Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Fee/PreQual/Technical/Finance | -0.10% | ₹2.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.9 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹2.9 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹2.9 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹2.9 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.9 L
EMD Value
₹3,000
Closing Date
27 Jul 2026, 6:00 pmClosed
Executive Engineering UPSIC KANPUR
Executive Engineering UPSIC KANPUR
Nanarao Park me Bandhara esthal Ka nirman karya
2026_MSME_1170267_4
737/EE4/26-27
Open Tender
Civil Works
Percentage
90 days
KANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Executive Engineering UPSIC KANPUR
₹3,000
4 Aug 2026
17 Jul 2026
28 Jul 2026
17 Jul 2026
27 Jul 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 metre and lead upto 30 Mtr. Including filling watering and ramming of excavated earth into the trenches of into the space between the building and the sides of foundation trenches or into the plinth and removal & disposal of surplus earth as directed by the Engineer incharge upto a distance of 30m from the foundation trenches.DSR 2.6.1 | 2.21 | cumt | 136.56 | ₹301.8 |
| 2 | 1:4:8 (1 cement :4 coarse sand : 8 graded brick aggregate 40 mm nominal size.dsr 4.1.8 | 2.36 | cumt | 5,240.78 | ₹12,368.24 |
| 3 | Centering and Shuttering …......... Complete item | 4 | sqm | 739.57 | ₹2,958.28 |
| 4 | RCC 1:1.5:3 ….. Complete item | 0.4 | cumt | 8,349.67 | ₹3,339.87 |
| 5 | Laying of C.C 1:1.5:3…............ Complete item | 2.39 | cum | 7,199.8 | ₹17,207.52 |
| 6 | Brick work with common burnt clay (Non Modular) Bricks of class-150 in foundation and plinth in: cement mortar 1:6 S.I NO 6.1.2 | 2.2 | cum | 5,487.17 | ₹12,071.77 |
| 7 | MS Tor Steel or Plain Work ….. Complete item | 0.31 | qtl | 8,297.39 | ₹2,572.19 |
| 8 | Brick work with common burnt clay (Non Modular) Bricks of class-150 in foundation and plinth in: cement mortar 1:4 | 4.39 | cum | 7,189.04 | ₹31,559.89 |
| 9 | 12 mm plaster of mix 1:4 (coarse sand) PWD S.I NO13.1.1 | 31.73 | sqm | 267 | ₹8,471.91 |
| 10 | Finishing Walls with putty approved brand and manfacture and of required shade on undacorated wall surface to give even shade over including curing and cost of all material labour T&P etc.required for proper completion of work DSR 13.8 | 31.74 | sqm | 120.06 | ₹3,810.7 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
BOQ_2195914.xls
BOQ • 0.28 MB
TermsandConditionTenderCivilWorks.pdf
Tender Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].