| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹65.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹69.1 L+₹3.8 L (5.85%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | K MAHADEVAN L1 | E.SEKAR L2 |
|---|---|---|---|---|---|
| 1.00Strengthening of Rajiv Gandhi Nagar Road Km 0/0 to 0/850 (R-437) in Nandambakkam Panchayat in Kundrathur Block Estimate Amount Rs.66.28 Lakh | |||||
| 2.00 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401 | 478.13 | Cum | 2,430 ₹11,61,855.9 Lowest | 2,600 ₹12,43,138 |
| 3.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5 | 557.81 | Cum | 2,520 ₹14,05,681.2 Lowest | 2,700 ₹15,06,087 |
| 4.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 3,187.5 | Sqm | 85 ₹2,70,937.5 Lowest | 100 ₹3,18,750 |
| 5.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 3,187.5 | Sqm | 20 ₹63,750 Lowest | 25 ₹79,687.5 |
| 6.00 | Bituminous Macadam (Grade-II) 50mm Thick Using VG30
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 34.04 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 | 159.38 | Cum | 8,940 ₹14,24,857.2 Lowest | 9,100 ₹14,50,358 |
| 7.00 | BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as
per specification using CMP as per clause 507 of MORTH Rev-5 | 79.69 | Cum | 11,475 ₹9,14,442.75 Lowest | 12,000 ₹9,56,280 |
| 8.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 114.75 | Cum | 610 ₹69,997.5 Lowest | 650 ₹74,587.5 |
| 9.00 | Cost & Supply of RCC non pressure spun pipe 600mm Dia with socket and spigot ends as per IS 458/2003 manufactured with sulphate resistence cement with 12 mm HI -alumina lining with rubber ring joints inclusive of cost & conveyance of all materilas & All Labour charges,etc complete WD-M 1042 | 20 | Sqm | 3,150 ₹63,000 Lowest | 3,200 ₹64,000 |
| 10.00 | Providing and Laying of Hot Applied Thermoplastic Compound 2.50mm Thick including Reflectorising Glass Beads as per IRC 35 etc complete as per MORT & H Specifications No. 803 | 170 | Sqm | 884 ₹1,50,280 Lowest | 910 ₹1,54,700 |
Tender Value
₹66.3 L
EMD Value
₹67,000
Closing Date
19 Feb 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director, DRDA, Kancheepuram
O/o The Project Director, DRDA, Kancheepuram
Strengthening of Rajiv Gandhi Nagar Road Km 0/0 to 0/850 (R-437) in Nandambakkam Panchayat at Kundrathur Panchayat Union of Kancheepuram District under Pooled Assigned Revenue 2025-26 having PKG. No.TNKPM-01/PAR/2025-26
2026_RDTN_655910_1
DIPR/967/Tender/2026, Dt.12.02.2026
Open Tender
Civil Works - Roads
Item Wise
180 days
DRDA, Kancheepuram
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹67,000
Yes
6 Mar 2026
12 Feb 2026
19 Feb 2026
12 Feb 2026
19 Feb 2026
12 Feb 2026
Strengthening of Rajiv Gandhi Nagar Road Km 0/0 to 0/850 (R-437) in Nandambakkam Panchayat in Kundrathur Block Estimate Amount Rs.66.28 Lakh
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Bituminous Macadam (Grade-II) 50mm Thick Using VG30 Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 34.04 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Cost & Supply of RCC non pressure spun pipe 600mm Dia with socket and spigot ends as per IS 458/2003 manufactured with sulphate resistence cement with 12 mm HI -alumina lining with rubber ring joints inclusive of cost & conveyance of all materilas & All Labour charges,etc complete WD-M 1042
Providing and Laying of Hot Applied Thermoplastic Compound 2.50mm Thick including Reflectorising Glass Beads as per IRC 35 etc complete as per MORT & H Specifications No. 803
Labour Charges for Fiixing of RCC Spun pipes
GST Amount for providing Service to Government Contract Works for the above Construction Work. { GST Amount is the Total GST Amount for overall quoted amount Construction above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.20 MB
TechnicalBid01.pdf
Tender Documents • 0.71 MB
BOQ_786524.xls
BOQ • 0.40 MB
PriceBid01.pdf
Additional Documents • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .