Tender Value
₹19.0 L
EMD Value
₹14,500
Closing Date
31 Aug 2026, 5:30 pm
MR SE DURG 2 TAMAL LAL BHARTI(DFLT)
CE,DURG
CONSTRUCTION OF APPROACH ROAD FOR NEWLY CONSTRUCTED COLLEGE BUILDING AT RANI TARAI, BLOCK-PATAN
197282
NIT NO. 273/DURG(Durg)/2026
RESTRICTED TENDER
WORKS
PERCENTAGE
CE
Required Past Technical Experience: AS PER NIT
Required Financial Turnover (in INR): AS PER NIT
Required Bid Capacity (in INR): AS PER NIT
5 documents required · 5 mandatory
Public Works Department (PWD)
WORKS
MR SE DURG 2 TAMAL LAL BHARTI(DFLT)
RESTRICTED TENDER
PERCENTAGE
A B C D
CE,DURG
DURG,CIRCLE
DIVISION DURG
120
No
1
159491000
13102020
197282
31 Aug, 2026 5:30:00 PM IST
3 Sep, 2026 11:00:00 AM IST
13 Aug, 2026 5:00:00 PM IST
05082026
NIT NO. 273/DURG(Durg)/2026
CONSTRUCTION OF APPROACH ROAD FOR NEWLY CONSTRUCTED COLLEGE BUILDING AT RANI TARAI, BLOCK-PATAN
14500.00 INR
RTGS/CHALLAN (ONLINE) Internet Banking (ONLINE)
1903000.00
2
2 Sep, 2026 5:30:00 PM IST
1903000
AS PER NIT
AS PER NIT
AS PER NIT
0.00 INR
03
18d 2h 45m
W17471
5 documents required · 5 mandatory
₹0
₹14,500
13 Aug 2026
13 Aug 2026
3 Sept 2026
13 Aug 2026
2 Sept 2026
NIT SCHEDULE FOR CONSTRUCTION OF APPROACH ROAD FOR NEWLY CONSTRUCTED COLLEGE BUILDING AT RANI TARAI, BLOCK-PATAN, DISTT. DURG
P.A.C. Rs. = 19.03 LAKHS
S. No. Chap- ter No. Item No. Sub Item No. Item of Works Qty. Unit Rate Amount
1 3 2 Excavation in Soil (by Mechanical Means.) Excavation for roadway in soil using mechanical means including loading in tipper for carrying of cut earth to embankment site and unloading with all leads & lifts as per relevant clauses of section 300. 121.28 Cum 103.00 1249100
2 3 12 Construction of embankment with Material Obtained from Borrow Pits/Borrow Area (Construction of embankment with approved material/selected soil having C.B.R. > 5 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. 284.94 Cum 238.00 6781600
3 4 11 B Construction of Shoulders (Construction of shoulders as per clause 408 with selected soil from borrow pits / borrow areas having CBR not less than 12 and shall have L.L. and P.I. not more than 25% and 6% respectively, inclusive of all leads and lifts, including clearing and scrapping of existing surface, providing required cross fall, compacting. watering, rolling etc.complete. B) With Smooth wheeled roller 52.79 Cum 313.00 1652200
4 4 2 A Granular Sub-base as per Table:- 400-1 Construction of granular sub-base by providing graded Material, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface watering, rolling and compacting with vibratory power roller at OMC to achieve the desired density, complete as per clause 401. A) Plant mix method (with Mechanically crushed stone only) (a) For Lower Sub-base with (i) Grading- III Material 186.39 Cum 1494.00 27846600
5 6 1 Dry Lean Cement Concrete Sub- base Construction of dry lean cement concrete Sub-base as per IRC:SP-49 over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 26.5 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing as per clause 601. 124.26 Cum 2562.00 31835300
6 6 4 Providing and laying Un-reinforced Cement Concrete without Dowel bars including formwork and expansion, contraction & longitudinal joints as per design and as per IRC-62, over a prepared base a per approved mix design and finising to lines and grade as per Drawing for Pavement thickness less than 200mm in Low Volume Roads. With Cement concrete grade M 30 and minimum cement content @ 375 kg/cum 248.52 Cum 4748.00 117996900
7 9 8 Plain cement concrete complete as per drawing and Technical Specifications (i) PCC Grade M 15 1.20 Cum 3815.00 457800
8 9 4 Providing and laying Reinforced Cement Concrete pipe NP 3 / prestressed concrete pipe on first class bedding Laying Reinforced cement concrete pipe NP3 /prestressed concrete pipe complying to IS:458, with ends casted as per the requirements of flush jointing of pipes for culverts on first class bedding of granular material including joints duely filled and finished with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets. 10.00 Cum 2440.00 2440000
Say Rs. :- 19.03 Lakhs
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 1.15 MB
2156391518257543265_197282_Affidavit.docx
NIT • 0.01 MB
4263846095492993324_197282_BID-CAPACITY-2.docx
NIT • 0.03 MB
6509547849533923925_197282_English notice Less than 1 Crore.docx
NIT • 0.03 MB
1624799751435739951_197282_Guidelines_to_Bidders_EPS_v1.pdf
NIT • 0.13 MB
4652693508267693918_197282_Latest A_ 2.doc
NIT • 0.16 MB
6758648952683782076_197282_Latest NIT APPENDIX 2.doc
NIT • 0.32 MB
1786612543732164649_197282_Nit Approach road (1).xlsx
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].