Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹11.8 LAccepted-AOC | ₹11.8 L | L-1 | Accepted-AOC AOC |
| 2 | L-2₹14.0 LRejected-Finance | ₹14.0 L | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹14.0 LRejected-Finance | ₹14.0 L | L-3 | Rejected-Finance L-3 |
| 4 | L-4₹14.0 LRejected-Finance | ₹14.0 L | L-4 | Rejected-Finance L-4 |
| 5 | L-5₹14.5 LRejected-Finance 0 AJAY KUMAR 85 HASTAM HASTAM BANDA UTTAR PRADESH 210001 HASTAM BANDA UTTAR PRADESH 210001 UDYAM UP 13 0007628 | BANDA | UTTAR PRADESH | 210001 | ₹14.5 L | L-5 | Rejected-Finance L-5 |
| Sl No | Description | Qty | Unit | SUBHASH SINGH RANA L2 | M/S SHREE JEE CONSTRUCTIONS L4 | M/S G.S. CONSTRUCTION L6 | Phoughat Construction L1 | M/s Ajay Kumar Contractor L5 | M/S PRABHAT CONTRACTOR AND ENGINEERS L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material with in a 60 M distance.as per direction Engineer-in-charge | 110 | Cum | 150 ₹16,500 | 100 ₹11,000 | 279 ₹30,690 | 150 ₹16,500 | 91 ₹10,010 | 70 ₹7,700 |
| 2.00 | Dismantling reinforcement cement concrete in 1:2:4 including stacking of material with in a 60 M distance. | 14 | Cum | 500 ₹7,000 | 200 ₹2,800 | 508 ₹7,112 | 67 ₹938 | 91 ₹1,274 | 100 ₹1,400 |
| 3.00 | Earth work in excavation in all type of soil in in foundation with ramming and dressing. | 111 | Cum | 30 ₹3,330 | 100 ₹11,100 | 99 ₹10,989 | 500 ₹55,500 | 54 ₹5,994 | 60 ₹6,660 |
| 4.00 | Laying C.C. 1:3:6 in foundation with cement, coarse sand & stone grit 25 to 37.25 mm. size including all cost of material, labour and T&P etc. complete. | 40 | Cum | 5,000 ₹2 L | 4,700 ₹1.9 L | 5,743 ₹2.3 L | 1,500 ₹60,000 | 5,400 ₹2.2 L | 4,800 ₹1.9 L |
| 5.00 | M-100 brick work in 1:4 cement and coarse sand mortar including all cost of material, labour and T&P etc. complete. | 111 | Cum | 5,000 ₹5.5 L | 5,400 ₹6.0 L | 4,512.5 ₹5.0 L | 3,200 ₹3.6 L | 5,400 ₹6.0 L | 5,615 ₹6.2 L |
| 6.00 | Laying R.C.C. in 1:1.5:3cement, coarse sand and stone grit 10 to 25 mm. size.all cost of material, labour and T&P etc. complete. | 35 | Cum | 6,500 ₹2.3 L | 6,800 ₹2.4 L | 6,974 ₹2.4 L | 5,600 ₹2.0 L | 5,800 ₹2.0 L | 6,600 ₹2.3 L |
| 7.00 | Laying C.C. in 1:1.5:3cement, coarse sand and stone grit 10 to 25 mm. size.all cost of material, labour and T&P etc. complete | 4.7 | Cum | 6,000 ₹28,200 | 6,500 ₹30,550 | 6,974 ₹32,777.80 | 575 ₹2,702.50 | 5,800 ₹27,260 | 6,600 ₹31,020 |
| 8.00 | P/Laying of steel Reinforcement in slab & Lintel i/c cost of all material ,labour and T&P etc | 2.4 | MT | 70,000 ₹1.7 L | 70,000 ₹1.7 L | 57,435 ₹1.4 L | 800 ₹1,920 | 81,000 ₹1.9 L | 70,000 ₹1.7 L |
| 9.00 | P/LCentering & Shuttering for R. C. C. work i/c all cost of material, labour and T&P etc. complete.. | 123 | Sqm. | 850 ₹1.0 L | 450 ₹55,350 | 820 ₹1.0 L | 840 ₹1.0 L | 300 ₹36,900 | 450 ₹55,350 |
| 10.00 | P/L cement Struck deep pointing in 1:2 cement sand mortar i/c all cost of material, labour and T&P etc. complete. | 105 | Sqm. | 90 ₹9,450 | 138 ₹14,490 | 137.5 ₹14,437.50 | 290 ₹30,450 | 300 ₹31,500 | 100 ₹10,500 |
Tender Value
₹17.1 L
EMD Value
₹34,140
Closing Date
2 Aug 2025, 3:00 pmClosed
EE, BDGC, BSR
EE, BDGC, BSR
Reconstruction of VRB at km. 0.864 of Dhoom Dujana Drain.
2025_UPIDC_1060642_1
06/EE/2025-26
Open Tender
Civil Works
90 days
Bulandshahr
FEE/EMD/TEC
2 documents required · 2 mandatory
₹354
₹34,140
23 Apr 2026
28 Jul 2025
2 Aug 2025
28 Jul 2025
2 Aug 2025
28 Jul 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.24 MB
BOQ_1932041.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid