Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50.1 LAccepted-AOC 37 A KAMLA NAGAR COLLECTOR GANJ FATEHPUR FATEHPUR UTTAR PRADESH 212601 | FATEHPUR | UTTAR PRADESH | 212601 | L1 | Accepted-AOC Lowest Quoted Amount | |
| 2 | L2₹51.7 L+₹1.5 L (3.08%)Rejected-Finance PLOT NO 24 NEW AZAD NAGAR KANPUR NAGAR | L2 | Rejected-Finance Not Lowest Quoted Amount | |
| 3 | Rejected-Technical | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | M/S K M CONSTRUCTION L1 | M/S Usha Builders L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling brick and cc work in lime or cement morter including stacking of material as directed by engineer in charge within ditance of 60 mete (Brick work) | 33.02 | cum | 425.25 ₹14,041.76 Lowest | 438.75 ₹14,487.53 |
| 2.00 | Dismantling brick and cc work in lime or cement morter including stacking of material as directed by engineer in charge within ditance of 60 mete(CC work) | 4.86 | cum | 850.5 ₹4,133.43 Lowest | 877.5 ₹4,264.65 |
| 3.00 | Laying soiling coat with brick ballast consolidation by hand ramming including opening out stacts sorting in ballast in to size including carriage of material 30 meter and cariage of water 200 m. including all T & P required for proper completion of work | 16.52 | cum | 344.93 ₹5,698.24 Lowest | 355.88 ₹5,879.14 |
| 4.00 | Execavation of foundation including in all type of soil including lift up to 1.5m. And lead up to 30m. Including, filling watering ramming of excaveted of earth in to the space and side of the foundation of trenches as directed by engineer in charge up to distance of 30 m. | 594.37 | cum | 94.5 ₹56,167.97 Lowest | 98 ₹58,248.26 |
| 5.00 | Laying C.C 1:3:6 in foundation with 20 to 40 mm size stone ballast inculiding 3m. Lift and lead up to 60m.with cost of all material labour and T&P etc. | 178.09 | cum | 5,472.76 ₹9,74,643.83 Lowest | 5,645.58 ₹10,05,421.34 |
| 6.00 | M-150 class brick work in 1:4 cement and coarse sand Mortar including cost of all material labour T&P etc. | 158.27 | cum | 5,388.5 ₹8,52,837.9 Lowest | 5,558.66 ₹8,79,769.12 |
| 7.00 | Centering & shuttering for RCC work including cost of material labour and T&P etc | 84.28 | sqm | 798 ₹67,255.44 Lowest | 823.2 ₹69,379.3 |
| 8.00 | Centering & shuttering for CC work including cost of material labour and T&P etc | 638.8 | sqm | 401.63 ₹2,56,561.24 Lowest | 414.38 ₹2,64,705.94 |
| 9.00 | Cutting, bending, binding & placing of reinforcement including cost of steel, labour & T&P etc complete | 1.63 | M.T. | 63,369.29 ₹1,03,291.94 Lowest | 65,381.01 ₹1,06,571.05 |
| 10.00 | R.C.C. work 1:1.5:3 with 10-20 mm size stone grit incl. all cost of labour, material & T&P etc but execluding cost of rainforcement centring and shuttring | 41.2 | cum | 6,992.06 ₹2,88,072.87 Lowest | 7,214.03 ₹2,97,218.04 |
Tender Value
₹53 L
EMD Value
₹1.1 L
Closing Date
22 Aug 2026, 5:00 pmClosed
S. E. I.W.C. Kanpur
Office of the S.E. IWC 98 Canal Colony Kanpur
Reconstruction/rehabilitation of concrete structures of Nevaji Minor and Sarkandi Minor originating from it.
2026_UPIDC_1146813_14
06/SE/2026-27
Open Tender
Civil Works
Item Rate
365 days
Fatehpur
Technical Bid
2 documents required · 2 mandatory
₹2,720
₹1.1 L
9 Oct 2026
17 Aug 2026
22 Aug 2026
17 Aug 2026
22 Aug 2026
17 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick and cc work in lime or cement morter including stacking of material as directed by engineer in charge within ditance of 60 mete (Brick work) | 33.02 | cum | - | - |
| 2 | Dismantling brick and cc work in lime or cement morter including stacking of material as directed by engineer in charge within ditance of 60 mete(CC work) | 4.86 | cum | - | - |
| 3 | Laying soiling coat with brick ballast consolidation by hand ramming including opening out stacts sorting in ballast in to size including carriage of material 30 meter and cariage of water 200 m. including all T & P required for proper completion of work | 16.52 | cum | - | - |
| 4 | Execavation of foundation including in all type of soil including lift up to 1.5m. And lead up to 30m. Including, filling watering ramming of excaveted of earth in to the space and side of the foundation of trenches as directed by engineer in charge up to distance of 30 m. | 594.37 | cum | - | - |
| 5 | Laying C.C 1:3:6 in foundation with 20 to 40 mm size stone ballast inculiding 3m. Lift and lead up to 60m.with cost of all material labour and T&P etc. | 178.09 | cum | - | - |
| 6 | M-150 class brick work in 1:4 cement and coarse sand Mortar including cost of all material labour T&P etc. | 158.27 | cum | - | - |
| 7 | Centering & shuttering for RCC work including cost of material labour and T&P etc | 84.28 | sqm | - | - |
| 8 | Centering & shuttering for CC work including cost of material labour and T&P etc | 638.8 | sqm | - | - |
| 9 | Cutting, bending, binding & placing of reinforcement including cost of steel, labour & T&P etc complete | 1.63 | M.T. | - | - |
| 10 | R.C.C. work 1:1.5:3 with 10-20 mm size stone grit incl. all cost of labour, material & T&P etc but execluding cost of rainforcement centring and shuttring | 41.2 | cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.05 MB
TenderDocumentLot02.pdf
Tender Documents • 1.72 MB
BOQ_2212837.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .