Tender Value
₹67.2 L
EMD Value
₹1.3 L
Closing Date
7 Jul 2026, 12:15 pm4d left
DSCO Keshav Kumar
Opposite Aggarwal Hospital, Kishanpura Road, Sangrur
Laying and Jointing of RCC UGPL Works, Fixing of ARV, AAV, GV, Construction of Haudies and all other allied works.
2026_DOA_170450_2
DSWC/SAN/2026-27/06
Open Tender
Pipe Laying Works
365 days
Sangrur
Please refer tender documents.
3 documents required · 3 mandatory
₹2,500
₹1.3 L
29 Jun 2026
29 Jun 2026
7 Jul 2026
29 Jun 2026
7 Jul 2026
29 Jun 2026
FINANCIAL BID NO.: DSWC/SAN/2026-2027/06
Rates for Civil Works (Approved by CCS Punjab Chandigarh)
Name of the Firm/Bidder
Phone Number of Bidder Email id of Bidder
Total Estimated Amount of Work Rs.
Quoted by Contractor (As % less of Estimated Amount) Quote (+/-%)
Note: Please quote only figure (upto 2 decimal points) in above blue colour box in minus or plus. Do not put %age sign after this figure. Please check Quoted Rate in Next cell.
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 600 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Shahpur Therri (C/o 20094-R)(Extension), Tehsil-Moonak and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1593.6 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only 149447.808
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 830 /Mtrs 74 Rupee Seventy One Only 61420
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 332 /Joints 332.5 Rupees Two Hundred Eight Only 110390
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (600 mm) 4 /Cut hole 150 Rupees One Hundred Five Only 600
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 3 /Cut hole 41 Rupees Fourty One Only 123
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (600 mm) 4 /Riser & Valve 955 Rupees Seven Hundred Seven Only 3820
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) 3 /Air pipe 288 Rupees Two Hundred Eighty Nine Only 864
Fixing of Gate valves with C.C 1:2:4 (600 mm) 3 /Gate Valve 2755.6 Rupees One Thousand Four Hundared Fifty Five and Forty Six Paise Only 8266.8
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only 750.24
B.B.C 1:8:16 0.6 cum 3870 Rupees Three Thousand Eight Hundred Seventy Only 2322
Plain Cement Concrete 1:2:4 0.14 cum 5104 Rupees Five Thousand One Hundred Four Only 714.5600000000001
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5044.35 Rupees Five Thousand Fourty Four and Thirty Five Paise Only 23960.662500000002
12.5 mm thick cement plaster work 1:4 15.32 cum 202.3 Rupees Two Hundred Two and Thirty Paise Only 3099.2360000000003
RCC Slab 1:2:4 0.21 cum 8200.34 Rupees Eight Thousand Two Hundred And Thirty Four Only 1722.0714
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only 600
Total Cost for ONE Haudi 33168.7699
Total Cost for ZERO Haudis 132676
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only 0
Sign Board (5' X 3') 0 each 4000 Rupees Three Thousand Only 0
Road Cut 0 each 15000 Rupees Fifteen Thousand Only 0
Nimar for jointing the pipe 113.212 Kg 60 Rupees Sixty Only 6792.72
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Total (A) 509446.948
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 400 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Lehal Kalan (C/o 9486-R)(Extension), Tehsil-Lehra and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1796.85 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only 168508.593
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 1210 /Mtrs 71 Rupee Seventy One Only 85910
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 484 /Joints 208 Rupees Two Hundred Eight Only 100672
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (400 mm) 8 /Cut hole 105 Rupees One Hundred Five Only 840
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 3 /Cut hole 41 Rupees Fourty One Only 123
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (400 mm) 8 /Riser & Valve 707 Rupees Seven Hundred Seven Only 5656
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) 3 /Air pipe 289 Rupees Two Hundred Eighty Nine Only 867
Fixing of Gate valves with C.C 1:2:4 (400 mm) 2 /Gate Valve 2052 Rupees One Thousand Four Hundared Fifty Five and Forty Six Paise Only 4104
Fixing of PUMP STAND (1000 MM) (Excavation+Labour and Material used for Foundation & Fixing of Pipe) 1 /Pump Stand 6634 Rupees Two Thousand One Hundared Seventy Three and Ninty Eight Paise Only 6634
Total 373314.593
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only 750.24
B.B.C 1:8:16 0.6 cum 3874 Rupees Three Thousand Eight Hundred Seventy Nine Four Only 2324.4
Plain Cement Concrete 1:2:4 0.14 cum 5114 Rupees Five Thousand One Hundred Fourteen Only 715.96
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 4566.4 Rupees Four Thousand Five Hundred Sixty Six and Forty Paise Only 21690.399999999998
12.5 mm thick cement plaster work 1:4 15.32 cum 202.35 Rupees Two Hundred Two and Thirty Five Paise Only 3100.002
RCC Slab 1:2:4 0.21 cum 8210 Rupees Eight Thousand Two Hundred Ten Only 1724.1
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only 600
Total Cost for ONE Haudi 30905.102
Total Cost for ZERO Haudis 0
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only 0
Sign Board (5' X 3') 0 each 4000 Rupees Three Thousand Only 0
Road Cut 0 each 15000 Rupees Fifteen Thousand Only 0
Nimar for jointing the pipe 66.792 Kg 60 Rupees Sixty Only 4007.52
Sub Total 4007.52
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Total (B) 377322.113
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 400 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Daska (C/o 7300-L)(Extension), Tehsil-Lehra and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 3846.15 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only 360691.947
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 2590 /Mtrs 71 Rupee Seventy One Only 183890
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 1036 /Joints 208.35 Rupees Two Hundred Eight Only 215850.6
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (400 mm) 15 /Cut hole 105 Rupees One Hundred Five Only 1575
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 3 /Cut hole 41 Rupees Fourty One Only 123
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (400 mm) 15 /Riser & Valve 708 Rupees Seven Hundred Seven Only 10620
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) 3 /Air pipe 288 Rupees Two Hundred Eighty Nine Only 864
Fixing of Gate valves with C.C 1:2:4 (400 mm) 3 /Gate Valve 2053 Rupees One Thousand Four Hundared Fifty Five and Forty Six Paise Only 6159
Fixing of PUMP STAND (1100 MM) (Excavation+Labour and Material used for Foundation & Fixing of Pipe) 4 /Pump Stand 6643 Rupees Two Thousand One Hundared Seventy Three and Ninty Eight Paise Only 26572
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only 750.24
B.B.C 1:8:16 0.6 cum 3874 Rupees Three Thousand Eight Hundred Seventy Nine Four Only 2324.4
Plain Cement Concrete 1:2:4 0.14 cum 5114 Rupees Five Thousand One Hundred Fourteen Only 715.96
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 4566.4 Rupees Four Thousand Five Hundred Sixty Six and Forty Paise Only 21690.399999999998
12.5 mm thick cement plaster work 1:4 15.32 cum 202.35 Rupees Two Hundred Two and Thirty Five Paise Only 3100.002
RCC Slab 1:2:4 0.21 cum 8210 Rupees Eight Thousand Two Hundred Ten Only 1724.1
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only 600
Total Cost for ONE Haudi 30905.102
Total Cost for ZERO Haudis 0
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only 0
Sign Board (5' X 3') 0 each 4000 Rupees Three Thousand Only 0
Road Cut 0 each 15000 Rupees Fifteen Thousand Only 0
Nimar for jointing the pipe 142.968 Kg 60 Rupees Sixty Only 8578.08
Sub Total 52632.12384
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 400 mm Dia RCC Pipes, fixing of AVP , Risers, Pump Stand and Gate valve at Village - Salemgarh (C/o 29170/29608/R),Moonak Branch, rajwaha-Ladbanjara,Tehsil Lehra and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 9919.8 /Cum 93.78 Rupees Ninty Three and Seventy Eight Only
Lowering of 400 mm R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 6680 /Mtrs 71 Rupee Seventy One Only
Jointing of class N.P.2 400 mm R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 2672 /Joints 208.12 Rupees Two Hundred Nine and Seventy three Paise Only
Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (400mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 0 /Meter 2000 Rupees Two Thousand Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (400 mm) 82 /Cut hole 105 Rupees One hundred Five Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 30 /Cut hole 41 Rupees Forty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (400mm) 82 /Riser & Valve 714.79 Rupees Seven hundred Fourteen and Seventy Nine Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 30 /Air pipe 291.15 Rupees Two Hundred Ninty One and Fifteen Paise Only
Estimate of Charges for 1200 mm Dia Pump Stand (as Siltation Chamber)
Earth work in Excavation 8 cum 93.78 Rupees Ninty Three and Seventy Eight Paisa Only
Material and Labour Charges For Foundation of Pump stands(1:8:16) 2299.9912
Material and Labour Charges For Fixing of Pump stands 3595.35
Complete Work Total Cost for ONE Pump Stand
Complete Work Total Cost for Six No. Pump Stand (B)
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 1 each 4000 Rupees Four Thousand Only
Fixing of gate valve (400 mm) 11 each 2059.79 Rupees Two Thousand Fifty Nine and Seventy Nine Paise Only
Nimar for jointing the pipe 368.736 Per kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 1 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 661.972 per tonnes 172.94 Rupees One Hundred Seventy Two and Ninty Four paise only
Total Credit of Damaged Lined Water Channel Existing on Site to be Deducted from the Bill of Agency(D) 0
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 450 mm Dia RCC Pipes, fixing of AVP , Risers and Pump Stand at Village - Karonda (C/o 26950/L), Dhanaouri Feeder, Tehsil Moonak and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 12281.08 /Cum 93.78 Rupees Ninty Three and Seventy Eight Only
Lowering of 450 mm R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 7628 /Mtrs 71 Rupee Seventy One Only
Jointing of class N.P.2 450 mm R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 3051.2 /Joints 235.37 Rupees Two Hundred Thirty Five and Seventy Eight Paise Only
Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (450mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 0 /Meter 2000 Rupees Two Thousand Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (450 mm) 98 /Cut hole 116 Rupees One hundred Sixteen Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 67 /Cut hole 41 Rupees Forty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (450mm) 98 /Riser & Valve 767.99 Rupees Seven hundred Seventy One and Thirty Two Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 67 /Air pipe 288.62 Rupees Two Hundred Ninty and Two Paise Only
Cost of Other Items
Providing and Fixing of jaal 0 each 4500 Rupees Four Thousand Only
Sign Board (5' X 3') 1 each 4000 Rupees Four Thousand Only
Fixing of gate valve (450 mm) 10 each 2175.38 Rupees One Thousand Seven Hundred thirty and Eighteen Paise Only
Nimar for jointing the pipe 467.444 Per kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 1 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 923.8 per tonnes 172.94 Rupees One Hundred Seventy Two and Ninty Four paise only
Total Credit of Damaged Lined Water Channel Existing on Site to be Deducted from the Bill of Agency(D) 0
Grand Total (A+B+C+D+E)
Total Credit of Damaged Lined Water Channel Existing on Site to be Deducted from the Bill of Agency(D)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
FBUGPL262706.xls
Additional Documents • 0.18 MB
NITUGPL262706.pdf
Tender Documents • 0.50 MB
DNITUGPL262706.pdf
Tender Documents • 0.52 MB
Download all tender documents and submit your bid