and jointing in position following C.I.D/F Reflex valves, Butterfly valves and Sluice valves including cost of all labour jointing material, including nut bolts and giving satisfactory hydraulic testing etc. complete.(Rate for all class of valves.)
Item No. 9:- Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging etc. complete.
Add 18% GST
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.23 MB
BOQ_2210115.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid