Tender Value
₹1.7 Cr
EMD Value
₹3.3 L
Closing Date
21 Oct 2026, 3:15 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Deposit Work
DEN N
20 conditions · 3 needing a document upload
Financial Eligibility Criteria: The tenderer must haveminimumaverageannual contractual turnover of V/N or 'V' whichever isless; whereV=Advertised value of the tender in crores of Rupees N=Number ofyearsprescribed for completion of work for which bids havebeen invited.Theaverage annual contractual turnover shall be calculatedas anaverage of"total contractual payments" in the previous threefinancialyears, as perthe audited balance sheet. However, in casebalance sheetof theprevious year is yet to be prepared/ audited, theaudited balancesheetof the fourth previous year shall be considered forcalculatingaverageannual contractual turnover
The tenderers shall submit requisite information as perAnnexureVIB, along with copies of Audited Balance Sheets duly certifiedby the Chartered Accountant/ Certificate from CharteredAccountantdulysupported by Audited Balance Sheet
In case of newly formed partnership firm, the credentialsofindividualpartners from previous propriety firm(s) ordissolvedpreviouspartnership firm(s) or split previous partnership firm(s),shallbeconsidered only to the extent of their share in previous entity onthedateof dissolution / split and their share in newly formedpartnershipfirm. Forexample, a partner A had 30% share in previousentity and hisshare inpresent partnership firm is 20%. In the presenttenderunderconsideration, the credentials of partner A will be consideredtotheextent of 0.3*0.2*value of the work done in the previous entity.Forthispurpose, the tenderer shall submit along with his bid alltherelevantdocuments which include copy of previouspartnershipdeed(s),dissolution deed(s) and proof of surrender of PAN No.(s) in caseofdissolution of partnership firm(s) etc.
In case of existing partnership firm, if any one or more partnersquitthepartnership firm, the credentials of remaining partnership firmshallbere-worked out i.e., the quitting partner(s) shall take awayhiscredentialsto the extent of his share on the date of quittingthepartnership firm(e.g.in a partnership firm of partners A, B & 1.2.1 Chavingshare 30%, 30% & 40%respectively and credentials of Rs 10crore; incase partner C quits thefirm, the credentials of this partnershipfirm shallremain as Rs 6 crore).For this purpose, the tenderer shallsubmit alongwith his bid all therelevant documents which include copy ofpreviouspartnership deed(s),dissolution deed(s) and proof of surrenderof PANNo.(s) in case ofdissolution of partnership firm(s) etc
In case of existing partnership firm if any new partner(s) joinsthefirmwithout any modification in the name and PAN/TAN no. of thefirm,thecredentials of partnership firm shall get enhanced to theextentofcredentials of newly added partner(s) on the 1.2.2 sameprinciplesasmentioned in item 6 above. For this purpose, the tenderershallsubmitalong with his bid all the relevant documents which includecopyofprevious partnership deeds, dissolution/splitting deeds andproofofsurrender of PAN No.(s) in case of dissolution of partnership firmetc
Technical Eligibility Criteria: (a)The tenderer musthavesuccessfullycompleted or substantially completed any one ofthefollowing categoriesof work(s) during last 07 (seven) years, endinglastday of monthprevious to the one in which tender is invited: (i)Threesimilar works eachcosting not less than the amount equal to 30%ofadvertised value of thetender, or (ii)Two similar works each costingnotless than the amountequal to 40% of advertised value of the tender,or(iii)One similar workcosting not less than the amount equal to 60%ofadvertised value of thetender (b) (1)In case of tenders forcompositeworks(e.g. works involvingmore than one distinct component,such asCivil Engineering works, S&Tworks, Electrical works, OHE worksetc. andin the case of major bridgessubstructure, superstructure etc.),tenderermust have successfullycompleted or substantially completedany one ofthe following categoriesof work(s) during last 07 (seven)years, endinglast day of monthprevious to the one in which tender isinvited: (i)Threesimilar works eachcosting not less than the amount equalto 30% ofadvertised value ofeach component of tender, or (ii)Two similarworkseach costing not lessthan the amount equal to 40% of advertisedvalueof each component oftender, or (iii)One similar work each costingnotless than the amountequal to 60% of advertised value ofeachcomponent of tender. Note forb(1): Separate completed worksofminimum required values shall alsobe considered for fulfillmentoftechnical eligibility criteria for differentcomponents. (b)(2)In suchcases,what constitutes a component in acomposite work shall be clearlypredefined with estimated tender cost ofit, as part of the tenderdocumentswithout any ambiguity. (b) (3) Toevaluate the technicaleligibility oftenderer, only components of work asstipulated in tenderdocuments forevaluation of technical eligibility, shallbe considered. Thescope of workcovered in other remainingcomponents shall be eitherexecuted bytenderer himself if he has workexperience as mentioned inclause 7 ofthe Standard General Conditionsof Contractor throughsubcontractorfulfilling the requirements as perclause 7 of the StandardGeneralConditions of Contract or jointly i.e.,partly himself and remainingthroughsubcontractor, with prior approvalof Chief Engineer in writing.However,if required in tender documents byway of Special Conditions, aformalagreement duly notarised, legallyenforceable in the court of law,shall beexecuted by the main contractorwith the subcontractor forthecomponent(s) of work proposed to beexecuted by thesubcontractor(s),and shall be submitted along with theoffer forconsidering subletting ofthat scope of work towards fulfilmentof technicaleligibility. Suchsubcontractor must fulfill technical eligibilitycriteria asfollows: Thesubcontractor shall have successfully completedat least onework similarto work proposed for subcontract, costing notless than 35%value ofwork to be subletted, in last 5 years, ending lastday of monthprevious tothe one in which tender is invited through aworks contract.Note: forsubletting of work costing up to Rs 50 lakh, noprevious workexperienceof subcontractor shall be asked for by theRailway
Work experience certificate from private individual shallnotbeconsidered. However, in addition to work experiencecertificatesissuedby any Govt. Organisation, work experience certificateissued byPubliclisted company having average annual turnover of Rs 500croreandabove in last 3 financial years excluding the current financialyear,listedon National Stock Exchange or BombayStockExchange,incorporated/registered at least 5 years prior to the dateofclosing oftender, shall also be considered provided the workexperiencecertificatehas been issued by a person authorized by thePublic listedcompany toissue such certificates. In case tenderer submitsworkexperiencecertificate issued by public listed company, the tenderershallalso submitalong with work experience certificate, the relevant copyofwork order,bill of quantities, bill wise details of payment receiveddulycertified byChartered Accountant, TDS certificates for allpaymentsreceived andcopy of final/last bill paid by company in supportof aboveworkexperience certificate.
Para 1.2 & its sub para of standard financial criteria arealsoapplicableduring evaluation of technical credential of partnershipfirm.
Defination of Similar Work :- Similar work means any track worksbymanually or mechanical means involving deep screening or TSR orTRRor Casual renewals or TWR or Turn outs or dismantling of tracks etc
35 conditions · 8 needing a document upload
Tenderers should show discount in the rate scheduleonly,insteadof anywhere else in the offer. Discounts not shownatdesignatedplace will be summarily ignored for assigninginterse ranking ofoffers. Conditional discount will not beconsideredfor adjudgingthe inter-se position i.e. rate quotedwithout anyconditionsattached (viz. Discount/ Rebates havinglinkages toquantity,rates payment etc.) will only be consideredforevaluationpurpose. In other words, discounted rates linkedtoquantities,rates, prompt payment etc. will be ignoredfordetermining interse position. Railway, however reservestheright to use thediscounted rate/ rates considered workableandappropriate, forcounter offer to the successful tenderers
Tenderers will examine the various provisions ofTheCentralGoods and Services Tax Act,2017(CGST)/IntegratedGoods andServices Tax Act, 2017 (IGST)/ UnionTerritory GoodsandServices Tax Act, 2017(UTGST)/ respectivestate's StateGoodsand Services Tax Act (SGST) also, as notifiedbyCentral/StateGovt.& as amended from time to timeandapplicable taxesbefore bidding. Tenderers will ensure thatfullbenefit of InputTax Credit (ITC) likely to be availed by themisduly consideredwhile quoting rates.The successful tendererwhois liable to beregistered under CGST/IGST/UTGST/SGST Actshallsubmit GSTINalong with other details requiredunderCGST/IGST/UTGST/SGSTAct to railway immediately aftertheaward of contract, withoutwhich no payment shall bereleased tothe Contractor. TheContractor shall be responsible fordepositionof applicable GSTto the concerned authority. In casethesuccessful tenderer isnot liable to be registeredunderCGST/IGST/UTGST/ SGST Act,the railway shall deducttheapplicable GST from his/their billsunder reversechargemechanism (RCM) and deposit the sameto theconcernedauthority. Contractor shall be liable topay/refund theamountcollected as GST to the Indian Railwaysalong withinterest andpenalties, if any imposed by theauthorities, in caseGST inputtax credit of Indian Railways isdenied/rejected by thetaxauthorities due to reasons mentionedbelow but not limitedto: Wrong/incorrect invoices issued byContractor ; No- filing ofGSTreturns; Non payment of GSTcollected from Indian Railwaystothe authorities; Any other noncompliance done byContractor;Retention Money: Any paymentliable to be paid byIndianRailways to contractor against thegoods or services orbothsupplied by such contractor to IndianRailways shall be keptonhold in case supplier makes any noncompliance of any oftheGST law provisions including nonreporting of invoices inGSTreturns. Such payment shall bereleased after properverificationof records and availability ofITC to Indian Railways asperprovisions of GST Law. GeneralIndemnity: Contractorherebyagrees to indemnify and holdharmless the IndianRailways fromand against any and alllosses, including loss onaccount of InputTax Credit and alllosses incurred by the IndianRailways relatingto or arising outof or in connection with anyactual or threatenedclaim, legalaction, proceedings, prosecutionor inquiry by oragainst theIndian Railways arising out, directly orindirectly,offailure by thecontractor to comply with theprovisions of GSTand relatedlaws, or based upon or arising fromany failure bythe Contractor{After award of LOA it should beindemnifyotherwise action maybe taken by competent authorityand willbe binding uponcontractor).(ACS-6 dtd 21.12.2023). ( Click here to download Format)
The Bid Security shall be deposited either in cashthroughepayment gateway or submitted as Bank Guaranteebond fromascheduled commercial bank of India or as mentionedintenderdocuments. The Bank Guarantee bond shall be asperAnnexureVIA and shall be valid for a period of 90daysbeyondthe bidvalidity period. In case, submission of Bid Securityin theform ofBank Guarantee, following shall be ensured: (i).Ascannedcopyof the Bank Guarantee shall be uploaded oneProcurementPortal (IREPS) while applying to the tender.(ii).Theoriginal BankGuarantee should be delivered to ChiefOfficeSuperintendentRate before closing date for submission ofbidsi.e., excludingthe last date of submission of bids. (ACS-5dtd20.10.02023).(iii)Non submission of scanned copy ofBankGuarantee with thebid on etendering portal (IREPS) and/ornonsubmission oforiginal Bank Guarantee within the specifiedperiodshall lead tosummary rejection of bid. (iv) The TenderSecurityshall remainvalid for a period of 90 days beyond thevalidityperiod for theTender. (v) The details of the BG,physicallysubmitted shouldmatch with the details available inthe scannedcopy and thedata entered during bid submissiontime, failingwhich the bidwill be rejected (vi).The BankGuarantee shall beplaced in anenvelope, which shall be sealed.The envelope shallclearly bearthe identification "Bid for the *****Project" and shallclearlyindicate the name and address of theBidder. In addition,the BidDue Date should be indicated on theright hand topcorner of theenvelope. (vii)The envelope shall beaddressed tothe officer andaddress as mentioned in the tenderdocument.(viii).If theenvelope is not sealed and marked asinstructedabove, theRailway assumes no responsibility forthemisplacement orpremature opening of the contents of theBidsubmitted andconsequent losses, if any, suffered by theBidder
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tenderers are abiding by the General Conditions of Contract(GCC) April 2022 corrected upto ACS 11 & any statutorymodification thereof and also abide to carry out the workaccordingly.
Documentary proof - Tenderer should submit scanned copydocumentary proof in regard for fulfilling the Technical /financialeligibility criteria along-with their offer (for details refer attacheddocuments). If the tenderers do not submit any proof of meetingwith the eligibility criteria as laid down in the tender conditions,the offer shall be considered as incomplete and shall besummarily rejected. Documents submitted in support ofeligibility criteria after opening of tender will not be considered.
In terms of HQ's letter No. W.187.R.GCC dated 24.05.2019, "Ifany contract is terminated under clause 62 of GCC oncontractor's fault, then that contractor shall be temporarilydebarred from participation in any tender in that division forONE YEAR, If so decided by the Tender Accepting Authority. Incase creation of unsafe working due to infringement/entanglement of P.Way materials ( Rails, Sleeper, tec.) or/andtool & plants, deployed at worksites with running trains, apenalty of Rs. 1,00,000/- (Rs. One Lakh) shall be imposed perincident. In case of repeated such incidence, contract is liablefor termination as per contract conditions. (HQ's Lt. No. W.636.T.FBWP/Tender/2017 dtd. 12.10.2021). Further,Excavation and Earthwork in Railway Premises: While carryingout the excavation in the yard for executing any work allprecautions should be taken to avoid damages to cables pipelines etc and the damage cost will be borne by agency. In orderto avoid damage to the Signaling, Tele communication andElectrical cables, Telecom Circular No.17/2013 -"Procedure forundertaking digging work in the vicinity of signaling, electricaland telecommunication cables" issued vide letter no.2003/Tele/RCIL/1 Pt.IX dated 24.06.2013 has to be followed. 9."No Land belonging to or in the possession of the Railway shall beoccupied by the contractor without the permission of theRailway. The contractor shall not use or allow to be used the sitefor any purpose other than that of executing the works. Whenever non-railway bodies/persons are permitted to userailway premises with competent authority's approval,conservancy charges as applicable from time to time may belevied." (Vide HQ Lt No. W.187.RA/Special condition/IIdt.06.01.2025).
In terms of HQ's letter No. W.187.R.GCC dated 24.05.2019,"Ifanycontract is terminated under clause 62 of GCConcontractor'sfault, then that contractor shall betemporarilydebarred fromparticipation in any tender in thatdivision forONE YEAR, If sodecided by the Tender AcceptingAuthority. Incase creation ofunsafe working due toinfringement/entanglement of P.Waymaterials ( Rails, Sleeper,tec.) or/andtool & plants, deployed atworksites with runningtrains, apenalty of Rs. 1,00,000/- (Rs. OneLakh) shall beimposed perincident. In case of repeated suchincidence,contract is liablefor termination as per contractconditions. (HQ'sLt. No. W.636.T.FBWP/Tender/2017 dtd.12.10.2021).Further,Excavation and Earthwork in RailwayPremises: Whilecarryingout the excavation in the yard forexecuting any workallprecautions should be taken to avoiddamages to cablespipelines etc and the damage cost will beborne by agency. Inorderto avoid damage to the Signaling, TelecommunicationandElectrical cables, Telecom CircularNo.17/2013 -"Procedureforundertaking digging work in thevicinity of signaling,electricaland telecommunication cables"issued vide letterno.2003/Tele/RCIL/1 Pt.IX dated 24.06.2013has to be followed
As per the recommendations by the 47th GST CouncilMeetinginrelation to changes in Tax rates, circulated byRailwayBoardvide L.No.2017/ACII/1/6/GST/Main/Vol.-III, dated 05-07-2022, theGST rates on Railway works contract has beenrevisedfromexisting 12% to 18%. The clarification mentioned intheRailwayBoard's letter is attached in tenderdocument.Therefore,Bidders are requested to quote their ratesincluding18% GST.'
Spl Eligibility Condition, Scope of Work,Specialconditionsattached to GCC
In terms of HQ's letter No. W.187.R.GCC dated 24.05.2019,"Ifanycontract is terminated under clause 62 of GCC on contractor'sfault, then that contractor shall be temporarily debarred fromparticipation in any tender in that division for ONE YEAR, If sodecided by the Tender Accepting Authority
In case creation of unsafe working dueto infringement/entanglement of P. Way materials ( Rails,Sleeper, etc.) or/and tool & plants, deployed at worksites withrunning trains, a penalty of Rs. 1,00,000/- (Rs. One Lakh) shallbe imposed per incident. In case of repeated suchincidence, contract is liable for termination as per contractconditions. (HQ'sLt. No. W.636.T.FBWP/Tender/2017 dtd.12.10.2021)
Tenderers are requested to go through the SpecialConditions for Letter of Credit.
The tender Document of the subjected work is inconformity with Indian Railways Standard General Conditions ofContract - April2022 with latest correction slip No 1 of dated14.07.2022, the perspective Tenderers are requested to gothrough the Tender Document before offering their offers
Annexure-V(A) shall be submitted by each memberof a partnership Firm/Joint Venture (JV)/HinduUndivided Family (HUF)/ Limited Liability Partnership (LLP) etc, asthe case may be. Non submission of the certificate/Affidavit, orsubmission of certificate/Affidavit either not properly filled in, orin a form at other than the prescribed format shall leadto summarily rejection of your offer
Applicability of Price Variation Clause (PVC)depends on fulfillment of condition of Para 46.A1 of IndianRailways Standard General Conditions of Contract April 2022-partII corrected up to ACS 1.
Documentary proof - Tenderer should submitscanned copy documentary proof in regard for fulfilling theTechnical/financial eligibility criteria along-with their offer (fordetails refer attached documents). If the tenderers do not submitany proof of meeting with the eligibility criteria as laid down inthe tender conditions, the offer shall be considered as incompleteand shall be summarily rejected. Documents submitted insupport of eligibility criteria after opening of tender will notbe considered
Tenderer should quote their offer with all inclusive rates
The all documents submitted should not be corrupted, ifat the time of tender opening. The document submitted arenot opened being corrupted, offer shall be summarily rejected
Completion period of this tender work is 12 months
Miscellaneous P.Way Works under SSE (P.Way) DEHR MILITARY SIDING (IRUSSOR- 2021)
DRM-W-PA-E-Tend-2026-N-21~CR
DRM-W-PA-E-Tend-2026-N-21
Open
Works - General
12 Months
Pune, Maharashtra
₹0
₹3.3 L
25 Sept 2026
25 Sept 2026
7 Oct 2026
72 items across 8 schedules · ₹1,66,34,171.2 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| positioning of rails accurately on cess supporting rails, providing required squaring at ends for renewal as directed by Engineer in-charge. | — | — | — | — | |
| 1 | long rail panel | RM | 8000.00 | 9.51 | 76,080 |
| 2 | m long rail panel | RM | 4000.00 | 15.04 | 60,160 |
| and removing rail of all section & track, laid on any type & density of removing fish plates, fastenings & other materials including stacking materials within an average 500 metres as directed by Engineer Note: 1.Cutting of rails shall be paid 2.Work to be done under traffic | — | — | — | — | |
| 3 | Rail Renewal work | TRM | 5000.00 | 46.67 | 2,33,350 |
| rails of all types & length in track, type & density of sleeper to the gauge under traffic block. Rates fastening of rail with sleepers with of fastenings and fixing of fish bolts or, if required, providing gap for stacking of released material infringement within 250m as directed Engineer-in-Charge. Note: Rail drilling and paid separately. | — | — | — | — | |
| 4 | Rail Renewal work | TRM | 8300.00 | 48.12 | 3,99,396 |
| Sleeper Renewal (TSR) with PSC involving removal existing sleepers of with fittings from track, insertion lying along the cess / formation / within 5 metres height with all specified spacing, gauge and one round of through packing to fit for 20 kmph speed, dressing of standard profile, all in accordance with provisions of IRPWM and stacking of material neatly at specified places average lead of 100 m as directed by in-charge. | — | — | — | — | |
| 5 | work not involving deep | Each | 2500.00 | 354.19 | 8,85,475 |
| of any type of sleepers in track sleepers lying on cess or at Bridge for casual renewal at isolated all fittings complete to specified cross level with contractor's tools packing and dressing of ballast, as Engineer in-charge. Released shall be neatly stacked and handed location within an average lead or near either side of Bridge as directed. | — | — | — | — | |
| 6 | other than Ballasted Deck Bridge | Each | 1500.00 | 492.23 | 7,38,345 |
| 7 | Fitting Renewal (TFR) on PSC track, of renewal of Grooved Rubber Pads, ERCs without damaging PSC Scope includes removal of all fittings, rail seat, rail flange at liner seats, Inserts with wire brushes and Grease Graphite Grade "O" (IS:408) to and central leg of ERC with grease of Railway's specification, fittings in correct position and sealing with grease all complete including stacking of released materials at locations within SSE Jurisdiction as Engineer-in-Charge. Note: All the be supplied at SSE/Stores/Depot. | Sleeper | 5000.00 | 23.7 | 1,18,500 |
| 8 | replacement of Grooved Rubber Sole on PSC sleepers duly removing the liners and replacing the GRSP by just rail after cleaning the rail seat, liner and ERC after greasing of and Liner contact area including Contractor's Grease Graphite Grade duly cleaning of rust/scale of ERC, liners & SGCI insert by using wire scrapper/sand emery paper etc., with all labour, tools, plants including stacking of released materials at locations within SSE Jurisdiction and by Engineer-in-Charge. Note: GRSP at SSE/stores/depot. | Sleeper | 3500.00 | 21.11 | 73,885 |
| of fish plated rail joints under traffic, Grease Graphite Grade 'O' (IS:408) and supplied by contractor, for all types of as per procedure laid down in latest IRPWM and as directed by Engineer In Release U/S bolt & nuts is to be back. If any fish bolts is jammed it cut with chisel and hammer and fresh fish bolt supplied. | — | — | — | — | |
| 9 | long fishplates | Joint | 3000.00 | 105.45 | 3,16,350 |
| 10 | of Elastic Rail Clips on PSC sleepers prescribed in latest edition of Railway's grease. | ERC | 20000.00 | 2.32 | 46,400 |
| Schedule total | ₹29,47,941 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC with special conditions
ATTACHMENT
AnneVA.pdf
ATTACHMENT
Annexure_VIBNew.pdf
ATTACHMENT
ListofplantMachinary.pdf
ATTACHMENT
CHECKLIST.pdf
ATTACHMENT
Tenderform1stsheetnew.pdf
ATTACHMENT
ASC1-11.pdf
ATTACHMENT
ACS-12..pdf
ATTACHMENT
11zon_Trackcondition.pdf
ATTACHMENT
GCC-MiscPwayDEHRSidingnew.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .