Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.0 LAdmitted-Finance | ₹27.0 L | L1 | Admitted-Finance |
| 2 | L2₹29.7 L+₹2.7 L (10.1%)Admitted-Finance 114 BARH CHONDI BARH PATNA BIHAR 803213 | PATNA | PATNA | BIHAR | 803213 | ₹29.7 L+₹2.7 L (10.1%) | L2 | Admitted-Finance |
| 3 | L3₹30.1 L+₹3.1 L (11.5%)Admitted-Finance D 154 ADARSH NAGAR NARMADA ROAD JABALPUR MP 482001 | JABALPUR | MADHYA PRADESH | 482001 | ₹30.1 L+₹3.1 L (11.5%) | L3 | Admitted-Finance |
| 4 | L4₹30.4 L+₹3.5 L (12.9%)Admitted-Finance D 154 ADARSH NAGAR JABALPUR MP 482001 | JABALPUR | MADHYA PRADESH | 482001 | ₹30.4 L+₹3.5 L (12.9%) | L4 | Admitted-Finance |
| 5 | L5₹31.9 L+₹5.0 L (18.4%)Admitted-Finance | ₹31.9 L+₹5.0 L (18.4%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MAA SHARDA CONSTRUCTION L2 | deepak kumar vishwakarma L8 | M/S BHARTI ENTERPRISES L5 | RAM ASSOCIATES L3 | R R VISHWAKARMA CONSTRUCTION CO L6 | LAL SINGH & SONS L9 | RP ANAND L4 | RASTOGI BUILDERS L1 | M/S N K SONKAR L7 | M/S falcon Builder L10 | HAFEEZ CONSTRUCTION L12 | Sachdeva Enterprises L11 | SHRI KRISHNA CONSTRUCTIONS L13 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of brickwork or stone/ boulder masonry, built in cement mortar including all quoins, arches, pillars, wall etc, but excluding ashlar facings, built in cement mortar complete all as specified and as directed.. | 73 | Cum | 100 ₹7,300 | 50 ₹3,650 Lowest | 100 ₹7,300 | 600 ₹43,800 | 100 ₹7,300 | 50 ₹3,650 Lowest | 150 ₹10,950 | 100 ₹7,300 | 100 ₹7,300 | 250 ₹18,250 | 100 ₹7,300 | 150 ₹10,950 | 200 ₹14,600 |
| 2.00 | Demolition of cement concrete in ground floor paving n. exc. 15 cm thickness below or above ground level complete all as specified and directed | 65 | Cum | 100 ₹6,500 | 50 ₹3,250 Lowest | 100 ₹6,500 | 500 ₹32,500 | 100 ₹6,500 | 50 ₹3,250 Lowest | 150 ₹9,750 | 70 ₹4,550 | 90 ₹5,850 | 350 ₹22,750 | 100 ₹6,500 | 100 ₹6,500 | 200 ₹13,000 |
| 3.00 | Dismantling wrought iron or mild steel work of any description not oterwise provide for complete all as specified and directed | 6.5 | Per Quintal | 100 ₹650 | 50 ₹325 Lowest | 100 ₹650 | 1,000 ₹6,500 | 100 ₹650 | 100 ₹650 | 100 ₹650 | 90 ₹585 | 450 ₹2,925 | 3,200 ₹20,800 | 300 ₹1,950 | 100 ₹650 | 500 ₹3,250 |
| 4.00 | Dismantling posts or struts embedded in Concrete, brick work, masonry, etc.(wood, steel or R.C.C.) any section, including taking out embedded portion and making good disturbed ground. | 300 | RM | 25 ₹7,500 | 20 ₹6,000 | 10 ₹3,000 | 5 ₹1,500 Lowest | 10 ₹3,000 | 20 ₹6,000 | 10 ₹3,000 | 8 ₹2,400 | 35 ₹10,500 | 50 ₹15,000 | 10 ₹3,000 | 20 ₹6,000 | 100 ₹30,000 |
| 5.00 | Dismantling fencing wire mesh, any type complete all as specified and directed | 1,000 | Sqm | 5 ₹5,000 | 3 ₹3,000 Lowest | 5 ₹5,000 | 5 ₹5,000 | 10 ₹10,000 | 10 ₹10,000 | 9 ₹9,000 | 8.5 ₹8,500 | 5 ₹5,000 | 50 ₹50,000 | 10 ₹10,000 | 10 ₹10,000 | 10 ₹10,000 |
| 6.00 | Excavation in post holes (or similar holes) each not exceeding 0.50 Cum meter in any type of soil, getting out, returning filling in watering and ramming earth or broken rubble mixed with earth around in layers not exceeding 25 cm and removing surplus soil to a distance n. exc 50 mtr and making good surface complete all as specified and directed. | 95 | Each | 75 ₹7,125 | 50 ₹4,750 | 75 ₹7,125 | 100 ₹9,500 | 200 ₹19,000 | 50 ₹4,750 | 30 ₹2,850 Lowest | 40 ₹3,800 | 90 ₹8,550 | 500 ₹47,500 | 100 ₹9,500 | 200 ₹19,000 | 200 ₹19,000 |
| 7.00 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out in soft/loose soil | 300 | Cum | 90 ₹27,000 | 70 ₹21,000 Lowest | 300 ₹90,000 | 150 ₹45,000 | 200 ₹60,000 | 200 ₹60,000 | 100 ₹30,000 | 70 ₹21,000 Lowest | 100 ₹30,000 | 130 ₹39,000 | 100 ₹30,000 | 200 ₹60,000 | 200 ₹60,000 |
| 8.00 | Excavation in trenches in soft /loose soil, n exc 1.5m wide and depth exc 1.5m but n exc 3.0m ;for foundation etc.or for shafts well cesspit,maholes, pier holes etc.n exc 10 Sqm on plan complete all as specified and as directed. | 40 | Cum | 100 ₹4,000 | 100 ₹4,000 | 350 ₹14,000 | 200 ₹8,000 | 200 ₹8,000 | 200 ₹8,000 | 150 ₹6,000 | 90 ₹3,600 Lowest | 220 ₹8,800 | 150 ₹6,000 | 100 ₹4,000 | 250 ₹10,000 | 200 ₹8,000 |
| 9.00 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm.in soft/loose soil complete all as specified and directed. | 170 | Cum | 70 ₹11,900 | 50 ₹8,500 | 20 ₹3,400 | 30 ₹5,100 | 100 ₹17,000 | 20 ₹3,400 | 15 ₹2,550 Lowest | 20 ₹3,400 | 35 ₹5,950 | 120 ₹20,400 | 100 ₹17,000 | 50 ₹8,500 | 200 ₹34,000 |
| 10.00 | Removing excavated material n exc. 50m and depositing where directed at a level n exc. 1.5 m above the starting point soil complete all as specified and directed. | 170 | Cum | 70 ₹11,900 | 50 ₹8,500 | 50 ₹8,500 | 30 ₹5,100 | 100 ₹17,000 | 20 ₹3,400 Lowest | 60 ₹10,200 | 50 ₹8,500 | 50 ₹8,500 | 50 ₹8,500 | 100 ₹17,000 | 50 ₹8,500 | 200 ₹34,000 |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
22 Jul 2026, 6:00 pmClosed
GE (E) JABALPUR
GE (E) JABALPUR-482011
REPAIR TO DRAIN, PATH, CULVERT, COMPOUND WALL, FENCING, STEEL GATE, HARDSTANDING, COVER SLAB, CLEANING OF SEWAGE LINE, SEPTIC TANK, GULLY TRAP OF OTM AND MD ACCN AT SIGNAL RECORDS AND KHANDARI FARM UNDER AGE BR -I OF GE (EAST) JABALPUR
2026_MES_775632_1
8895/E8
Open Tender
Civil Works
Item Rate
240 days
GE (EAST) JABALPUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE (EAST) JABALPUR
₹90,000
Yes
27 Jul 2026
1 Jul 2026
27 Jul 2026
1 Jul 2026
22 Jul 2026
15 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of brickwork or stone/ boulder masonry, built in cement mortar including all quoins, arches, pillars, wall etc, but excluding ashlar facings, built in cement mortar complete all as specified and as directed.. | 73 | Cum | - | - |
| 2 | Demolition of cement concrete in ground floor paving n. exc. 15 cm thickness below or above ground level complete all as specified and directed | 65 | Cum | - | - |
| 3 | Dismantling wrought iron or mild steel work of any description not oterwise provide for complete all as specified and directed | 6.5 | Per Quintal | - | - |
| 4 | Dismantling posts or struts embedded in Concrete, brick work, masonry, etc.(wood, steel or R.C.C.) any section, including taking out embedded portion and making good disturbed ground. | 300 | RM | - | - |
| 5 | Dismantling fencing wire mesh, any type complete all as specified and directed | 1,000 | Sqm | - | - |
| 6 | Excavation in post holes (or similar holes) each not exceeding 0.50 Cum meter in any type of soil, getting out, returning filling in watering and ramming earth or broken rubble mixed with earth around in layers not exceeding 25 cm and removing surplus soil to a distance n. exc 50 mtr and making good surface complete all as specified and directed. | 95 | Each | - | - |
| 7 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out in soft/loose soil | 300 | Cum | - | - |
| 8 | Excavation in trenches in soft /loose soil, n exc 1.5m wide and depth exc 1.5m but n exc 3.0m ;for foundation etc.or for shafts well cesspit,maholes, pier holes etc.n exc 10 Sqm on plan complete all as specified and as directed. | 40 | Cum | - | - |
| 9 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm.in soft/loose soil complete all as specified and directed. | 170 | Cum | - | - |
| 10 | Removing excavated material n exc. 50m and depositing where directed at a level n exc. 1.5 m above the starting point soil complete all as specified and directed. | 170 | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
TENDER8895.pdf
Tender Documents • 1.16 MB
BOQ_868543.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .