Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Finance | -0.50% | ₹2.2 L | L1 | Admitted-Finance |
| 2 | L2₹2.2 L+₹1,097.53 (0.49%)Admitted-Finance | -0.01% | ₹2.2 L+₹1,097.53 (0.49%) | L2 | Admitted-Finance |
| 3 | L3₹2.3 L+₹3,359.80 (1.51%)Admitted-Finance | +1.00% | ₹2.3 L+₹3,359.80 (1.51%) | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹4,480
Closing Date
1 Jul 2026, 9:00 amClosed
EE
S/O
Laying of 300 mm dia Sewer Line 35 Mtr with constuction of 3 M.H from H.No.131/363 to 131/365 in begam Purwa, Ward-102, Kanpur.
2026_DOLBU_1162745_32
JalKal / 1060 / EE Zone 3 /
Open Tender
Miscellaneous Works
Percentage
30 days
Jal Kal Vibhag Kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Jal Kal Vibhag
₹4,480
21 Sept 2026
26 Jun 2026
1 Jul 2026
26 Jun 2026
1 Jul 2026
26 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of C.C Road & its stacking with old matterial including supply of labour 'T&P, etc all complete as directed by site I/C. (As per vibhgiy rate). (A) For Swer Line 300 mm dia. (B) For M.H. | 44.72 | sqm | 404.1 | ₹18,071.35 |
| 2 | Excavation of Foundation in Ordinary soil including Lift Up to 1.50 Mtr With Supply of lab,T&P etc all comp. (A) For Swer Line 300 mm dia. (B) For M.H. | 102.08 | sqm | 291.89 | ₹29,796.13 |
| 3 | Concrete work With 20 Gauge Bricks Blast, L.Sand & Cement in foundation Under floor s in Prop. of 10:5:1 includ- ing Supply Lab, Mat, T&Petc all Comp. (A) For Swer Line 300 mm dia. (B) For M.H. | 4.82 | Cum | 4,747.35 | ₹22,882.23 |
| 4 | Making Necessary Arrangement of Barricating With Sal ballies, Red Flag, Lab, T&P etc all Comp. (A) for S.L. (B) For M.H. | 50 | Rmt | 200 | ₹10,000 |
| 5 | 1st Class Brick Work with 1:3 Cement & Coarse Sand mortar & including Supply of lab, Mat, T&P etc all Comp. | 8.88 | sqm | 7,200 | ₹63,936 |
| 6 | 12 mm thick plaster with 1:3 cement & L.Sand mortor with Supply of lab, Mat ,T&P etc all comp. | 32.4 | sqm | 237.17 | ₹7,684.31 |
| 7 | Providing Bier to Retain Sewage water etc all Comp. | 6 | cum | 450 | ₹2,700 |
| 8 | RCC Work with Cement, C.Sand & 20 mm Gauge appd.stone ballast in Prop. Of 1:1.5:3 in Slab including Supply of Lab, Mat, T&P etc all comp. | 1.08 | cum | 1,280 | ₹1,382.4 |
| 9 | Mild steel or Iron Work in Slab. | 0.85 | Qtl | 5,500 | ₹4,675 |
| 10 | Bailing out of water with 5 H.P. Diesel Pump including all accessories Such as Suction & Non skilled Lab.Including Supply of Lab, T&P all Comp. | 5 | days | 470 | ₹2,350 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.31 MB
22.pdf
Tender Documents • 1.56 MB
BOQ_2182736.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .