Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-3₹15.0 LAccepted-AOC A R AND M O ON VARIOUS ROAD IN SECTION NALAGARH 1 UNDER NALAGARH SUB DIVISION SH HIRING OF JCB | L-3 | Accepted-AOC work complete | |
| 2 | L-2₹16.8 LRejected-Finance | L-2 | Rejected-Finance L-2 | |
| 3 | L-3₹19.5 LRejected-Finance VPO TEH BHARMOUR DISTT CHAMBA HP | CHAMBA | HIMACHAL PRADESH | 176207 | L-3 | Rejected-Finance L-3 |
| Sl No | Description | Qty | Unit | karnail singh L3 | Manoj Kumar L1 | suman kumar thakur L2 |
|---|---|---|---|---|---|---|
| 1.00 | PExcavation in hilly area in all heights and depths and in all kind of soil by mechanical means including saturated soil comprising of ordinary soil, soft rock, hard rock, chiseling, wedging out of rock (where blasting is prohibited) and their intermediate classification of soil, setting out true to the required lines, grades, cutting and trimming of side slopes and level as shown in the drawing and as directed by engineer-in-charge at site according to the MORD technical specification clause 302, 304 and 1603 and sorting out useful materials and stacking the same in all leads, lifts in acquired width of road and transportation of useful material for filling in road ways, camber, embankments for grade improvements and disposal of all surplus material to required width of the road or on approveddumping sites through all modes of transportation including head load or animal transport or mechanical means along with its leveling, fine dressing and carriage of machineries, materials, tools, equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour if required. Recovery of stone to the tune of 850/- cubic metres quantity at the rate of 300/-(Rupees Three hundred) per cubic metre shall be effected from the contractor's running bills on pro-rata basis as per actual quantity executed. Any loss to the public, private property during the course of execution shall be the absolute responsibility of the contractor, which shall have to be compensated by him in all cases including carriage of matereials within all leads, lifts and other incidentals The rate including octroi, royality, Malkana, toll tax, GST or other taxes imposed by the Government. | 6,611.91 | cubic | 294.8 ₹19,49,191.07 | 227.57 ₹15,04,672.36 Lowest | 254 ₹16,79,425.14 |
Tender Value
Refer Docs
EMD Value
₹42,991
Closing Date
3 Aug 2023, 5:00 pmClosed
Executive Engineer Bharmour Division HPPWD Bhamro
Executive Engineer Bharmour Division HPPWD Bhamrour
C/O approach road to ITI Dadima Km 0/00 to 0/600 SH F/C at RD 0/000 to 0/600
2023_PWD_76627_1
3486-3507 dt. 14.7.2023
Open Tender
Civil Works - Roads
Item Rate
Bharmour
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
Yes
EE Dodrakawar
₹42,991
Yes
29 Nov 2025
22 Jul 2023
3 Aug 2023
22 Jul 2023
3 Aug 2023
22 Jul 2023
Amount
PExcavation in hilly area in all heights and depths and in all kind of soil by mechanical means including saturated soil comprising of ordinary soil, soft rock, hard rock, chiseling, wedging out of rock (where blasting is prohibited) and their intermediate classification of soil, setting out true to the required lines, grades, cutting and trimming of side slopes and level as shown in the drawing and as directed by engineer-in-charge at site according to the MORD technical specification clause 302, 304 and 1603 and sorting out useful materials and stacking the same in all leads, lifts in acquired width of road and transportation of useful material for filling in road ways, camber, embankments for grade improvements and disposal of all surplus material to required width of the road or on approveddumping sites through all modes of transportation including head load or animal transport or mechanical means along with its leveling, fine dressing and carriage of machineries, materials, tools, equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour if required. Recovery of stone to the tune of 850/- cubic metres quantity at the rate of 300/-(Rupees Three hundred) per cubic metre shall be effected from the contractor's running bills on pro-rata basis as per actual quantity executed. Any loss to the public, private property during the course of execution shall be the absolute responsibility of the contractor, which shall have to be compensated by him in all cases including carriage of matereials within all leads, lifts and other incidentals The rate including octroi, royality, Malkana, toll tax, GST or other taxes imposed by the Government.
suman kumar thakur
karnail singh
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .