Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 LAdmitted-Finance | ₹6.5 L | L1 | Admitted-Finance |
| 2 | L2₹6.6 L+₹8,000 (1.23%)Admitted-Finance | ₹6.6 L+₹8,000 (1.23%) | L2 | Admitted-Finance |
| 3 | L3₹6.7 L+₹17,000 (2.62%)Admitted-Finance | ₹6.7 L+₹17,000 (2.62%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S SUBHASH TRADERS L2 | M/S ABHISHEK CONSTRUCTION L3 | M/S SAVITRI ENTERPRISES L1 |
|---|---|---|---|---|---|---|
| 1.01ERRECTION & LABOUR CHARGES:- | ||||||
| 1.02 | Construction of Fire Wall between Power Transformes in size (5X4 Mtr) | 1 | Job | 1,98,000 ₹1,98,000 | 2,00,000 ₹2,00,000 | 1,96,000 ₹1,96,000 Lowest |
| 1.03 | Construction of Room in size (3X3 Mtr) | 1 | Job | 1,75,000 ₹1,75,000 | 1,78,000 ₹1,78,000 | 1,73,000 ₹1,73,000 Lowest |
| 1.04 | Labour Charges for earthing of Power Transformers- (04 Nos), digging of 60 fit Borewell type pit (1.5-inch diameter) up to watar Lable, to install 60 fit long M.S. Pipe 1.5-inch diameter, followed by connection of M.S. Stirp 50X6 mm size for Suitable length to G.I. Pipe through proper welding ( Aluminium paint covering of welded joint) with tightening of nuts & bolts and fiiing of spaces by homogeneous mixture of coke & sault.This includes connection of M.S Strip to sepret common pit as there will be one pit of each earthing At 33/11 KV S/S RASOLPIUR. ROHANIYA AND JAGATPUR, All required material will be provided by contractor. | 8 | Job | 35,500 ₹2,84,000 | 36,000 ₹2,88,000 | 35,000 ₹2,80,000 Lowest |
Tender Value
₹7 L
EMD Value
₹7,000
Closing Date
19 Sept 2025, 3:00 pmClosed
SE EDC II GORA BAZAR RAEBARELI
OFFICE OF SE EDC II GORA BAZAR RAEBARELI
ELECTRICAL WORKS UNDER BUSINESS PLAN 2025-26 IN JURISDICTION OF EDD UNCHAHAR
2025_MVVNL_1068790_1
TENDER NO. 42/EDCR-II/2025-26
Open Tender
Electrical Works
Item Rate
30 days
EDD UNCHAHAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
ICICI BANK A/C 081205500344/ IFS CODE ICIC0000812
₹7,000
Yes
23 Sept 2025
26 Aug 2025
20 Sept 2025
6 Sept 2025
19 Sept 2025
6 Sept 2025
Amount
ERRECTION & LABOUR CHARGES:-
Construction of Fire Wall between Power Transformes in size (5X4 Mtr)
Construction of Room in size (3X3 Mtr)
Labour Charges for earthing of Power Transformers- (04 Nos), digging of 60 fit Borewell type pit (1.5-inch diameter) up to watar Lable, to install 60 fit long M.S. Pipe 1.5-inch diameter, followed by connection of M.S. Stirp 50X6 mm size for Suitable length to G.I. Pipe through proper welding ( Aluminium paint covering of welded joint) with tightening of nuts & bolts and fiiing of spaces by homogeneous mixture of coke & sault.This includes connection of M.S Strip to sepret common pit as there will be one pit of each earthing At 33/11 KV S/S RASOLPIUR. ROHANIYA AND JAGATPUR, All required material will be provided by contractor.
M/S SUBHASH TRADERS (BID ID -5544530)
M/S ABHISHEK CONSTRUCTION (BID ID -5544540)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .